Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹4.3 L+₹12,465.90 (3.01%)Accepted-Finance | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
Refer Docs
EMD Value
₹4,900
Closing Date
25 Jan 2023, 6:55 pmClosed
Chief Engieer TTPS
Office of the Chief Engieer TTPS TTN 4
Improvement works to the drains around sea water filtration plant, ESP 4 and 5 5control room building and drains in Transformer yard to Power House
2023_EB_280859_1
SE Civil TTPS Spec.No.212 2022 2023
Open Tender
Civil Works - Others
Item Rate
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,900
Yes
30 Jan 2023
10 Jan 2023
27 Jan 2023
10 Jan 2023
25 Jan 2023
10 Jan 2023
Amount
Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and initial lift of 2m including cost of all materials, labours, lead, lift, etc. complete.
Providing PCC 1:3:6 concrete using OP cement with 12mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Brick work in CM 1:5 using class II bricks including cost of all materials, labours, lead, lift, curing, etc. complete
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete.
Providing RCC 1:1.5:3 using OP cement with 12 to 20mm machine crushed HBG metal for precast slab including cost of all materials, labours, lead, lift, curing & shutter charges etc. complete - excluding cost of reinforcement.- excluding cost of reinforcement and form work.
Pointing with C.M 1:6, flush pointing for R.R. masonry including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with C.M 1:3, 12 mm thick providing temporary barricade for diverting flow of water including cost of all materials, labours, lead, lift, curing, etc. complete.
RAJAM CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .