| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 CrAccepted-AOC GRAM NANEHA ASHA TEHSIL DEVBAND DISTRICT SAHARANPUR MOBILE 9927733433 | ₹15.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹15.2 Cr+₹18.5 L (1.23%)Rejected-Finance | ₹15.2 Cr+₹18.5 L (1.23%) | L2 | Rejected-Finance L2 |
| 3 | L3₹15.2 Cr+₹22.9 L (1.53%)Rejected-Finance | ₹15.2 Cr+₹22.9 L (1.53%) | L3 | Rejected-Finance L3 |
| 4 | L4₹15.6 Cr+₹58.7 L (3.92%)Rejected-Finance HOUSE NO 120P HOUSE NO 120P SECTOR 4 REWARI 123401 | REWARI | HARYANA | 123401 | ₹15.6 Cr+₹58.7 L (3.92%) | L4 | Rejected-Finance L4 |
| 5 | L5₹15.8 Cr+₹81.6 L (5.45%)Rejected-Finance SHANTI HEIGHTS MANGAL PANDEY NAGAR MEERUT UP | MEERUT | MEERUT | UTTAR PRADESH | ₹15.8 Cr+₹81.6 L (5.45%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Dev Yash Projects and Infrastructure Pvt. Ltd. L3 | amit kumar contractor L1 | M/S SHANTI ASSOCIATES L5 | raghuvanshi construction L6 | M/S CHAUDHARY ASSOCIATES L7 | M/S ARYA CONSTRUCTION CO. L9 | J S S Infratech L10 | KRISHNA CONSTELLATION PRIVATE LIMITED L8 | Sarvodya Infracon Pvt. Ltd. L4 | KRISHNA CIVICONS (INDIA) PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.But Excluding G.S.T. | 57,000 | Cum | 71 ₹40,47,000 | 70 ₹39,90,000 | 110 ₹62,70,000 | 50 ₹28,50,000 | 40 ₹22,80,000 Lowest | 110 ₹62,70,000 | 100 ₹57,00,000 | 100 ₹57,00,000 | 130 ₹74,10,000 | 120 ₹68,40,000 |
| 2.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 10,900 | Cum | 48 ₹5,23,200 | 20 ₹2,18,000 Lowest | 110 ₹11,99,000 | 60 ₹6,54,000 | 30 ₹3,27,000 | 60 ₹6,54,000 | 50 ₹5,45,000 | 40 ₹4,36,000 | 50 ₹5,45,000 | 42 ₹4,57,800 |
| 3.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. | 10,650 | Cum | 2,392 ₹2,54,74,800 | 2,000 ₹2,13,00,000 | 1,600 ₹1,70,40,000 Lowest | 2,600 ₹2,76,90,000 | 2,500 ₹2,66,25,000 | 2,400 ₹2,55,60,000 | 2,600 ₹2,76,90,000 | 2,400 ₹2,55,60,000 | 2,400 ₹2,55,60,000 | 2,100 ₹2,23,65,000 |
| 4.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 6,580 | Cum | 2,511 ₹1,65,22,380 | 2,500 ₹1,64,50,000 | 1,750 ₹1,15,15,000 Lowest | 2,950 ₹1,94,11,000 | 2,600 ₹1,71,08,000 | 2,800 ₹1,84,24,000 | 2,800 ₹1,84,24,000 | 2,800 ₹1,84,24,000 | 2,600 ₹1,71,08,000 | 2,480 ₹1,63,18,400 |
| 5.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 65,800 | Sqm | 19 ₹12,50,200 | 10 ₹6,58,000 Lowest | 18 ₹11,84,400 | 31 ₹20,39,800 | 18 ₹11,84,400 | 30 ₹19,74,000 | 16 ₹10,52,800 | 15 ₹9,87,000 | 19 ₹12,50,200 | 16 ₹10,52,800 |
| 6.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 6,580 | Cum | 7,211 ₹4,74,48,380 | 7,900 ₹5,19,82,000 | 8,200 ₹5,39,56,000 | 7,450 ₹4,90,21,000 | 7,300 ₹4,80,34,000 | 7,700 ₹5,06,66,000 | 7,800 ₹5,13,24,000 | 7,800 ₹5,13,24,000 | 7,000 ₹4,60,60,000 | 6,500 ₹4,27,70,000 Lowest |
| 7.00 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 65,800 | Sqm | 11 ₹7,23,800 | 10 ₹6,58,000 | 20 ₹13,16,000 | 11 ₹7,23,800 | 9 ₹5,92,200 Lowest | 11 ₹7,23,800 | 11 ₹7,23,800 | 10 ₹6,58,000 | 12 ₹7,89,600 | 12 ₹7,89,600 |
| 8.00 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects | 2,023 | Cum | 8,111 ₹1,64,08,553 | 9,100 ₹1,84,09,300 | 9,200 ₹1,86,11,600 | 8,650 ₹1,74,98,950 | 9,000 ₹1,82,07,000 | 8,600 ₹1,73,97,800 | 9,000 ₹1,82,07,000 | 9,000 ₹1,82,07,000 | 7,800 ₹1,57,79,400 Lowest | 8,300 ₹1,67,90,900 |
| 9.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 422 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 4,368 | Cum | 5,177 ₹2,26,13,136 Lowest | 5,200 ₹2,27,13,600 | 5,900 ₹2,57,71,200 | 5,600 ₹2,44,60,800 | 6,800 ₹2,97,02,400 | 6,200 ₹2,70,81,600 | 5,600 ₹2,44,60,800 | 5,800 ₹2,53,34,400 | 5,500 ₹2,40,24,000 | 5,500 ₹2,40,24,000 |
| 10.00 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) (S.I.No 251) | 4,800 | Cum | 54 ₹2,59,200 | 30 ₹1,44,000 Lowest | 110 ₹5,28,000 | 50 ₹2,40,000 | 55 ₹2,64,000 | 90 ₹4,32,000 | 60 ₹2,88,000 | 80 ₹3,84,000 | 50 ₹2,40,000 | 60 ₹2,88,000 |
Tender Value
₹21.9 Cr
EMD Value
₹43.8 L
Closing Date
18 Sept 2024, 2:00 pmClosed
superintending engineer saharanpur circle pwd saha
superintending engineer saharanpur circle pwd saharanpur
Widening and Strengthening work of Behra Sadat To Meerut Poudi Road.
2024_CEMRT_954851_1
6719/24MS-S/2024 Date 02-09-2024
Open Tender
Civil Works
Item Rate
450 days
muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹43.8 L
Yes
10 Jul 2026
11 Sept 2024
18 Sept 2024
11 Sept 2024
18 Sept 2024
11 Sept 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.But Excluding G.S.T. | 57,000 | Cum | - | - |
| - | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 10,900 | Cum | - | - |
| - | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. | 10,650 | Cum | - | - |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 6,580 | Cum | - | - |
| - | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 65,800 | Sqm | - | - |
| - | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 6,580 | Cum | - | - |
| - | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 65,800 | Sqm | - | - |
| - | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects | 2,023 | Cum | - | - |
| - | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 422 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 4,368 | Cum | - | - |
| - | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) (S.I.No 251) | 4,800 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1658071.xls
BOQ Document • 0.29 MB
152018297.pdf
Tender Document • 1.43 MB
152018299.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .