Loading…
Loading…
Tender Value
₹19.6 L
EMD Value
₹39,220
Closing Date
1 Jul 2026, 4:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer PWD(RandB) Division Satwari
Office of the Executive Engineer PWD(RandB) Division Satwar
Construction of CRC (Chawki Rearing centre) Building at basic seed station Miran Sahib, Jammu District.
2026_PWDJK_312593_1
Short e-NIT No. 29 of 2026-27 Dated 16-06-2026
Open Tender
Civil Works
30 days
Satwari
As per eNIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB) Division Satwari
₹39,220
Satwari
16 Jun 2026
16 Jun 2026
2 Jul 2026
16 Jun 2026
1 Jul 2026
16 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | - | Cum | 479.3 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 7.43 | Cum | 4,826.5 | ₹35,860.9 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but exuding the cost of centring and shuttering. All work upto plinth level with: M10 | 19.1 | Cum | 5,733.6 | ₹1,09,511.76 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level.1:1.5:3 mix | 9.9 | Cum | 7,788.4 | ₹77,105.16 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 20.77 | Cum | 7,877.4 | ₹1,63,613.6 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 20.77 | Cum | 1,455.65 | ₹30,233.85 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 | 14.98 | Cum | 9,821.85 | ₹1,47,131.31 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | 2,239.4 | Kg | 123.2 | ₹2,75,894.08 |
| 9 | centring, shuttering for Columns | 155.53 | Sqm | 286.35 | ₹44,536.02 |
| 10 | centring, shuttering for Suspended floors, roofs, landings, balconies and access platforms. | 81.78 | Sqm | 718.2 | ₹58,734.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_1011835.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid