Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance NOT AVAILABLE | NEW DELHI | DELHI | 110001 | -24.99% | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹25.4 L (12.3%)Admitted-Finance AT KOTHASAHI GP KANTAPADA PO GIRIA BLOCK PS RAJKANIKA DIST KENDRAPARA PIN 754220 | KENDRAPARA | KENDRAPARA | ODISHA | 754220 | -15.77% | ₹2.3 Cr+₹25.4 L (12.3%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹52.4 L (25.3%)Admitted-Finance | -5.99% | ₹2.6 Cr+₹52.4 L (25.3%) | L3 | Admitted-Finance |
| 4 | L4₹2.8 Cr+₹68.9 L (33.3%)Admitted-Finance | +0.00% | ₹2.8 Cr+₹68.9 L (33.3%) | L4 | Admitted-Finance |
| 5 | L4₹2.8 Cr+₹68.9 L (33.3%)Admitted-Finance | +0.00% | ₹2.8 Cr+₹68.9 L (33.3%) | L4 | Admitted-Finance |
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
4 Aug 2026, 5:00 pmClosed
Chief Construction Engineer,R.W Circle,KPD-JJP
O/o CCE,Rural Works Circle,KPD-JJP
Construction of H.L. bridge over Dandimunda Nallah on Irrigation road to Bengamadhapur road
2026_CERWI_136783_1
Tender Online RCK-13/26
National Competitive Bid
Civil Works - Bridges
Percentage
365 days
Jajpur
2 documents required · 2 mandatory
₹10,000
₹2.8 L
Yes
17 Sept 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
4 Aug 2026
22 Jul 2026
22 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works
(5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer in Charge. | 282.88 | cum | 3,044.53 | ₹8,61,236.65 |
| 2 | Supplying & filling good clean river sand inside the well/approach road including watering to complete saturation & ramming complete with all leads & lifts including cost. Conveyance royality & taxes of all materials & cost of all labour & T&P required for the work complete ( measurement will be taken for compacted section as per direction of Engineer in Charge | 662.04 | cum | 666.81 | ₹4,41,454.89 |
| 3 | Cement concrete (1:3:6) in foundation & plinth with 4cm. crusher broken granite metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator ,providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer in Charge | 6,212.99 | cum | 49.42 | ₹3,07,045.97 |
| 4 | Plain cement concrete M-15 grade In Foundation with 12mm size crusher broken hard granite broken metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation &
direction of the Engineer in Charge | 5,565.98 | cum | 256.03 | ₹14,25,057.86 |
| 5 | Plain cement concrete M-15 grade In Sub-Structure with 12mm size crusher broken hard granite broken metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation &
direction of the Engineer in Charge | 5,691.7 | cum | 272.41 | ₹15,50,476 |
| 6 | Reinforced Cement Concrete M 30 Grade using 20mm down graded chips of approved quality from approved quarry including hoisting lowering & laying in layers with proper packing & ramming each layer of concrete by means of vibrator providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation &
direction of the Engineer in Charge
Raft | 7,186.36 | cum | 312.66 | ₹22,46,887.32 |
| 7 | Abutment & Pier shaft | 9,149.99 | cum | 166.5 | ₹15,23,473.34 |
| 8 | Abutment & Pier cap | 9,754.52 | cum | 8.32 | ₹81,157.61 |
| 9 | Dirt wall | 13,018.92 | cum | 2.81 | ₹36,583.17 |
| 10 | Deck slab | 12,442.55 | cum | 236.82 | ₹29,46,644.69 |
stage.html
html • 0.10 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 10.50 MB
Tendernotice_1.pdf
PDF • 3.28 MB
BOQ_602889.xls
BOQ • 0.27 MB
4540.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .