Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | L1 | Accepted-AOC L1 is quoted less than tender value | |
| 2 | L2₹3.8 L+₹4,032.24 (1.07%)Rejected-AOC | L2 | Rejected-AOC L2 is quoted more than tender value |
Tender Value
Refer Docs
EMD Value
₹3,840
Closing Date
11 Mar 2024, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER
THE BLOCK DEVELOPMENT OFFICER,KANIYAMBADI.
VELLORE DISTRICT IMPROVEMENT DESILTING AND STEPS MODHIRANKULAM IN SANTHANAKOTTAI AT VALLAM PANCHAYAT AT KANIYAMBADI BLOCK AGAMT II 2024-25 PACKAGE NO 06.
2024_RDTN_442683_1
A9/244/2024
Open Tender
Civil Works
Item Rate
180 days
THE BLOCK DEVELOPMENT OFFICE, KANIYAMBADI.
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3,840
31 May 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
Amount
VELLORE DISTRICT IMPROVEMENT DESILTING AND STEPS MODHIRANKULAM IN SANTHANAKOTTAI @ VALLAM PANCHAYAT AT KANIYAMBADI BLOCK AGAMT II 2024-25 PACKAGE NO 06.
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds,
Construction of Bhathing Ghat
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds,
Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete
Cement concrete in 1:3:6 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Cement concrete in 1:2:4 mix using 20 mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Provision of Nameboard Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
SP SARATHY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_526903.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .