Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC DALIPORA PULWAMA | PULWAMA | PULWAMA | JAMMU AND KASHMIR | L1 | Accepted-AOC Lowest Bidder, L1 | |
| 2 | L2₹3.7 Cr+₹45.0 L (13.8%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.9 Cr+₹62.4 L (19.1%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹5.4 Cr
EMD Value
₹10.7 L
Closing Date
9 Aug 2025, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engg, PMGSY Circle Sgr
Office of Superintending Engineer, PMGSY Circle Srinagar
Refer to BOQ
2025_KSRRD_143625_1
E-NIT 03/SE/PMGSY/S/SGR of 2025-26, Dated 29-07-2025
Open Tender
Civil Works - Roads
Percentage
730 days
Pulwama
Refer to Technical Bid
22 documents required · 22 mandatory
₹8,500
₹10.7 L
Office of Superintending Engg, PMGSY Circle Sgr
18 Sept 2025
30 Jul 2025
11 Aug 2025
30 Jul 2025
9 Aug 2025
4 Aug 2025
4 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A:- Initial Rehabilitation | - | - | - | - |
| 2 | Wet Mix Macadam (WMM)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. including cost and carriage of all materials from approved source to site of work with all leads lifts, loading, unloading and Octori (finished work to be measured) complete job | 731.25 | Cum | 2,128.68 | ₹15,56,597.25 |
| 3 | Providing and laying 50mm thick bituminius macadam with hot mix plant using crushed aggregate of grading as per table 500.4 premixed with bituminious binder, transported to site of work upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per technical specificaion clause 504 including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octori (finished work to be measured) complete job | 2,294.88 | Cum | 8,409.42 | ₹1,92,98,609.77 |
| 4 | Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical specification clause 307. By mechanical means | 1,000 | Rm | 27.28 | ₹27,280 |
| 5 | Construction of shoulder by way of laying of Granular sub-base / base / surface course with local materials (Table 400.13)by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers manually on prepared surface , mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using naturally occuring gravel. ( Complete Job Finished item to be Measured). | 1,599.75 | CUM | 1,385.62 | ₹22,16,645.59 |
| 6 | PCC Drain | - | - | - | - |
| 7 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom ordinary soil. upto 3 m depth Finished work to be measured, complete Job) | 630 | CUM | 520.2 | ₹3,27,726 |
| 8 | Type B (First Class) Bedding: Laying (First Class) bedding of well compacted sand, moorum or approved granular material as per Clause 1105 Finished work to be measured, complete Job) | 135 | CUM | 1,548.21 | ₹2,09,008.35 |
| 9 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C Grade M-10 Nominal mix 1:3:6) Finished work to be measured, complete Job) | 90 | CUM | 5,491.63 | ₹4,94,246.7 |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C Grade M-15 Nominal mix 1:2.5:5). Finished work to be measured, complete Job) | 262.76 | Cum | 5,569.51 | ₹14,63,444.45 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_222830.xls
BOQ • 0.48 MB
177039831.pdf
Tender Documents • 6.09 MB
177039833.html
Tender Documents • 0.07 MB
BidData.pdf
Tender Documents • 2.21 MB
SBD10160.pdf
Tender Documents • 1.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .