| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹28.8 L+₹3.3 L (12.7%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹31.2 L+₹5.6 L (22.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹31.7 L+₹6.2 L (24.1%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | M/s Raj Brothers and Suppliers Contractor L4 | M/S SHREE HANUMAN CONSTRUCTION L2 | DharmendER Kumar Contractor L1 | M/S JAI DURGE NAMAH CONSTRUCTION COMPANY L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | EARTH WORK IN EXCAVATION BY POCCLAIN M/C AND TRANSPORTATION DONE BY TRACTOR WITH TROLLY PER CUM | 21,081.87 | CUM | 105 ₹22,13,596.35 | 95 ₹20,02,777.65 | 85.05 ₹17,93,013.04 Lowest | 103.5 ₹21,81,973.55 |
| 1.02 | EXTRA FOR SLUSH AND LAHEL FOR EARTH WORK. | 7,263.36 | CUM | 52 ₹3,77,694.72 | 45 ₹3,26,851.2 | 41.72 ₹3,03,027.38 Lowest | 51.5 ₹3,74,063.04 |
| 1.03 | COMPACTION WORK ON EARTH BUND (100%) | 2,416.26 | CUM | 8 ₹19,330.08 | 5 ₹12,081.3 Lowest | 5.79 ₹13,990.15 | 7 ₹16,913.82 |
| 1.04 | DRESSING EARTH WORK ON BUND (100%) | 2,416.26 | CUM | 7 ₹16,913.82 | 5 ₹12,081.3 Lowest | 5.22 ₹12,612.88 | 6 ₹14,497.56 |
| 1.05 | DEWATERING BY PUMP | 122 | HR | 250 ₹30,500 | 200 ₹24,400 | 194.4 ₹23,716.8 Lowest | 200 ₹24,400 |
| 1.06 | EARTH WORK IN EXCAVATION IN TRENCHES FOR FOUNDATION INORDINARY SOIL INCLUDING LIFT UP TO 1.5M AND LEAD OF 30 M | 101.62 | CUM | 100 ₹10,162 | 85 ₹8,637.7 | 72.9 ₹7,408.1 Lowest | 90 ₹9,145.8 |
| 1.07 | PROVIDING & LAYING CEMENT CONCRETE 1:3:6 WITH (1:CEMENT AND 3:COARSE SAND AND 6:40mm GAUGE STONE BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS. (PWD-279b) | 18.64 | CUM | 5,060 ₹94,318.4 | 5,000 ₹93,200 | 4,098.6 ₹76,397.9 Lowest | 5,060 ₹94,318.4 |
| 1.08 | LAYING OF 600 MM NP-3 HUME PIPE IN POSITION | 15 | RM | 2,500 ₹37,500 | 2,372 ₹35,580 | 1,921.32 ₹28,819.8 Lowest | 2,372 ₹35,580 |
| 1.09 | CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK. | 28.83 | CUM | 4,600 ₹1,32,618 | 4,600 ₹1,32,618 | 3,726 ₹1,07,420.58 Lowest | 4,600 ₹1,32,618 |
| 1.10 | 12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK. | 83.7 | SQM | 180 ₹15,066 | 160 ₹13,392 | 129.6 ₹10,847.52 Lowest | 160 ₹13,392 |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
2 Jan 2024, 11:00 amClosed
EEMI MEERUT
EEMI MEERUT
RENOVATION OF POND IN VILLAGE KAKRIPUR BLOCK CHAPROLI DISTT BAGPAT
2023_UPMID_873290_1
741(E-127/23-24)
Open Tender
Civil Works
Item Rate
60 days
BAGPAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
EEMI MEERUT
₹3.2 L
23 Jan 2024
22 Dec 2023
2 Jan 2024
26 Dec 2023
2 Jan 2024
26 Dec 2023
Amount
EARTH WORK IN EXCAVATION BY POCCLAIN M/C AND TRANSPORTATION DONE BY TRACTOR WITH TROLLY PER CUM
EXTRA FOR SLUSH AND LAHEL FOR EARTH WORK.
COMPACTION WORK ON EARTH BUND (100%)
DRESSING EARTH WORK ON BUND (100%)
DEWATERING BY PUMP
EARTH WORK IN EXCAVATION IN TRENCHES FOR FOUNDATION INORDINARY SOIL INCLUDING LIFT UP TO 1.5M AND LEAD OF 30 M
PROVIDING & LAYING CEMENT CONCRETE 1:3:6 WITH (1:CEMENT AND 3:COARSE SAND AND 6:40mm GAUGE STONE BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS. (PWD-279b)
LAYING OF 600 MM NP-3 HUME PIPE IN POSITION
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK.
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.
CEMENT CONCRETE WITH 2 CM GAUGE APPROVED STONE GRIT COARSE SAND & CEMENT IN THE PROPORTION OF 4:2:1 INCLUDING SUPPLY OF MATERIALS,LABOUR, TOOLS & PLANTS ETC REQUIRED FOR PROPER COMPLETION OF THE WORK.
R:C:C WORK WITH CEMENT COARSE SAND & 20MM GAUGE STONE BALLAST IN PROPORTION 1:1.5:3 IN EXCLUDING SUPPLY OF REINFORCEMENT AND ITS FIXING AND BINDING WIRE AND INCLUDING NECESSARY CENNTERING AND SHUTTERING ETC. AND ALSO INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.
M S (TOR STEEL OR PLAIN) IN PLAIN WORK SUCH AS R:C:C OR RB WORK INCLUDING BENDING FOR PROPER SHAPE AND INCLUDING SUPPLY OF STEEL & ITS WASTAGE, BEND ,HOOKS AND AUTHORISED OVERLAPPING SHALL BE MEASURED AND INCLUDING COST OF BINDING WIRE.
M S OR IRON WORK OF GATE SUCH AS HOLDING DOWN BOLTS, HOLD FAST, TIE RODS GRATING ETC. WROUGHT TO REQUIRED FROM INCLUDING SUPPLY OF STEEL BOLTS NUTS WASTAGE ETC. AND THEIR FIXING REQUIRED FOR PROPER COMPLETION OF THE WORK.
M/S SHREE HANUMAN CONSTRUCTION
M/S JAI DURGE NAMAH CONSTRUCTION COMPANY
M/s Raj Brothers and Suppliers Contractor
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .