Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.6 L+₹19,655.60 (5.73%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.9 L+₹44,163.84 (12.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.0 L+₹58,868.78 (17.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.1 L+₹68,672.07 (20.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹14,700
Closing Date
31 Jul 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONSTT OF BOUNDARY WALL AT MIDDLE 23SCHOOL MAIDANPORA A
2026_RDPR_317514_21
NIT NO 75 of 2026-27 CDF GEN
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹14,700
12 Aug 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
24 Jul 2026 - 24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations,including dressing of sides and ramming of bottoms lift upto 1.0 m, including getting out excavated earth and disposal of surplus excavated earth as directed by engineer incharge. | 8.13 | CUM | 479.3 | ₹3,896.71 |
| 2 | Providing and Laying of dry stone soling hand packed including all carriages complete | 11.34 | CUM | 900 | ₹10,206 |
| 3 | Providing and Laying of 1:4:8 mix cement concrete cj | 1.01 | CUM | 0.01 | ₹0.01 |
| 4 | Providing and laying in position reinforeced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 34.64 | CUM | 5,733.6 | ₹1,98,611.9 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 61 | SQM | 286 | ₹17,446 |
| 6 | Brickwork WITH COMMON BRUNT CLAY( NON MODULAR) BRICK OF CLASSS DESIGNATION 7.5 IN FOUNDATION AND PLINTH INCULDING CURING 1;6 MIX | 20.21 | CUM | 9,071 | ₹1,83,324.91 |
| 7 | Providing and laying 40 MM THICK DPC CEMENT CONCRETE COPING COURCE | 12.06 | SQM | 346 | ₹4,172.76 |
| 8 | CARRIAGE OF BRICKS BY 140 KM | 9,601 | cum | 4.5 | ₹43,204.5 |
| 9 | Providing and laying of virtified tiles floor tiles in different size with water abosotion less than 0.08% of approved brand | 1 | CUM | 0.01 | ₹0.01 |
| 10 | Carriage(Mechanical) of Materials, STONES for an avg. lead of 35KM HL. | 46.78 | CUM | 605 | ₹28,301.9 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1040949.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .