| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAccepted-AOC N A | L1 | Accepted-AOC allotted | |
| 2 | L2₹32.6 L+₹2.0 L (6.56%)Rejected-Finance C 21 SUSHANT LOK 3 SECTOR 57 122001 | GURUGRAM | HARYANA | 122001 | L2 | Rejected-Finance Rejected being on higher side |
Tender Value
₹28.4 L
EMD Value
₹57,000
Closing Date
13 Feb 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer Provincial Division No.2 PWD BR Br., Gurugram
Restoration of road cuts made by public Health Engineering Department for laying of sewer line on Mauzabad to Jatauli via Jatshapur km 7.50 to 7.82 in Gurugram District (Road ID 28.40 lacs
2020_HRY_117001_1
PWD/PD2GGN/PHMaujabad
Open Tender
Civil Works
Item Wise
60 days
Gurugram
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Engineer Provincial Division No 2 PWD BR
₹57,000
Yes
16 Jul 2021
4 Feb 2020
17 Feb 2020
4 Feb 2020
13 Feb 2020
4 Feb 2020
Amount
Construction of embankment, sub grade and shoulders of new road with soil of minimum CBR (4 days soaked) of 8% obtained from borrow pit with all lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The finished road surface will be as per X-section approved by employer with respect to GTS. At no place top of sub grade of raised road will be less than 0.90 m above adjoining NSL. NSL for a block of 100m will be worked as mean of 6 levels taken on 20 m center to center length of road. These six levels are at three location on both side one at edge ROW. Other at 5 m and 10 m away from ROW. In case the quantity of earth work calculated with NSL and finished level found to be less than 2320 cum. Then actual quantity (less than 2320 cum) will be paid. In case quantity worked out is more than 2320 cum, then only 2320 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached at section 9 of DNIT.
Providing and laying 100 mm thick granular sub base consisting of filter layer confirming to Table 400.1 Grading - VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operation manufacturing shall be approved by engineer.
Providing and laying 100 mm thick granular sub base consisting of drainage layer confirming to Table 400.1 Grading –III of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operation manufacturing shall be approved by engineer.
Providing & laying 150 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S. )Note: - 1.Only crushed stone metal material should be used. No local earth/natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying 100 mm thick spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.406. (N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations manufacturing shall be approved by engineer.
Providing and applying primer coat with bitumen emulsion (S.S grade-I) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.502. (N.S.)
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing & Laying 50 mm thick compacted Dense Graded Bituminous Macadam (DBM) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate rollers to achieve the desired compaction as per clause No. 505 MoRT&H specification for road and bridge works (5th edition) 2013 using minimum 4.50% to bitumen grade VG-30 as binder content by weight of total mix, complete in all respect including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification (5th edition) 2013 in mandatory. If bitumen required more than 4.50% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.(NS) Note:-Before carrying out bituminous work, coating & stripping of bitumen aggregate mis is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mis is less than 95% anti-stripping agent will be used by contractor. The anti-stripping agenct should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of result be maintained and same shall be submitted along with bill by the contractor. Note: - 1. Where there is DBM on existing black top , cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing & Laying 30 mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheele, vibratory and with pneumatic tyred roller of 12 to 15 tonne weight with a typre pressure of a least 0.56 MPA and tandem roller to achieve the desired compaction as per clause no. 507 MORT&H specification (54th Revision) 2013 for road and bridge works (5th Revision)2013 using minimum 5.4% to bitumen grade VG-30 as binder content by weight of total mix, complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note:-Before carrying out BC, coating & stripping of bitumen aggregate mis is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mis is less than 95% anti-stripping agent will be used by contractor. The anti-stripping agenct should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of result be maintained and same shall be submitted along with bill by the contractor.
Providing & fixing public information board consisting of 75 mm GI pipe of size 2.45 m X 1.15 m with 900 mm X 900 mm GI sheet 16 gauge connected/welded with 5 mm th. Steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60x60x75 cm cement concrete 1:2:4 block complete in all respect
Providing and installing shoulder mounted direction signage of various sizes using non-metallic micro prismatic retro reffective sheet conforimng to IRC-67-2012 type IV, HIP specfication fixed on 3 mm thick Aluminium composite panels as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides supported on single or two nos, Mild steel pipe post 80 mm NB medium class 4 mm thick embeded in M-20 grade concrete foundation of size (450 mm X 450 mm X 600 mm) complete as per drawings Technical specfication and as directed by Engineer-in-Charge. More than 0.9 Sqm board (To be supported on Two Nos:M.S Pipe posted) Size 1200 X 900
Providing & Marking center line / side line 2.5 mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/15 cm wide complete in all respect such as furnishing all labour, material, tolls equipment including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause no. 803 of MORT&H specification for road and bridge work. (5th revision) of 2013/latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufactureer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apromark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriateASTM/BS method, The contractor shall furnish to the Engineer-in-Charge a copy of certified test report from manufacturer of the thermoplastic material meet all requirement of the specification. The reflectorizing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2 shall be meticulously followed. The minimum thickness specified is exclusive o surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3) Note:- Before start of work the contractor shall give brand batch no., manufacruing date of teh material to be used and get approved the same from Engineer-in-charge before use.
R K JAIN INFRA PROJECTS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .