Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹6.0 L (4.43%)Admitted-Finance | ₹1.4 Cr+₹6.0 L (4.43%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KJ Constructions L1 | M SAKTHIVEL L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Upgradation of the road from Maruthur AD Colony Road Km 0/0 - 1/0
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers | 1,196.87 | Sqm | - | - |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 268.44 | Cum | - | - |
| 3.00Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 3.01 | Km 0/0 - 1/0 | 44.74 | Cum | - | - |
| 4.00Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | |||||
| 4.01 | Km 0/0 - 1/0 | 187.5 | Cum | - | - |
| 5.00Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | |||||
| 5.01 | Km 0/0 - 1/0 | 223.7 | Cum | - | - |
| 6.00Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method) | |||||
| 6.01 | Km 0/0 - 1/0 | 223.7 | Cum | - | - |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
26 Nov 2019, 3:00 pmClosed
Project Director
DRDA, Collectorate, Ariyalur
Upgradation and Strengthening of roads 4 Nos in Package No TN 30-05 in Andimadam Block of Ariyalur District under State Finance Commission Panchayat Union Grant 2019-20
2019_RDTN_147080_1
A3/5029/2019
Open Tender
Civil Works - Roads
Works
180 days
DRDA
As per tender document
4 documents required · 4 mandatory
₹0
₹1.4 L
14 Jan 2020
16 Nov 2019
26 Nov 2019
16 Nov 2019
26 Nov 2019
16 Nov 2019
Amount
1.Upgradation of the road from Maruthur AD Colony Road Km 0/0 - 1/0 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
1.50 M RCC slab Culvert @ Ch 10m
1.500 M RCC slab Culvert @ Ch 490m
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
1.50 M RCC slab Culvert @ Ch 10m
1.50 M RCC slab Culvert @ Ch 4900m
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50 M RCC slab Culvert @ Ch 10m
1.50 M RCC slab Culvert @ Ch 490m
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)
1.50 M RCC slab Culvert @ Ch 10m
1.50 M RCC slab Culvert @ Ch 490m
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab)
1.50 M RCC slab Culvert @ Ch 10m
1.50 M RCC slab Culvert @ Ch 490m
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50 M RCC slab Culvert @ Ch 600m
1.50 M RCC slab Culvert @ Ch 490m
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50 M RCC slab Culvert @ Ch 10m
1.50 M RCC slab Culvert @ Ch 490m
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
1.50 M RCC slab Culvert @ Ch 10m
1.50 M RCC slab Culvert @ Ch 490m
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
1.50 M RCC slab Culvert @ Ch 10m
1.50 M RCC slab Culvert @ Ch 490m
Gravel Filling betweengravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
1.50 M RCC slab Culvert @ Ch 10m
1.50 M RCC slab Culvert @ Ch 490m
Provision for Km stone
Provision for Hm stone
Provision for Name board
Provision for sign board
2.Strengthening of the road from Kolathur to Marukalankuruchi Road Km 0/0 - 2/200 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the existing metalled / BT surface and compacted by power roller etc., complete as directed by the departmental officers
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Name board
Provision for sign board
3.Strengthening of the road from Kattathur - Pillayarkovil Road Km 0/0 - 1/100 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the existing metalled / BT surface and compacted by power roller etc., complete as directed by the departmental officers
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
1.50 M RCC slab Culvert @ Ch 410m
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
1.50 M RCC slab Culvert @ Ch 410m
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50 M RCC slab Culvert @ Ch 410m
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)
1.50 M RCC slab Culvert @ Ch 410m
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Deck Slab)
1.50 M RCC slab Culvert @ Ch 410m
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50 M RCC slab Culvert @ Ch 410m
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50 M RCC slab Culvert @ Ch 410m
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
1.50 M RCC slab Culvert @ Ch 410m
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
1.50 M RCC slab Culvert @ Ch 410m
Gravel Filling betweengravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
1.50 M RCC slab Culvert @ Ch 410m
Provision for Km stone
Provision for Hm stone
Provision for Name board
Provision for sign board
4.Strengthening of the road from Ayyur - Therkkunatham Road Km 0/0 - 1/200 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the existing metalled / BT surface and compacted by power roller etc., complete as directed by the departmental officers
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Sign board
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M SAKTHIVEL
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_177047.xls
BOQ • 0.33 MB
TechnicalBid5.pdf
Tender Documents • 0.35 MB
PriceBid5.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .