Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RANDHEER ENTERPRISES L8 | Aakar Infra Engineers Pvt ltd L16 | M/s Suman Engineering Works L12 | VIJAYSIDDHIVINAYAK ENTERPRISES L4 | M/s AWADHESH KUMAR L10 | singh construction mopka L14 | M/S R K BROTHERS L1 | BAGHEL INFRASTRUCTURES Pvt Ltd L13 | M/S KESHARI ENTERPRISES L9 | M/S PRABHUNATH SINGH L3 | SINGH ENTERPRISES L2 | Kedar Construction and Supplier L7 | A.K. CONSTRUCTION L6 | G.R.CONSTRUCTION L5 | n chaurasia associates L15 | RAJENDRA SINGH L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10.00 | Part-A:Schd.Items DSR-2018 Baliyari dyke | 1 | Nos | 35.11 ₹77.4 L | 1.11 ₹1.2 Cr | 11 ₹1.1 Cr | 30.2 ₹83.3 L | 21.9 ₹93.2 L | 18 ₹97.8 L | 39.1 ₹72.6 L | 18 ₹97.8 L | 28 ₹85.9 L | 45.51 ₹65.0 L | 33.3 ₹79.6 L | 37.03 ₹75.1 L | 26.2 ₹88.0 L | 26.77 ₹87.3 L | 5.55 ₹1.1 Cr | 17.52 ₹98.4 L |
| 20.00 | Part-B: Non-Schd.Items,Baliyari ash dyke | 1 | Nos | 3.9 ₹84.0 L | 2.22 ₹85.5 L | 11 ₹77.8 L | 30.2 ₹61.0 L | 1.9 ₹89.1 L | 0 ₹87.5 L | 51 ₹42.9 L | 1 ₹86.6 L | 5 ₹91.8 L | 11.51 ₹77.4 L | 33.3 ₹58.3 L | 0 ₹87.5 L | 26.2 ₹64.5 L | 26.77 ₹64.0 L | 5.55 ₹82.6 L | 3.52 ₹84.4 L |
| 30.00 | Part-C: Amount linked to safety complian | 1 | Nos | 1.11 ₹4.0 L | 2.22 ₹4.0 L | 11 ₹3.6 L | 30.2 ₹2.8 L | 0.99 ₹4.1 L | 9.88 ₹3.7 L | 25 ₹3.1 L | 1 ₹4.0 L | 30 ₹2.9 L | 15.51 ₹3.4 L | 3.33 ₹4.2 L | 50 ₹2.0 L | 0 ₹4.1 L | 0 ₹4.1 L | 5.55 ₹3.9 L | 3.52 ₹3.9 L |
Tender Value
₹1.8 Cr
Closing Date
8 Sept 2021, 10:00 amClosed
DGM(CS)
SSC NR Vindhyachal P.O. Vindhyanagar 486885
JC for civil maintenance of V-4A, V-4B ash dyke,OFL,Toe drain pumphouses and ash pipeline corridor of Baliyari ash dyke area for the year 2021-23.
2021_NTPC_53308_1
NTPC/SSC - VSR/9900224346
Open Tender
Civil Works
730 days
SSC NR Vindhyachal
As per tender documents
5 documents required · 5 mandatory
₹2,655
Exempted
7 Oct 2021
28 Aug 2021
10 Sept 2021
28 Aug 2021
8 Sept 2021
28 Aug 2021
28 Aug 2021 - 4 Sept 2021
Amount
Part-A:Schd.Items DSR-2018 Baliyari dyke
Part-B: Non-Schd.Items,Baliyari ash dyke
Part-C: Amount linked to safety complian
SINGH ENTERPRISES
M/S PRABHUNATH SINGH
VIJAYSIDDHIVINAYAK ENTERPRISES
G.R.CONSTRUCTION
A.K. CONSTRUCTION
Kedar Construction and Supplier
RANDHEER ENTERPRISES
M/S KESHARI ENTERPRISES
M/s AWADHESH KUMAR
RAJENDRA SINGH
M/s Suman Engineering Works
BAGHEL INFRASTRUCTURES Pvt Ltd
singh construction mopka
n chaurasia associates
Aakar Infra Engineers Pvt ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid