| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | ₹8.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.9 LRejected-Finance | ₹8.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹8.9 LRejected-Finance 10 8 111 GHOLA ROAD PO KAZIPARA SURYASEN PALLY BARASAT NORTH 24 PGS WEST BENGAL KOLKATA 124 | 124 | ₹8.9 L | L3 | Rejected-Finance L3 |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
9 Feb 2026, 12:00 pmClosed
DG (ROADS)
Chaplin square, 5/2, Chowringhee place, Kol-13
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT BAISALI PARK IN WARD NO. 111 UNDER BR XI
2026_KMC_996805_1
KMC/ROADS/2025-2026/410
Open Tender
CIVIL WORKS
60 days
BAISALI PARK
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,000
Yes
24 Feb 2026
31 Jan 2026
11 Feb 2026
31 Jan 2026
9 Feb 2026
31 Jan 2026
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) (Ref : PWD (Rds & Brdgs)-2018 It. No. 3.04 Page No.237
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (a) For Fine Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-3)
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10 (ii) Page No.247 & page-222 sl. No-5 (f))
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10)
Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303])
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303])
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1)
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (b) 1:4:8 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10)
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e))
Bituminous Macadam using Hot Mix Plant(HMP) (Using bitumen VG-40) Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired -compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). A. For Grading 2(19.0 mm nominal size, 50-75mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH. (Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-213(table-3.3-1) & 251&252(item 5.03). 7th Addenda & Corrigenda SOR 2018)
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole / gully pit cover with matching frame as per I.S. 12592 (M.D.) i) 15 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover : 565 mm. X 410 mm. X 90 mm. Frame : 715 mm. X 565 mm. X 185 mm. Weight : 140 Kg. (approx.)
Raising manhole cover and frame with CBW (1:4), 375 mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13))
Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular Surfaces treated with primer (Using Bitumen Emulsion at the rate of 0.25 to 0.30 kg per sqm.)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02))
Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02))
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Night Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 )
Liquid Seal Coat (Type A) Providing and laying Liquid Seal Coat (Type A) with approved quality stone chips and bitumen binder on thoroughly cleaned black top surface, spreading screened & cleaned stone aggregates (100 % passing through 11.2 mm sieve and retained on 2.36 mm sieve) uniformly @ 0.09 m3 of dry aggregate per 10 m2 of area using suitable means, brushing the chips, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and stone chips, cost of heating the binder and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) With Cationic Bitumen Emulsion (@ 15.00 kg / 10 sqm.)((Ref. - Item No. - 5.13(A)(II), P-258 of P.W(R)D Schedule 2018, Format-B, P-220 of P.W(R)D Schedule 2018, TABLE No. T-1, Item no.-4/A, P-230 of P.W(R)D Schedule 2018, TABLE III-2, ROW-16, P-226 of P.W(R)D Schedule 2018, Ref-TABLE No. T-1, Item no.-3/A, P-230 of P.W(R)D Schedule 2018, 1.03 A (C), P-227 of P.W(R)D Schedule 2018, TABLE No. T-1, Item no.-3/A, P-230 of P.W(R)D Schedule 2018))
Sub Total
Please Enable Macros to View BoQ information
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
TENDERFORM410.pdf
Tender Documents • 0.87 MB
BOQ_2439532.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid