| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹26.2 LAccepted-AOC CAMP BIRSINGHPUR PALI DIST UMARIA MP PIN 484555 | BIRSINGHPUR PALI | UMARIA | MP | 484555 | ₹26.2 L | L-1 | Accepted-AOC L-1 bidder |
| 2 | L-2₹30.3 L+₹4.1 L (15.6%)Rejected-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹30.3 L+₹4.1 L (15.6%) | L-2 | Rejected-Finance Rejected by Tender Committee due to L-2 bidder |
| Sl No | Description | Qty | Unit | RAJENDRA KUMAR MISHRA L1 | ABADH KISHOR SHARMA L2 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 1.01 | Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance.
(In coal) | 47.59 | Per Cum | 1,512.58 ₹71,983.68 | 1,500 ₹71,385 Lowest |
| 1.02 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Sand : | 89.73 | Per Cum | 422.63 ₹37,922.59 | 422 ₹37,866.06 Lowest |
| 1.03 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Bricks : | 1,15,530 | Per No | 0.79 ₹91,268.7 Lowest | 0.79 ₹91,268.7 Lowest |
| 1.04 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Cement : | 405 | Per Bag (50 Kg) | 12.24 ₹4,957.2 Lowest | 12.24 ₹4,957.2 Lowest |
| 1.05 | Brick work with fly ash bricks in foundation and plinth (upto height 1.50 Mtr. From floor) in cement morter 1:6 (1:Cement, 6: coarse sand) complete as per instruction of EIC.
(excluding material cost) | 122.75 | Per Cum. | 2,878.25 ₹3,53,305.19 Lowest | 2,900 ₹3,55,975 |
| 1.06 | Brick work with fly ash bricks in superstructure (above height 1.50 Mtr. From floor) in cement morter 1:6 (1:Cement, 6: coarse sand) complete as per instruction of EIC.
(excluding material cost) | 108.31 | Per Cum. | 4,592.1 ₹4,97,370.35 Lowest | 4,600 ₹4,98,226 |
| 1.07 | 12 mm thick cement plaster (1:6, 1 Cement: 6 coarse sand) on brick work up to 5 mtr. And above in UG including curing etc. complete.
(excluding cost of materials) | 1,647.29 | Per Sqm | 216 ₹3,55,814.64 Lowest | 400 ₹6,58,916 |
| 1.08 | Material rate for : Coarse Sand : | 89.73 | Per Cum | 1,600 ₹1,43,568 Lowest | 1,700 ₹1,52,541 |
| 1.09 | Material rate for : Cement : | 405 | Per Bag | 300 ₹1,21,500 Lowest | 302.5 ₹1,22,512.5 |
Tender Value
₹29.2 L
EMD Value
₹36,500
Closing Date
27 Apr 2026, 5:00 pmClosed
Area Survey Officer Johilla Area
AHQ Johilla Area
Construction of 73 Nos. Ventilation Stoppings in 6 LE Section panel and 50 LE Section of IV B Seam and 1 LE Section of Seam III at Piparia Colliery, Umaria Sub Area, Johilla Area.
2026_SECL_358313_1
SECL/GM/JOH/Survey/ eTender/26-27/01 Dt 13.04.2026
Open Tender
Civil Works - Others
Item Rate
365 days
Piparia Colliery
4 documents required · 4 mandatory
₹36,500
1 Jun 2026
14 Apr 2026
28 Apr 2026
14 Apr 2026
27 Apr 2026
15 Apr 2026
14 Apr 2026 - 21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance.
(In coal) | - | Per Cum | - | - |
| 1.02 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Sand : | - | Per Cum | - | - |
| 1.03 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Bricks : | - | Per No | - | - |
| 1.04 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Cement : | - | Per Bag (50 Kg) | - | - |
| 1.05 | Brick work with fly ash bricks in foundation and plinth (upto height 1.50 Mtr. From floor) in cement morter 1:6 (1:Cement, 6: coarse sand) complete as per instruction of EIC.
(excluding material cost) | - | Per Cum. | - | - |
| 1.06 | Brick work with fly ash bricks in superstructure (above height 1.50 Mtr. From floor) in cement morter 1:6 (1:Cement, 6: coarse sand) complete as per instruction of EIC.
(excluding material cost) | - | Per Cum. | - | - |
| 1.07 | 12 mm thick cement plaster (1:6, 1 Cement: 6 coarse sand) on brick work up to 5 mtr. And above in UG including curing etc. complete.
(excluding cost of materials) | - | Per Sqm | - | - |
| 1.08 | Material rate for : Coarse Sand : | - | Per Cum | - | - |
| 1.09 | Material rate for : Cement : | - | Per Bag | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tendernotice_2.pdf
PDF • 2.02 MB
Tendernotice_3.pdf
PDF • 1.23 MB
BOQ_371188.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .