Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹36.4 L+₹10.4 L (39.8%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 4 | Not Admitted-Fee/PreQual/Technical R O CHAKKA SHAGAN DISTRICT RAMBAN | RAMBAN | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
17 Aug 2026, 4:00 pmClosed
ER Mohd Iqbal Ganie
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_318147_4
NIT 33 of 2026-27 Dated 27-07-2026
Open Tender
Civil Works
Percentage
60 days
Executive Engineer PWD RnB Division Banihal
Refer to SBD
2 documents required · 2 mandatory
₹800
Executive Engineer PWD RnB Division Banihal
₹72,000
Executive Engineer PWD RnB Division Banihal
27 Aug 2026
27 Jul 2026
18 Aug 2026
28 Jul 2026
17 Aug 2026
28 Jul 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of : G.S. Sheet | 180.11 | sqm | 125.35 | ₹22,576.79 |
| 0.0 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. | 2,724.43 | Kg | 4.3 | ₹11,715.05 |
| 0.0 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 90.52 | cum | 1,740.45 | ₹1,57,545.53 |
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of Soil | 90.89 | cum | 479.3 | ₹43,563.58 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 20.83 | cum | 5,202.9 | ₹1,08,376.41 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 46.2 | cum | 5,733.6 | ₹2,64,892.32 |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 23.9 | cum | 7,788.4 | ₹1,86,142.76 |
| 0.0 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.68 | cum | 9,395.7 | ₹34,576.18 |
| 0.0 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 29.6 | cum | 9,821.85 | ₹2,90,726.76 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 5,718.66 | kgs | 123.2 | ₹7,04,538.91 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1046516.xls
BOQ • 0.35 MB
Extensionaugust.pdf
PDF • 0.51 MB
Corrigendumitr.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .