Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC | ₹5.3 Cr Quoted ₹5.5 Cr | L1 | Accepted-AOC Lowest Tender |
| 2 | L2₹5.6 Cr+₹13.1 L (2.38%)Rejected-Finance | ₹5.6 Cr+₹13.1 L (2.38%) | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹5.8 Cr+₹26.3 L (4.76%)Rejected-Finance CONTRACTOR VILLUPURAM | VILLUPURAM | TAMIL NADU | 604001 | ₹5.8 Cr+₹26.3 L (4.76%) | L3 | Rejected-Finance Other than Lowest |
Tender Value
₹5.3 Cr
EMD Value
₹2.7 L
Closing Date
10 Jul 2020, 3:00 pmClosed
The superintending Engineer, Highways C and M,
O/o the Superintending Engineer. Highways CandM, Tvs Tollgate, Trichy 20
PACKAGE 79 Widening and improvements, Junction Improvements, Drain, Bus Lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur H, CandM Subdivision
2020_HWAY_167376_2
TN.NO.11 2020-21
Open Tender
Civil Works - Roads
Percentage
240 days
THANJAVUR
As per PQ Document
6 documents required · 6 mandatory
₹0
₹2.7 L
Trichy
11 Nov 2020
8 Jun 2020
11 Jul 2020
8 Jun 2020
10 Jul 2020
19 Jun 2020
15 Jun 2020
eProcurement System Government of Tamil Nadu Created By: VENKATESAN K Created Date/Time: 19-Aug-2020 01:39 PM Tender Title: PACKAGE 79-2020-21 THANJAVUR Tender ID: 2020_HWAY_167376_2
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Trichy Circle
Schedule A for the Work of Widening and improvements, Junction Improvements, Drain, Bus Lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur (H), C&M Subdivision PACKAGE–79, Road A, Widening from Intermediate lane to Multi Lane and Improvements of Enathukanpatti road at km 1/900 - 2/2 including construction of Drain Cum Footpath, & Buslaybyes including upkeeping for a period of 60 months Road B, Widening from Intermediate lane to Multi Lane and Improvements of Enathukanpatti road at km 2/2 - 2/4 including Reconstruction of culverts, Drain Cum Footpath, Bus laybyes & Construction of Retaining wall including upkeeping for a period of 60 months Road C,Widening from Intermediate lane to Multi Lane and Improvements of Enathukanpatti road at km 2/4 - 2/8 including Reconstruction of culverts, Construction of Retaining wall, Bus laybyes & Junction improvements including upkeeping for a period of 60 months Road D, Widening from Single lane to Two lane and Improvements of Mariyammankoil to Sunganthidal road (Via) Kadakadapai - Sitharkadu - kadugaval road at km 0/0 - 0/4 including upkeeping for a period of 60 months
Contract No: TN.No.11/2020-21/02
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 S PRASATH 46908377.346 10.000 57791121.000 Five Crore Seventy Seven Lakh Ninty One Thousand One Hundred and Twenty One
2.00 S VAITHILINGAM 46908377.346 5.000 55164252.000 Five Crore Fifty One Lakh Sixty Four Thousand Two Hundred and Fifty Two
3.00 PR CONSTRUCTIONS 46908377.346 7.500 56477686.000 Five Crore Sixty Four Lakh Seventy Seven Thousand Six Hundred and Eighty Six
Lowest Amount Quoted BY: S VAITHILINGAM(55164252.000)
BOQ Summary Details Tender Title: PACKAGE 79-2020-21 THANJAVUR Tender ID: 2020_HWAY_167376_2
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 S VAITHILINGAM 55164252.000 L1
2 PR CONSTRUCTIONS 56477686.000 L2
3 S PRASATH 57791121.000 L3
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .