Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC GSTIN: 19AAAAA2503J1ZR, 19AAAAN2503J1ZR, 19AACCH9135N1Z1, 19AACFO0832E1ZL, 19ADAPG5283A1ZX, 19AEXPC3746A1ZGBANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | ₹4.8 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹4.9 LRejected-Finance GSTIN: 19AAFFD7302M1Z9, 19AAMFD6070F1ZA, 19AANFD7027P1ZP, 19ACXPD9843P1ZE, 19ADAPG5283A1ZX, 19ADXPD9169M1ZF, 19AGOPD9226B1ZF, 19AICPR7318E1Z5, 19AKHPD9104B1ZK, 19AKPPD7507C1Z7, 19AKVPD7056L1ZE, 19ALHPD5532A1ZK, 19AMGPD3363B1ZG, 19AMOPD8737H1ZK, 19AMSPD1660P1ZF, 19AMSPD1660P1ZH, 19AMSPD1660PIZF, 19ANJPD0196N1ZL, 19ANYPD9808J1Z5, 19APAPR6140J1ZI, 19AQBPD2111J1ZC, 19AQCPD6515H1Z0, 19AQVPD1740P1Z7, 19ATHPD0356J1ZP, 19AWBPD0564F1ZW, 19AZAPD1219P1ZC, 19AZNPD4923H1Z7, 19BJQPD2878B2Z0, 19BUTPD6531M1ZZ, 19BYIPD1800J1ZM, 19BZHPD4920P1ZY, 19CBOPD6743G1ZD, 19CLWPD3372H1ZN, 19COUPD7961P1ZR21 KBM CHAKDAH P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | ₹4.9 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹4.9 LRejected-Finance GSTIN: 19AACCH9135N1Z1, 19AACFD3344C1ZV, 19AACFO0832E1ZL, 19ADAPG5283A1ZX, 19AEEPD6034P1Z8, 19AEXPC3746A1ZG, 19AGVPD9724H1ZT, 19AMFPD7752B1Z8, 19ANXPD9601L1ZB, 19AOXPD9320B1ZU, 19CAFPD9818Q1ZX, 19CEVPD1860E1ZC, 19CMLPD0247B1ZG00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹4.9 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | DEY ENTERPRISE L3 | NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD. L1 | DAS CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, delivery and storage at site of Vertical Turbine
Pump with discharge head assembly, sole plate,
companion flange, thrust bearing housing with
coupling, NRR assembly and motor stool, self water
lubricated column and shaft assembly, bowl assembly
and basket strainer having the following specification.
Discharge :- 150 m3 per hour
Generated Head :- 35 MWC
H-Q-P Curve of pumps, Datasheet, General
Arrangement of drawing and Pump Manufacturing
Quality Plan has to be submitted during the delivery.
(Pumps should be suitable for PLC operated unmaned
operation facility and pumping clear water form CWR at Narayanpur Distribution Zone to one (01) nos OHR | 1 | Nos. | 4,18,000 ₹4.2 L | 4,10,000 ₹4.1 L | 4,11,500 ₹4.1 L |
| 2.00 | add GST @18% | 1 | item | 75,240 ₹75,240 | 73,800 ₹73,800 | 74,070 ₹74,070 |
Tender Value
Refer Docs
EMD Value
₹9,999
Closing Date
28 Sept 2024, 11:30 amClosed
ASSISTANT ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Supply, delivery and storage at site of stand-by Vertical Turbine Pump at newly constructed CWR under Narayanpur Distribution Zone within Malda Arsenic Area Water Supply Scheme (Southern Sector) under Malda Mechanical Division PHE Dte.
2024_PHED_752720_4
WBPHED/AE-II/MLMD/NIeT_05 of 2024-2025
Open Tender
Electrical Work/ Equipment
10 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
3 documents required · 3 mandatory
₹9,999
Yes
26 May 2026
21 Sept 2024
30 Sept 2024
21 Sept 2024
28 Sept 2024
21 Sept 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.22 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 3.44 MB
BOQ_1669066.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid