CONSTRUCTION OF CEMENT CONCRETE ROAD FROM THE HOUSE OF SHYAM NISHAD TO THE HOUSE OF KARIM ALI IN VILLAGE RAVELIDIH, AT WARD NO 1 AND WARD NO 9 IN VILLAGE KODIA IN BLOCK- DURG AND IN VILLAGE MOHANDI, OTEBAND, MALPURIKALA, GODHI, KAPSADA IN BLOCK- DHAMDHA IN VIDHANSABHA AREA AHIWARA DISTT-DURG.
198036
Sr no/b6/V S AREA AHIWARA/67-1/26-27/MANDI-273/2801/raipur/11.08.2026
RESTRICTED TENDER
WORKS
PERCENTAGE
9 days
CGSMB
Required Past Technical Experience: AS DETAILED IN NIT CONDITION
Required Financial Turnover (in INR): AS PER NIT/NIT CONDI
Required Bid Capacity (in INR): AS PER NIT/NIT CONDI
21 documents required · 21 mandatory
Chhattisgarh State Mandi Board (CGSMB)
WORKS
MR BUYER ADMIN(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B C
CGSMB
TENDER SECTION
RAIPUR
120
09
No
0
198036
2 Sep, 2026 5:00:00 PM IST
11 Sep, 2026 11:00:00 AM IST
20 Aug, 2026 6:00:00 PM IST
Sr no/b6/V S AREA AHIWARA/67-1/26-27/MANDI-273/2801/raipur/11.08.2026
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM THE HOUSE OF SHYAM NISHAD TO THE HOUSE OF KARIM ALI IN VILLAGE RAVELIDIH, AT WARD NO 1 AND WARD NO 9 IN VILLAGE KODIA IN BLOCK- DURG AND IN VILLAGE MOHANDI, OTEBAND, MALPURIKALA, GODHI, KAPSADA IN BLOCK- DHAMDHA IN VIDHANSABHA AREA AHIWARA DISTT-DURG.
93000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
12381000.00
2
10 Sep, 2026 5:00:00 PM IST
12381000
AS PER NIT/NIT CONDI
AS PER NIT/NIT CONDI
AS DETAILED IN NIT CONDITION
5000.00 INR
13d 0h 13m
21 documents required · 19 mandatory · 2 optional
₹5,000
₹93,000
20 Aug 2026
20 Aug 2026
11 Sept 2026
20 Aug 2026
10 Sept 2026
OFFICE OF THE C.G. STATE AGRICULTURE MARKETING BOARD, DURG
DEVELOPMENT :- AT BLOCK- DHAMDHA ,DURG DISTT. -DURG (C.G.)
DETAILED ABSTRACT
SOR:-CGPWD ROAD WORKS , AND BRIDGE WORKS , INFORCE FROM 01.01.2025 AND AMMENDED UPTO DATE
Sr. SIZE VILLAGE BLOCK VIDHANSABHA DISTT. NOS SIZE UNIT AMOUNT IN LACS PRASTAO
1 CEMENT CONCRETE ROAD WORKS REWALIDEHI DHAMDHA AHIWARA DURG 1 880 SQM 9.96
2 CEMENT CONCRETE ROAD WORKS KACHANDUR DHAMDHA AHIWARA DURG 1 1760 SQM 19.91
3 CEMENT CONCRETE ROAD WORKS KODIYA DHAMDHA AHIWARA DURG 1 880 SQM 9.96
4 CEMENT CONCRETE ROAD WORKS KODIYA DHAMDHA AHIWARA DURG 1 880 SQM 9.96
5 CEMENT CONCRETE ROAD WORKS MEHANDI DHAMDHA AHIWARA DURG 1 1800 SQM 20.37
6 CEMENT CONCRETE ROAD WORKS OTEBANDH DHAMDHA AHIWARA DURG 1 880 SQM 9.96
7 CEMENT CONCRETE ROAD WORKS MALPURIKALA DHAMDHA AHIWARA DURG 1 2200 SQM 24.89
8 CEMENT CONCRETE ROAD WORKS GODHI DHAMDHA AHIWARA DURG 1 880 SQM 9.96
9 CEMENT CONCRETE ROAD WORKS KAPASDA DHAMDHA AHIWARA DURG 1 880 SQM 9.96
10 CEMENT CONCRETE ROAD WORKS MEHANDI DHAMDHA AHIWARA DURG 1 2200 SQM 24.89
11 CEMENT CONCRETE ROAD WORKS LIMTARA DHAMDHA AHIWARA DURG 1 2200 SQM 24.89
12 CEMENT CONCRETE ROAD WORKS LIMTARA DHAMDHA AHIWARA DURG 1 1760 SQM 19.91
13 CEMENT CONCRETE ROAD WORKS SURJIDEHI (MURRA) DHAMDHA AHIWARA DURG 1 880 SQM 9.96
14 CEMENT CONCRETE ROAD WORKS AHERI DHAMDHA AHIWARA DURG 1 1760 SQM 19.91
15 CEMENT CONCRETE ROAD WORKS SEMRIYA (BAGDUMMAR) DHAMDHA AHIWARA DURG 1 880 SQM 9.96
16 CEMENT CONCRETE ROAD WORKS SEMRIYA (GIRHOLLA) DHAMDHA AHIWARA DURG 1 880 SQM 9.96
17 CEMENT CONCRETE ROAD WORKS AHERI DHAMDHA AHIWARA DURG 1 2200 SQM 24.89
18 ESTIMATE FOR CONSTRUCTION OF 6.00 METER ONE SPAN SLAB CULVERT WORKS BIREBHATT (SAMODA TALAB) DHAMDHA AHIWARA DURG 1 6 X 6.80 SQM 30.98
GRAND TOTAL Rs:- 300.23
Sub-Engineer C.G. State Agricultural Marketing Board, Durg (C.G.) Asstt-Engineer C.G. State Agricultural Marketing Board, Durg (C.G.) Executive Engineer C.G. State Agricultural Marketing Board, Durg (C.G.)
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- REWALIDEHI BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
SHYAM NISHAD TO KARIM ALI 1 220 4 0.10 88.00
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
SHYAM NISHAD TO KARIM ALI 1 220 4 0.10 88.00
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
SHYAM NISHAD TO KARIM ALI 1 220 4 0.10 88.00
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
SHYAM NISHAD TO KARIM ALI 1 220 4 0.20 176.0
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
SHYAM NISHAD TO KARIM ALI 2 220 0.30 0.20 26.4
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- KACHANDUR BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 1645794
Add contengencies charges 3% AMOUNT 49374
Add G.S.T charges 18% AMOUNT 296243
GRAND TOTAL Rs. 1991410
SAY RS :- 19.91
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- KODIYA BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- KODIYA BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- MEHANDI BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 1683198
Add contengencies charges 3% AMOUNT 50496
Add G.S.T charges 18% AMOUNT 302976
GRAND TOTAL Rs. 2036670
SAY RS :- 20.37
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- OTEBANDH BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- MALPURIKALA BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 2057242
Add contengencies charges 3% AMOUNT 61717
Add G.S.T charges 18% AMOUNT 370304
GRAND TOTAL Rs. 2489263
SAY RS :- 24.89
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- GODHI BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- KAPASDA BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- MEHANDI BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 2057242
Add contengencies charges 3% AMOUNT 61717
Add G.S.T charges 18% AMOUNT 370304
GRAND TOTAL Rs. 2489263
SAY RS :- 24.89
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- LIMTARA BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 2057242
Add contengencies charges 3% AMOUNT 61717
Add G.S.T charges 18% AMOUNT 370304
GRAND TOTAL Rs. 2489263
SAY RS :- 24.89
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- LIMTARA BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 1645794
Add contengencies charges 3% AMOUNT 49374
Add G.S.T charges 18% AMOUNT 296243
GRAND TOTAL Rs. 1991410
SAY RS :- 19.91
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- SURJIDEHI (MURRA) BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- AHERI BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
GAURI GAURA TO C.C ROAD 1 440 4 0.10 176.00
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
GAURI GAURA TO C.C ROAD 1 440 4 0.10 176.00
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
GAURI GAURA TO C.C ROAD 1 440 4 0.10 176.00
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
GAURI GAURA TO C.C ROAD 1 440 4 0.20 352.0
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
GAURI GAURA TO C.C ROAD 2 440 0.30 0.20 52.8
TOTAL Rs. 1645794
Add contengencies charges 3% AMOUNT 49374
Add G.S.T charges 18% AMOUNT 296243
GRAND TOTAL Rs. 1991410
SAY RS :- 19.91
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- SEMRIYA (BAGDUMMAR) BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- SEMRIYA (GIRHOLA) BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 822897
Add contengencies charges 3% AMOUNT 24687
Add G.S.T charges 18% AMOUNT 148121
GRAND TOTAL Rs. 995705
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD durg
CEMENT CONCRETE road WORKS AT :- AHERI BLOCK:- DHAMDHA , DIST.- DURG ( CHHATTISGARH )
SOR:-CGPWD ROAD WORK INFORCED FROM 01.01.2025 AND AMMENDED UP TO DATE
S.NO. DESCRIPTION OF ITEM L W H QTY UNIT RATE AMOUNT
1 ITEM NO. -3.1 PAGE NO.-11 @ 237.00 PER CUM Excavation in Soil (by Manual Means.) Excavation for roadway in soil using including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto1000 meters as per relevant clauses of section 300.
2 ITEM NO. - 3.12 PAGE NO.-12 @ 238 PER CUM Construction of embankment with Material Obtained from Borrow Pits/Borrow Area (Construction of embankment with approved material/selected soil having C.B.R.>5 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
3 ITEM NO. - 3.13 PAGE NO.-12 @ 268 PER CUM Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.>8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
4 ITEM NO. - 9.8 / (ii) PAGE NO.- 61 @ 4255.00 PER CUM Plain cement concrete complete as per drawing and Technical Specifications
5 ITEM NO. - 4.44 /4.11. (A) PAGE NO.-19 @ 327.00 PER CUM Construction of Shoulders (Construction of shoulders as per clause 408 with selected soil from borrow pits / borrow areas having CBR not less than 12 and shall have L.L. and P.I. not more than 25% and 6% respectively, inclusive of all leads and lifts, including clearing and scrapping of existing surface, providing required cross fall, compacting. watering rolling and royalty charges etc. complete.
A With vibratory roller
TOTAL Rs. 2057242
Add contengencies charges 3% AMOUNT 61717
Add G.S.T charges 18% AMOUNT 370304
GRAND TOTAL Rs. 2489263
SAY RS :- 24.89
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
C.G. STATE AGRICULTURE MARKETING BOARD DURG
ESTIMATE FOR CONSTRUCTION OF 6.00 METER ONE SPAN SLAB CULVERT ON VILLAGE :- BIREBHATT (SAMODA TALAB) , BLOCK- DHAMDHA DIST:- DURG
DETAIL ESTIMATE OF SLAB CULVERT
ESTIMATE REF. TAKEN By PWD SOR Bridge Work In Force From 01.01.2025
S. NO. S.O.R. Item No. Items Dimensions Quantity Unit RATE AMOUNT
1 2.1 I (i) Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material including dewatering etc. complete I)Ordinary soil - Upto 3m
RETAING WALL ( ABUTMENT) 2 2 3.00 2.50 1.60 48.00
DIVERSION ROAD 1 1 12.00 5.00 0.40 24.00
Total 133.60 Cum 161 21510
2 2.1 Add extra 20% in the rates of above items for dewatering (Assessment of dewatering shall be made as per site condition ) Same As Above 133.60 Cum 29.20 3901
3 3.6 (A) (a) i Providing and laying Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications section 1500, 1700 and 2200 (Newly laid concrete shall be covered by gunny bags).- A)Height upto 5m a)Using concrete Mixer (i)P.C.C. Grade M-15
RETAING WALL ( ABUTMENT) 2 2 3.00 1.80 0.300 6.48
4 3.6 (A) (a) (ii) Providing and laying Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications section 1500, 1700 and 2200 (Newly laid concrete shall be covered by gunny bags).- A)Height upto 5m a)Using concrete Mixer (ii)P.C.C. Grade M-20
RETAING WALL ( ABUTMENT) 2 2 3.00 1.35 1.300 21.06
RETAING WALL ( ABUTMENT) 2 2 3.00 0.70 4.000 33.60
5 3.6 (A) (a) (iii) Providing and laying Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications section 1500, 1700 and 2200 (Newly laid concrete shall be covered by gunny bags).- A)Height upto 5m a)Using concrete Mixer P.C.C. Grade M-25
6 3.7 Supplying, fitting and placing HSD (High Strength Deformed Steel) bars reinforcement in sub-structure complete as per drawing and technical specifications section 1600 and 2200. As per RCC schedule 4704.90 KG 189.163 889993
7 4.4 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications as per relevant clause of section 2700.
Total 3.06 Cum 12684 38813
8 4.18 (B) Filler joint
Providing & fixing 20 mm thick compressible fiber board (12 m long x 25 cm deep ) in expansion joint complete as per drawing & Technical Specification. 1 2 5.00 0.48 4.80 Sqm 1212 5818
9 3.18 Providing and fixing in position tar paper bearing for slab as per approved drawings and specification. 1 2 5.00 0.75 7.50 Sqm 66 495
10 2.1 (VI) Back Filling in Marshy Foundation Pits as per specifications cum 299 2.2 Filling Annular Space Around Footing in Rock (Lean cement
back filling behind abutment 133.60
Total 133.60 Cum 420 56112
11 3.11 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specifications 710.1.4 of I.R.C. 78 and 2200.
RETAING WALL ( ABUTMENT) 2 2 5.00 0.45 1.900 17.10
RETAING WALL ( ABUTMENT) 2 2 5.00 0.45 1.800 16.20
Total 49.95 Cum 1968 98302
12 3.9 Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/return wall with 100 mm dia. AC pipe, extending through the full width of the structure with slope of 1 V: 20 H towards drawing face. Complete as per drawing and Technical specifications section 2706 and 2200.
ABUTMENT 2 1 1.900 3.80
ABUTMENT 2 1 1.800 3.60
RETAING WALL ( ABUTMENT) 2 2 1.900 7.60
RETAING WALL ( ABUTMENT) 2 2 1.800 7.20
Total 22.20 METER 438 9724
13 3.1 Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification 710.1.4 of I.R.C. 78 and 2200. (i) Granular material
DIVERSION IN ROAD 1 12.00 5.00 0.30 18.00
FILLING 2.50 0.30
FILLING 2.50 0.30
14 5.1 Providing and laying boulders apron on river bed forprotection against scour with stone boulders weighing notless than 40 kg each complete as per drawing and Technical specification as per relevant clauses of section 2503
UP STREAM AND DOWN STREAM 1 4 3.00 0.40 1.00 4.80
Total 4.80 Cum 2162 10378
15 5.4 ( A) Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications as per section 2504.
UP STREAM AND DOWN STREAM SLOPE 1 4 3.00 4.00 0.22 10.56
Total 10.56 Cum 2486 26252
Total Rs. 2560596
Add 3% for Contengencies Charges 76818
Add 18% G.S.T 460907
Grand Total Rs. 3098321
Say Rs. In Lacs 30.98
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
4 3.6 (A) (a) (ii) Providing and laying Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications section 1500, 1700 and 2200 (Newly laid concrete shall be covered by gunny bags).- A)Height upto 5m a)Using concrete Mixer (ii)P.C.C. Grade M-20
RETAING WALL ( ABUTMENT) 2 2 3.00 1.35 1.300 21.06
RETAING WALL ( ABUTMENT) 2 2 3.00 0.70 4.000 33.60
Providing and laying Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications section 1500, 1700 and 2200 (Newly laid concrete shall be covered by gunny bags).- A)Height upto 5m a)Using concrete Mixer (iv)P.C.C. Grade M-30
TOTAL QUANTITY 4704.9 KG
Sub Engineer CG State Agriculture Marketing (Mandi) Board, Durg Assistant Engineer CG State Agriculture Marketing (Mandi) Board, Durg Executive Engineer CG State Agriculture Marketing (Mandi) Board, Durg
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.10 MB
865251749479491429_198036_AHIWARA CC.doc
NIT • 0.53 MB
2065982101152500_198036_AHIWARA.xlsx
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].