| 1 | L-1₹26.2 LAccepted-AOC CAMP BIRSINGHPUR PALI DIST UMARIA MP PIN 484555 | BIRSINGHPUR PALI | UMARIA | MP | 484555 | ₹26.2 L | L-1 | Accepted-AOC L-1 bidder |
| 2 | L-2₹30.3 LRejected-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹30.3 L | L-2 | Rejected-Finance Rejected by Tender Committee due to L-2 bidder |
| Sl No | Description | Qty | Unit | RAJENDRA KUMAR MISHRA L1 | ABADH KISHOR SHARMA L2 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 1.01 | Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance.
(In coal) | 47.59 | Per Cum | 1,512.58 ₹71,983.68 | 1,500 ₹71,385 |
| 1.02 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Sand : | 89.73 | Per Cum | 422.63 ₹37,922.59 | 422 ₹37,866.06 |
| 1.03 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Bricks : | 1,15,530 | Per No | 0.79 ₹91,268.70 | 0.79 ₹91,268.70 |
| 1.04 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Cement : | 405 | Per Bag (50 Kg) | 12.24 ₹4,957.20 | 12.24 ₹4,957.20 |
| 1.05 | Brick work with fly ash bricks in foundation and plinth (upto height 1.50 Mtr. From floor) in cement morter 1:6 (1:Cement, 6: coarse sand) complete as per instruction of EIC.
(excluding material cost) | 122.75 | Per Cum. | 2,878.25 ₹3.5 L | 2,900 ₹3.6 L |
| 1.06 | Brick work with fly ash bricks in superstructure (above height 1.50 Mtr. From floor) in cement morter 1:6 (1:Cement, 6: coarse sand) complete as per instruction of EIC.
(excluding material cost) | 108.31 | Per Cum. | 4,592.1 ₹5.0 L | 4,600 ₹5.0 L |
| 1.07 | 12 mm thick cement plaster (1:6, 1 Cement: 6 coarse sand) on brick work up to 5 mtr. And above in UG including curing etc. complete.
(excluding cost of materials) | 1,647.29 | Per Sqm | 216 ₹3.6 L | 400 ₹6.6 L |
| 1.08 | Material rate for : Coarse Sand : | 89.73 | Per Cum | 1,600 ₹1.4 L | 1,700 ₹1.5 L |
| 1.09 | Material rate for : Cement : | 405 | Per Bag | 300 ₹1.2 L | 302.5 ₹1.2 L |
Updated dates
Tender Value
₹29.2 L
EMD Value
₹36,500
Closing Date
1 May 2026, 5:00 pmClosed
Area Survey Officer Johilla Area
AHQ Johilla Area
Construction of 73 Nos. Ventilation Stoppings in 6 LE Section panel and 50 LE Section of IV B Seam and 1 LE Section of Seam III at Piparia Colliery, Umaria Sub Area, Johilla Area.
2026_SECL_358313_1
SECL/GM/JOH/Survey/ eTender/26-27/01 Dt 13.04.2026
Open Tender
Civil Works - Others
365 days
Piparia Colliery
4 documents required · 4 mandatory
₹36,500
1 Jun 2026
14 Apr 2026
2 May 2026
14 Apr 2026
1 May 2026
15 Apr 2026
14 Apr 2026 - 21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Item Description/ Heading | ||||||
| 1.01 | Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance.
(In coal) | - | Per Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.02 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Sand : | - | Per Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.03 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Bricks : | - | Per No | - | - | BI01010001010000000000000515BI0100001118 |
| 1.04 | Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.)
For Cement : | - | Per Bag (50 Kg) | - | - | BI01010001010000000000000515BI0100001119 |
| 1.05 | Brick work with fly ash bricks in foundation and plinth (upto height 1.50 Mtr. From floor) in cement morter 1:6 (1:Cement, 6: coarse sand) complete as per instruction of EIC.
(excluding material cost) | - | Per Cum. | - | - | BI01010001010000000000000515BI0100001120 |
| 1.06 | Brick work with fly ash bricks in superstructure (above height 1.50 Mtr. From floor) in cement morter 1:6 (1:Cement, 6: coarse sand) complete as per instruction of EIC.
(excluding material cost) | - | Per Cum. | - | - | BI01010001010000000000000515BI0100001121 |
| 1.07 | 12 mm thick cement plaster (1:6, 1 Cement: 6 coarse sand) on brick work up to 5 mtr. And above in UG including curing etc. complete.
(excluding cost of materials) | - | Per Sqm | - | - | BI01010001010000000000000515BI0100001122 |
| 1.08 | Material rate for : Coarse Sand : | - | Per Cum | - | - | BI01010001010000000000000515BI0100001127 |
| 1.09 | Material rate for : Cement : | - | Per Bag | - | - | BI01010001010000000000000515BI0100001129 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tendernotice_2.pdf
PDF • 2.02 MB
Tendernotice_3.pdf
PDF • 1.23 MB
BOQ_371188.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid