Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance HOUSE NO 417 WARD NO 01 NEAR BHARATDWAJ PALACE KOTAR KALA DISTT SIDHI M P | SIDHI | MADHYA PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical 00 00 NAPASAR ROAD NENO KA BASS BIKANER RAJASTHAN BIKANER RAJASTHAN 334022 UDYAM RJ 08 0001676 | BIKANER | RAJASTHAN | 334022 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹37.6 L
Closing Date
19 Feb 2021, 3:00 pmClosed
EXECUTIVE ENGINEER CD-VIII
OFFICE OF THE EXECUTIVE ENGINEER CD-VIII IFC DEPTT. SECTOR 15 ROHINI DELHI
Desilting of drain by deploying pocklain machine and labour for removal of floating material and polythene bags etc. complete from RD 4150 m to RD 7850 m of KSN drain from April 2021 to November 2021
2021_IFC_200016_1
EE/CD-VIII/NIT/2020-21/23
Open Tender
Civil Works
Item Rate
210 days
DELHI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
25 Feb 2021
12 Feb 2021
19 Feb 2021
12 Feb 2021
19 Feb 2021
12 Feb 2021
Amount
Removal of all obstructions from the bed of the drain including jungle patera, wild growth including garbage and desilting whereever required from the bed and side slope/bank of the drain by deploying pocklain machine & disposal of same with in land boundary as per direction of Engineer incharge, as and when required.
Carriage of Silt By Mechanical Transport including loading, unloading and stacking lead upto 3 km for all lifts, complete as per directions of Engineer-in-charge.
Disposal of silt similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to left bank of Mungeshpur drain for lead upto 13 km for all lifts, complete as per directions of Engineer-in-Charge.
Disposal of Floating material or waste material by mechanical transport including loading, unloading, transporting to approved Remky plant, Bawana for lead upto 18 km for all lifts, complete as per directions of Engineer-in-charge.
Maintenance of KSN drain for the period of 7 months by removing all type of rubbish, rank vegetation, garbage, polythene bags, patera, hyacinth etc. complete cleaning along with other floating material from the bed of drain above water level, cleaning of side slopes and top of the both banks by deploying mechanical means(hydraulic excavator 3D)/ manual means it should be ensured cleaning of drain during full month in or under water as well as in foul condition including disposal of above removed material within a lead 50m lead from the periphery of drain area cleared. 1st Month
2nd Month
3rd Month
4th Month
5th Month
6th Month
7th Month
ASHOK BUILDERS
Pardeep Kumar Aggarwal
Nish Earth Movers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .