| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹85,850Accepted-AOC | ₹85,850 Quoted ₹85,864 | 1 | Accepted-AOC l1 tenderer |
| Sl No | Description | Qty | Unit | MARSTRONZ INFRA L1 |
|---|---|---|---|---|
| 1.00 | Removing the existing weathering course, clearing away the debrises from the roof top and clean the surface with water including cost of labour lead, lift, etc, complete as per standard specification. | 120 | m2 | 65 ₹7,800 |
| 2.00 | P.C.C 1:2:4 using 6mm HBG metal for flooring screed concrete with floor finishing including cost of all materials lead, lift, labour charges etc., complete and as directed by engineer at site | 10 | m3 | 6,229 ₹62,290 |
| 3.00 | Supplying and fixing the in position using 110 mm dia PVC down fall pipe (4 kg/sq.cm)of approved make and quality conforming to the IS specification for rain water line including cost of PVC pipe,necessary PVC specials,GI clamp with lead lift as directed by the Engineer in charge etc..complete. | 6 | RM | 446 ₹2,676 |
| 4.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹6,548.94 |
| 5.00 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹6,548.94 |
| 6.00 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only | 1 | Lumpsum | - |
Tender Value
₹72,879
Closing Date
28 Nov 2025, 2:00 pmClosed
SE/CEDC/SOUTH/CBE
O/O.SE/CEDC/S/CBE
Improvement work of dismantling and removing existing damaged weathering course and providing screed concrete with floor finishing for control Building open terrace at Devanampalayam 110 22 KV SS
2025_EB_624125_1
SE/CEDC/SOUTH/CBE/No.12/25-26
Open Tender
Civil Works - Buildings
30 days
Devanampalayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
9 Jan 2026
17 Nov 2025
29 Nov 2025
17 Nov 2025
28 Nov 2025
17 Nov 2025
Amount
Removing the existing weathering course, clearing away the debrises from the roof top and clean the surface with water including cost of labour lead, lift, etc, complete as per standard specification.
P.C.C 1:2:4 using 6mm HBG metal for flooring screed concrete with floor finishing including cost of all materials lead, lift, labour charges etc., complete and as directed by engineer at site
Supplying and fixing the in position using 110 mm dia PVC down fall pipe (4 kg/sq.cm)of approved make and quality conforming to the IS specification for rain water line including cost of PVC pipe,necessary PVC specials,GI clamp with lead lift as directed by the Engineer in charge etc..complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_746290.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid