Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
25 May 2026, 4:00 pmClosed
office of the Executive Enginner Nyoma
office of the office of the Executive Engineer Nyoma
Construction of Residential House for Frontline Settlement at Chumoor for two set Block I
2026_PWD_18925_9
67 of RnB Nyoma
Open Tender
Civil Works - Buildings
Percentage
180 days
Nyoma Leh
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
office of the Executive Enginer Rnb Nyoma
₹2.1 L
12 May 2026
11 May 2026
26 May 2026
11 May 2026
25 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 390.46 | cum | 278.09 | ₹1,08,583.02 |
| 2 | Dumping stone including cost of stones in Horizontal on level | 27.11 | cum | 953.03 | ₹25,836.64 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources | 27.11 | Cum | 5,725.33 | ₹1,55,213.7 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size | 82.09 | cum | 11,102.31 | ₹9,11,388.63 |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 209.12 | cum | 5,730.39 | ₹11,98,339.16 |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 14.26 | cum | 4,010.9 | ₹57,195.43 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 6,566.82 | Kg | 109.33 | ₹7,17,950.43 |
| 8 | Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand | 24.51 | cum | 5,691.09 | ₹1,39,488.62 |
| 9 | Providing & fixing upto floor five level precast sundried mudbricks in mud mortar using approved quality mud with carriage of material complete. | 201.04 | cum | 5,519.05 | ₹11,09,549.81 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | 306.15 | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.20 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_45219.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .