Loading…
Loading…
Tender Value
₹92.6 L
EMD Value
₹1.9 L
Closing Date
4 Aug 2026, 11:00 am
Supply, Installation, Testing and Commissioning of CCTV Surveillance system in South Campus of South Eastern Railway, Head Quarter at Garden Reach, Kolkata.
TM-GRC-CCTV-HQ-SS-2026
TM-GRC-CCTV-HQ-SS-2026
Open
12 Months
Kolkata, West Bengal
₹0
₹1.9 L
3 Jul 2026
3 Jul 2026
21 Jul 2026
Supply of UTP CAT - 6 cable, having bare Copper Conductor of diameter 0.5 mm, Suitable for Gigabit Ethernet TEC Specification No. G/WIR 06/02 or latest.
Supply of RJ-45 connector. Make: D-link or better.
Supply of 32 mm PVC casing capping in rectangular shape with separate Casing & Capping, double lock, heavy duty & ISI mark with IS:14927 or latest with minimum 1 mm thickness.
Supply of 25 mm (1 inch) PVC conduit pipe rigid plain ended conduit size IS:9537 (part-3) or latest and 9537 (Part-1) 1980 with latest amendment ISI marked with minimum 1.2 mm wall thickness & minimum one socket at every 3 meter pipe.
Supply of 20 mm (medium) PVC conduit pipe rigid plain ended conduit size IS:9537 (part-3) or latest and 9537 (Part-1) 1980 with latest amendment ISI marked with minimum 2 mm wall thickness & minimum one socket at every 3 meter pipe.
Supply of Fibre Distribution Management system (FDMS)/LIU for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. GR/FDM/01/02 April'2007 or latest. This includes supply of installation accessories as per technical specification.
Supply of 6 Core Armoured Mono mode OFC cable as per latest TEC Specification or latest.
Supply of HDPE pipe as per Specification No. RDSO/SPN/TC/45/2013 Rev-2.0 or latest 8 with OD/ID of size 40mm/33mm with suitable couplers, plugs, end caps, spacer, T band etc. as required during execution at the site.
Supply of 24 Port L2 PoE Switch with 2 SFP modules with 3 years warranty complying Specification No. RDSO/SPN/TC/83/2020 Rev.2.0 or latest. Make: Cisco or similar.
Supply of 24 port L-2 Non-PoE switch with 2 SFP ports with 3 years warranty complying Specification No. RDSO/SPN/TC/83/2020 Rev.2.0 or latest. Make: Cisco or similar.
Supply of Fibre Distribution Management system (FDMS)/LIU for 12 Fiber complete with all accessories such as patch cord & pigtail as per TEC Spec. GR/FDM/01/02 April'2007 or latest. This includes supply of installation accessories as per technical specification.
Supply of Industrial vacuum cleaner wet & dry duty with 220 millibar vacuum 12 pressure, air flow rate 54 Liters/sec, suction hose length 3.5-meter, floor nozzle size -350 mm, power cord length-10 meter with 01 no motor of 1350 watt capacity with container capacity 35 Liter with filter dust class - G2 & filter area - 1 sq. meter with stainless steel body & container and operated voltage - 230 V AC. Make- Eureka Forbes/Panasonic, Deerma/ Dyson /Inalsa or better.
Supply of Telecom Optical Fiber Tool Kit comprising of the minimum following equipment. i) Fiber Cleaver 18000 Cuts Type, ii) Tweezer, iii) Cable Sheath Jacket Stripper, iv) Buffer Tube/ Drop Cable Stripper, v) Utility Knife, vi) Screw Driver with Bits, vii) Alcohol dispenser, viii) 13 Cleaning Wipes (Set of minimum 100 Nos), ix) Visual Fault Locator 1mW, x) Plier Needle Nose, xi) Long Nose Plier, xii) Allen Key Set 4 to 10mm, xiii) Drop Cable Stripper, xiv) cable Cutter upto 25mm, xv) Fiber Protection sleeves, set of 100, xvi) Fiber Power meter with adopter, xvii) multi-purpose swa, xviii) Number sticker, xix) spanner set, xx) adjustable wrench, xxi) curved claw hammer, xxii) head light, xxiii) brush, xxiv) Polishing disk, xxv) 1 no. Carry Bag.
Supply of 10 KVA online UPS with 90 minutes battery backup. The detailed specification is as under, I/P - single phase 160-260 volt, O/P voltage single phase 230+-0.5%, output frequency 50+-0.5% Hz , Technology - IGBT-PWM or better, Overall Efficiency (%)- >/=80% & 14 <90% without Inbuilt isolation transformer, Power Factor Load Supported - 0.8 or better, Degree of protection - minimum IP 20, Battery type - SMF/VRLA conforming to JISC:8702 (Pt. I, II & III), Stationary Lead Acid Batteries (with tubular positive plates) in monobloc container conforming to IS:13369:1992 latest or better. Minimum Guaranteed VAH - 24000 & other accessories - 6m cables, rack for batteries etc. Make-Luminous/V-Guard/Exide/Microtek or better.
Supply of PVC insulated 3 Core 2.5 sq.mm Single core Multi-strands copper conductor with ISI marked conforming to IS:694/2010 or latest.
Supply of Digital Earth Resistance meter with inbuilt rechargeable battery 3.5 digit 16 LCD display, testing range 0.01 ohm to 2000 ohm & all accessories as four spikes, suitable length cable (10 meter, 20 meter, 30 meter, 40 meter) on winder, battery charger, carrying bag, operating manual, hammer etc. Make: Motwane/Metravi/Waco/Stanley or better.
Supply of Krone tool for inserting wire into insulation-displacement connectors.
Supply of Insulation tester 100V, 100 Mega ohm with lead cables, Analog Display, metal body hand driven. Make: Waco/Nippen/Fluke/Motwane or better .
Supply of LAN/Network (RJ11 & RJ45) cable tester. Make-D-Link/PA 70025 or better.
Supply of Digital Multimeter as per specification to make - Fluke 87V or better.
Supply of Aluminium double Sided A shape Platform step ladder as per the following 21 specifications as under, Capacity minimum 150 kg, Step Width minimum 2.5 Inch, Normal Size (height without elongation)- minimum 8-foot, Number of steps minimum 6 nos., ladder Width minimum 17.5 Inch, Reach height minimum 12 foot.
Supply of 4 digit Backlit LCD Hand Held True RMS Clamp Meter with iFlex as per specification to make - Fluke 376 FC or better.
Supply, transportation and installation of joint enclosure for 6/12 fibres optical fibre 23 cable complete with all accessories including sealing with mechanical clamp facility for splicing of Optical Fibre cable.
Supply of 24 Fiber OFC Joint Closure as per Specification No. RDSO/SPN/TC/68/ 2014 Rev 1.0 or latest complete with all accessories including sealing with mechanical clamp facility.
Supply of 1G SFP module for 20 KM transmission working on single/dual fibre and should support all the software features, environmental standards and security features as mentioned in RDSO technical document no STT/TAN/IP-MPLS/2020 Ver2.0 or latest.
A2-Supply Non SOR
Supply of Full HD Bullet Type IP Colour camera with Housing, Mount and all other accessories for fixing of cameras as per RDSO spec. No: RDSO/SPN/TC/65/2021 Ver 6.0 or latest (Inspection by RDSO).
Supply of Full HD P/T/Z (Pan / Tilt / Zoom) IP colour camera with Housing. Mount and all other accessories for fixing of cameras as per RDSO spec. No: RDSO/SPN/TC/65/2021 Ver 6.0 or latest, Clause No. 7.0 (Inspection by RDSO).
Supply of Fully functional multipurpose Digital keyboard (Joystick) complete with all accessories, compatible with P/T/Z camera as per RDSO spec. No: RDSO/SPN/TC/65/2021 Ver 6.0 or latest. Clause no. 8.0. (Inspection by authorised representative of Railway).
Supply of 64 Channel Network Video Recorder and 64TB storage after RAID 5/6 4 configuration with HDD ( 8 Nos of HDD, Capacity : 8 TB each), 2 nos. Ethernet port complete with all other accessories as per RDSO Spec. No. RDSO/SPN/TC/65/2021 Ver 6.0 or latest, Clause No. 10.2. The software licenses should be as per RDSO Spec No. : RDSO/SPN/TC/65/2021 Ver. 6.0 or Latest Clause 20.0. (Inspection by RITES).
Supply of Full HD Large Format Display Monitor (55 inch) with HDMI and DVI ports complete with all accessories and HDMI cables, remote controller as per RDSO spec. No. RDSO/SPN/TC/65/2021 Ver 6.0 or latest, Clause No. 9.0 (Inspection by RITES).
Supply of 19" 42U Rack with all accessories like Electrical fitting, Fan tray, Patch Panel, cable manager, spike buster for housing IP storage unit as per specification (Attached). (Inspection by authorised representative of Railway).
Supply of PC Workstation for Viewing cameras in multi-screen mode, Monitoring and System management and 4K UHD LED Monitor of 24 inch size including all required licensed 7 software (like OS, MS Office, Anti-virous- total 3 years security), multifunction device for documentation, accommodate PC workstation & monitor with all accessories, spike buster (minimum 5 nos. 6A points with fuse), 500VA Line interactive UPS, Mounting Rack and other required materials as per RDSO spec. No. RDSO/SPN/ TC/65/2021 Ver 6.0 or latest, Clause No. 11.0 (Inspection by RITES).
Supply of Layer-2, PoE Switch (minimum 8+2 port manageable) with 8 no. 8 10/100/1000 Mbps Ethernet port, PoE and 2 nos. 1000 BaseX SM SFP port with optical modules complete with all accessories etc. as per RDSO spec. No. RDSO/SPN/TC/65/2021 Ver 6.0 or latest, Clause 14.0 (III) (Inspection by RITES).
Supply of Armoured UTP CAT-6 Cable 4 pair for outdoor purpose as per Specification(Attached). Make- Systimax, Panduit, 3C3. (Inspection by RITES).
Supply of Din Rail Mounted Industrial Managed POE+ Ethernet Switch 8x10/100/1000 Base T PoE+ with 2 Nos.1G SFP Ports. Along with Power Supply Adopter for 230v A.C. Supply. As per specification (Attached). (Inspection By RITES)
Supply of 6U Pole Mount Weatherproof Outdoor Enclosure, IP 65. As per Technical Specification(Attached).(Inspection By RITES)
Supply and installation of 4 meter GI pole base 4 inches or higher. As per specification (attached). (Inspection By RITES)
Supply and installation of 6 mtr. GI pole base 4 inches or higher. As per specification (attached). (Inspection By RITES)
Supply of LC to SC/ SC to SC/ LC to LC Single Mode Simplex OFC Patch Cable 1m length.Make- Systimax, Panduit,3C3. (Inspection by authorised representative of Railway).
Single mode Unarmoured Optical Fibre Cable 6 Core (6F).Make- Systimax, Panduit, 3C3. (Inspection by authorised representative of Railway).
Supply of PVC Flexible pipe 1" dia. (Inspection by authorised representative of Railway).
Supply of PVC Flexible pipe 1/2" dia. (Inspection by authorised representative of Railway).
Multi-Functional Long Range LED Torch with Rechargeable Emergency Light Make- PHILIPS, WIPRO or Better (Inspection by authorised representative of Railway).
Crimping Tool with Dual Crimp for CUTS, Strips & CRIMPS of RJ-45 connectors & 8P 8C Plugs Manual Crimper. Make-MX or Similar (Inspection by authorised representative of Railway).
B1-Execution SOR
Installation, splicing and commissioning of Fibre Distribution Management system (FDMS) for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. with latest amendment. The sundry material if required any to be supplied by contractor.
Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks, bushes, ballast & reconditioning etc., including bailing out water and disposal of 2 extra soil including back filling with excavated earth and ramming of trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER or any other latest guidelines. Note: In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. Depth 1.0 meter, Width 0.3 meter.
Installation, splicing and commissioning of Fibre Distribution Management system (FDMS) for 12 Fiber complete with all accessories with patch cord & pigtail as per TEC Spec. with latest amendment. The sundry material if required any to be supplied by contractor.
HDD: In case of short stretches (less than 100 m in single stretch). Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/river bed and minimum 1 m at track/road/pucca road crossing area etc. This 4 includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. RDSO/SPN/TC/45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site incharge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring. 1 HDPE pipe
Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 mtr. Track/ Pucca road/Platform crossing/ Level crossing as per SEM Drawing No.15-D5 including supply, transportation and laying of 5 DWC pipes (full) with collar(for jointing pipes) Inner diameter/Outer diameter:103mm/120mm to Specification No.14830 (Part-2):2001 as per SEM Drawing No. 15-D4 and drawing of cable through DWC pipes with collar(for jointing pipes) including back filling and ramming after cable laying as specified in Tech. Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER for S&T Cables or any latest guidelines. This includes repairing and plastering of Platform/Pucca road after cable laying.
Supply & laying of 1200 mm X 1200 mm X 1500 mm pre-cast/cast in -situ RCC 6 chamber including top cover to connect cable ducts (300 mm X 300 mm and/or 300 mm X 100 mm or both individual) as per RDSO drawing No. SDO/S&T/RCC DUCT/1019/1 & 2, dated 29.5.23 or latest. Note- The rate is inclusive of all type of transportation including labour till it is placed into trenches. The laying of cables shall be paid separately fulfilling the laying procedure as per above drawings.
Chase cutting in floor/wall and restoring of floor/wall with plaster for concealing of 50 mm./25mm conduit pipe (covered separately) in floor/wall then painting with matching colour as per existing colour of the floor/wall.
Blowing/Drawing/Pulling of OFC cable through already laid HDPE duct /GI pipe /DWC pipe etc.
Laying of HDPE duct in trench and its protective work as per direction of site engineer.
Laying of S&T Cables (Signal/Quad/Power) in the excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10 metres interval with 'U' clamp on trench to Drawing No. CSTE/CON /CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/SK/T/6 or latest 10 punched at an interval of 30 metres and wrapped round each cable throughout the cable route and also at every track/Road/ platform crossing as above specified in Technical Circular No. 2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports.
Splicing of Optical Fiber Core and routing in joint closure/FDMS as per instruction of site Engineer.
B2-Execution Non SOR
Installation, Testing & Comissioning of Full HD Bullet Type IP Colour camera along with Housing, Mount. All the accessories and fixing materials required for this installation are to be supplied by contractor within the same cost.
Installation, Testing & Commissioning of Full HD P/T/Z (Pan/Tilt/Zoom) IP Colour camera along with Housing, Mount etc. All the accessories and fixing materials required for this installation are to be supplied by contractor with in the same cost.
Installation, Testing & Commissioning of Digital Key Board (Joystick).
Installation, Testing & Commissioning of 64 Channel Network Video Recorder and 64 4 TB storage after RAID 5/6 configuration with HDD (8 Nos of HDD, Capacity : 8 TB each). All the accessories and fixing materials required for this installation are to be supplied by the contractor within the same cost .
Installation, Testing & Commissioning of PC Workstation with all accessories.
Installation, Testing & Commissioning of Full HD large format display monitor 55" . All the accessories and fixing materials required for this installation are to be supplied by the contractor within the same cost .
Installation, Testing & Commissioning of 19" 42U rack. All the accessories and fixing materials required for this installation are to be supplied by the contractor within the same cost .
Installation ,Testing & Commissioning of 24 port L-2 Non-PoE switch.
Installation ,Testing & Commissioning of 8 Port Industrial Managed PoE+ Switch
Installation ,Testing & Commissioning of 6U Pole Mount Weatherproof Outdoor Enclosure, IP 65.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
RDSO_CCTV_SecurityGuidelines24.04.24_1.pdf
ATTACHMENT
TenderDocumentCCTVSouthCampus2026_6.pdf
ATTACHMENT
TechnicalSpecificationSouthSideCCTV.pdf
ATTACHMENT
AdvCorrectionSlip_compressed.pdf
ATTACHMENT
GCC April 2022
ATTACHMENT
CorrectionSlipGCCApril2022.pdf
ATTACHMENT
IndianRailwaysStandardGeneralConditionsofContract_April-2022.pdf
ATTACHMENT
Download all tender documents and submit your bid