| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC AT DERA COLLIERY TALCHER ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹6.2 L Quoted ₹5.3 L | L1 | Accepted-AOC Awarded for being as L1. |
| 2 | L2₹8.0 LRejected-Finance AT NAKULABASAPUR PO HENSAMULA TALCHER DIST ANGUL ODISHA PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹8.0 L | L2 | Rejected-Finance Rejected for being as L2. |
| Sl No | Description | Qty | Unit | M/S.RAKHI ELECTRICALS L2 | OMM SHANKAR TRANSPORT L1 |
|---|---|---|---|---|---|
| 1.00 | 1000 GPM Maxflow 149HBP5 Pump Shifting from 60L/MD to 56L/MD and Starting
MATERIAL COST:
1.Industrial Oxygen Gas- 4600001197 - 21 CuM
2.Disolved Acetylene Gas - 4600001199 - 7 CuM
3.MS Welding Electrodes 4mm - 4600011536 - 5 Kg
4.MS Bolt, 5/8IN, 3IN, with Nut - 4600004311 - 10 Kg
5.MS Flange, 200MM, Plane Face - 4600007619 - 20Nos.
LABOUR COST :
(i).Disconnection & Restoration of Power
(ii).Dismantaling, Loading & Transporting
1.Electric Motor 180 kW from 60L/MD to Surface
2.Electric Motor 212 kW from Surface to 56L/MD
3.Starter and Power Cable from 60L/MD to 53L/MD
4.Pump 1000 GPM from 60L/MD to Surface
5.Pump 1000 GPM from Surface to 56L/MD
6.Base Frame from Surface to 56L/MD
7.MS Pipes for Pipeline of Suction along with Foot Valve, Bends, Jetting Hose, Welding Machine, DA, Oxygen as reqd. from Surface to 56L/MD
(iii).Unloading, Installation & Delivery Side Matching
1.Site Preparation & Base Frame Installation
2.Electric Motor 200 kW Installation
3.Pump 1000 GPM Installation
4.Suction Pipe & Foot Valve Fitting
5.Delivery Pipeline Fitting with Bends & Matching
6.Welder, Skilled (for Fabrication of Bends, Foot Valves etc. as required and Matching Work)
7.Helper, Semi-Skilled (for Fabrication of Bends, Foot Valves etc. as required and Matching Work) | 1 | Nos. | 3,60,361 ₹3.6 L | 2,36,500 ₹2.4 L |
| 2.00 | 500 GPM KBL DSM-5B Pump Shifting from 28WL/3D to 28WL/0D and Starting
MATERIAL COST:
1.Industrial Oxygen Gas- 4600001197 - 21 CuM
2.Disolved Acetylene Gas - 4600001199 - 7 CuM
3.MS Welding Electrodes 4mm - 4600011536 - 10 Kg
4.MS Bolt, 5/8IN, 3IN, with Nut - 4600004311 - 10 Kg
5.MS Flange, 150MM, Plane Face - 4600007615 - 20Nos.
LABOUR COST :
(i).Disconnection & Restoration of Power
(ii).Dismantaling, Loading & Transporting
1.Electric Motor 55 kW from 28WL/3D to Surface
2.Starter & Main Switch from 28WL/3D to Surface
3.Electric Motor 55 kW from Surface to 28WL/0D
4.Starter & Main Switch from Surface to 28WL/0D
5.MS Pipes for Pipeline of Suction along with Foot Valve, Bends, Jetting Hose, Welding Machine, DA, Oxygen as reqd. from Surface to 28WL/0D
6.Pump 500 GPM along with Base Frame from 28WL/3D to 28WL/0D
(iii).Unloading, Installation & Delivery Side Matching
1.Site Preparation & Base Frame Installation along with Pump 500 GPM Mounting
2.Electric Motor 55 kW Motor Installation
3.Suction & Delivery Pipeline Fitting along with Bends, Foot Valve, NRV etc. and Matching
4.Starter and Power Cable Rearrangement
5.Welder, Skilled (for Fabrication of Bends, Foot Valves etc. as required and Matching Work)
6.Helper, Semi-Skilled (for Fabrication of Bends, Foot Valves etc. as required and Matching Work) | 1 | Nos. | 2,01,914 ₹2.0 L | 1,32,506 ₹1.3 L |
| 3.00 | 1000 GPM M&P DST 6X8 Pump Motor Dismantling, Transporting, Fitting and Starting
MATERIAL COST:
1.Industrial Oxygen Gas- 4600001197 - 21 CuM
2.Disolved Acetylene Gas - 4600001199 - 7 CuM
3.MS Welding Electrodes 4mm - 4600011536 - 5 Kg
LABOUR COST:
(i).Disconnection & Restoration of Power
(ii).Dismantaling & Transporting
1.Electric Motor 180 kW from 38EL/32R to Surface
2.Starter Accessories Transportation to Surface
3.Electric Motor 180 kW from Surface to 38EL/32R
4.Starter Accessories Transportation to 38EL/32R
5.Welding Machine, DA, Oxygen etc. Transporting
(iii).Unloading, Installation & Delivery Side Matching
1.Electric Motor 180 kW Installation & Matching
2.Suction & Delivery Pipe Line Matching
3.Starter Fixing and Power Cable Rearrangement
4.Welder, Skilled (Base Plate Alteration & Matching)
5.Helper, Semi-Skilled (Base Plate Alteration & Matching) | 1 | Nos. | 2,40,418 ₹2.4 L | 1,57,774 ₹1.6 L |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | no | - | - |
Updated dates
Tender Value
₹8.5 L
EMD Value
₹10,600
Closing Date
19 Dec 2025, 5:00 pmClosed
THE STAFF OFFICER (EnM), TALCHER AREA
STAFF OFFICER (E AND M), OFFICE OF THE GENERAL MANAGER, MCL, TALCHER AREA, P.O. - DERA COLLIERY, DIST- ANGUL (ODISHA), PIN - 759103 MAHANADI COALFIELDS LIMITED, TALCHER AREA
Dismantling, transportation and re-installation of 02 nos. 1000 GPM Pump sets and 01 no. 500 GPM Pump set at different locations of Nandira Underground Mine.
2025_MCL_348544_1
GM(TA)/SO(EnM)/e-29, Dated.02.12.2025
Open Tender
Electrical and Maintenance Works
30 days
Nandira Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,600
26 Mar 2026
2 Dec 2025
20 Dec 2025
3 Dec 2025
19 Dec 2025
3 Dec 2025
3 Dec 2025 - 10 Dec 2025
Amount
1000 GPM Maxflow 149HBP5 Pump Shifting from 60L/MD to 56L/MD and Starting MATERIAL COST: 1.Industrial Oxygen Gas- 4600001197 - 21 CuM 2.Disolved Acetylene Gas - 4600001199 - 7 CuM 3.MS Welding Electrodes 4mm - 4600011536 - 5 Kg 4.MS Bolt, 5/8IN, 3IN, with Nut - 4600004311 - 10 Kg 5.MS Flange, 200MM, Plane Face - 4600007619 - 20Nos. LABOUR COST : (i).Disconnection & Restoration of Power (ii).Dismantaling, Loading & Transporting 1.Electric Motor 180 kW from 60L/MD to Surface 2.Electric Motor 212 kW from Surface to 56L/MD 3.Starter and Power Cable from 60L/MD to 53L/MD 4.Pump 1000 GPM from 60L/MD to Surface 5.Pump 1000 GPM from Surface to 56L/MD 6.Base Frame from Surface to 56L/MD 7.MS Pipes for Pipeline of Suction along with Foot Valve, Bends, Jetting Hose, Welding Machine, DA, Oxygen as reqd. from Surface to 56L/MD (iii).Unloading, Installation & Delivery Side Matching 1.Site Preparation & Base Frame Installation 2.Electric Motor 200 kW Installation 3.Pump 1000 GPM Installation 4.Suction Pipe & Foot Valve Fitting 5.Delivery Pipeline Fitting with Bends & Matching 6.Welder, Skilled (for Fabrication of Bends, Foot Valves etc. as required and Matching Work) 7.Helper, Semi-Skilled (for Fabrication of Bends, Foot Valves etc. as required and Matching Work)
500 GPM KBL DSM-5B Pump Shifting from 28WL/3D to 28WL/0D and Starting MATERIAL COST: 1.Industrial Oxygen Gas- 4600001197 - 21 CuM 2.Disolved Acetylene Gas - 4600001199 - 7 CuM 3.MS Welding Electrodes 4mm - 4600011536 - 10 Kg 4.MS Bolt, 5/8IN, 3IN, with Nut - 4600004311 - 10 Kg 5.MS Flange, 150MM, Plane Face - 4600007615 - 20Nos. LABOUR COST : (i).Disconnection & Restoration of Power (ii).Dismantaling, Loading & Transporting 1.Electric Motor 55 kW from 28WL/3D to Surface 2.Starter & Main Switch from 28WL/3D to Surface 3.Electric Motor 55 kW from Surface to 28WL/0D 4.Starter & Main Switch from Surface to 28WL/0D 5.MS Pipes for Pipeline of Suction along with Foot Valve, Bends, Jetting Hose, Welding Machine, DA, Oxygen as reqd. from Surface to 28WL/0D 6.Pump 500 GPM along with Base Frame from 28WL/3D to 28WL/0D (iii).Unloading, Installation & Delivery Side Matching 1.Site Preparation & Base Frame Installation along with Pump 500 GPM Mounting 2.Electric Motor 55 kW Motor Installation 3.Suction & Delivery Pipeline Fitting along with Bends, Foot Valve, NRV etc. and Matching 4.Starter and Power Cable Rearrangement 5.Welder, Skilled (for Fabrication of Bends, Foot Valves etc. as required and Matching Work) 6.Helper, Semi-Skilled (for Fabrication of Bends, Foot Valves etc. as required and Matching Work)
1000 GPM M&P DST 6X8 Pump Motor Dismantling, Transporting, Fitting and Starting MATERIAL COST: 1.Industrial Oxygen Gas- 4600001197 - 21 CuM 2.Disolved Acetylene Gas - 4600001199 - 7 CuM 3.MS Welding Electrodes 4mm - 4600011536 - 5 Kg LABOUR COST: (i).Disconnection & Restoration of Power (ii).Dismantaling & Transporting 1.Electric Motor 180 kW from 38EL/32R to Surface 2.Starter Accessories Transportation to Surface 3.Electric Motor 180 kW from Surface to 38EL/32R 4.Starter Accessories Transportation to 38EL/32R 5.Welding Machine, DA, Oxygen etc. Transporting (iii).Unloading, Installation & Delivery Side Matching 1.Electric Motor 180 kW Installation & Matching 2.Suction & Delivery Pipe Line Matching 3.Starter Fixing and Power Cable Rearrangement 4.Welder, Skilled (Base Plate Alteration & Matching) 5.Helper, Semi-Skilled (Base Plate Alteration & Matching)
Total impact of GST for the purpose of CTC
M/S.RAKHI ELECTRICALS (BID ID -1201910)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_361265.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
0.60 MB
Document
1.16 MB
BOQ
BOQ • 0.32 MB
Download all tender documents and submit your bid