| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 L+₹1,105.22 (0.40%)Rejected-AOC | ₹2.8 L+₹1,105.22 (0.40%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.8 L+₹1,381.52 (0.50%)Rejected-AOC | ₹2.8 L+₹1,381.52 (0.50%) | L3 | Rejected-AOC L3 |
Tender Value
₹2.8 L
EMD Value
₹27,631
Closing Date
25 May 2026, 3:00 pmClosed
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Work of footpath, wall and wall painting from to near shiv mandir park for nand vatika dehradun road at ward no.29
2026_NNSAH_1152103_1
6253 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹27,631
1 Aug 2026
22 May 2026
25 May 2026
22 May 2026
25 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old damaged 80mm thick cc interloking tiles road work including labour T&P etc all complete | 61.5 | sqm | 13 | ₹799.5 |
| 2 | Earthwork in cutting or in embankment in ordinary soil in all complete as per S.I. No. 251-a | 7.18 | cum | 255 | ₹1,830.9 |
| 3 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work | 6 | m3 | 2,985 | ₹17,910 |
| 4 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. | 7.73 | m3 | 4,520 | ₹34,939.6 |
| 5 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 82.57 | m2 | 160 | ₹13,211.2 |
| 6 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. | 6.39 | m3 | 5,750 | ₹36,742.5 |
| 7 | Chequerd precast cement concrete tiles 22mm thick footpath & courtyard in all complete work | 63 | sqm | 806.83 | ₹50,830.29 |
| 8 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 284(a)) | 0.4 | cum | 7,400 | ₹2,960 |
| 9 | Mild steel work in all work complete (S.I. No. 504) | 0.32 | qtl | 8,529 | ₹2,729.28 |
| 10 | M.S or iron work of small sizes and section such as holding down bolt hold fast in all complete work | 1.57 | qtl | 6,150 | ₹9,655.5 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.74 MB
BOQ_2158215.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .