| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.8 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹20.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.8 LAdmitted-Fee/PreQual/Technical/Finance | -0.05% | ₹20.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹20.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹20.8 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20.8 L
EMD Value
₹20,800
Closing Date
21 May 2026, 6:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Zone 6 Ward 8 Masvanpur Main road estith Thakur Govind Narayan Park sundrikaran ka karya
2026_MSME_1148348_21
338/EE4/26-27
Open Tender
Civil Works
Percentage
120 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineering UPSIC KANPUR
₹20,800
2 Jun 2026
14 May 2026
22 May 2026
14 May 2026
21 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in ordinary soil up to 1.5 mtr lift & 30.0 mtr lead etc all complete. | 23.85 | Cum. | 205.71 | ₹4,906.18 |
| 2 | Providing and laying cement concrete 8:4:1 [Stone ballast 8 (40mm normal size) : 4 sand : 1 cement] and curing etc all complete. | 4.71 | Cum. | 5,383.39 | ₹25,355.77 |
| 3 | Providing & Laying cement concrete 1:1.5:3 with 20 mm nominal size aggregate in retaining walls,return walls,walls including attached pilasters,coloumns piers abutments pillars posts strust buttresses,string or lacing course parapets coping bed blocks anchor blocks plain window sills fillets sunken floor etc up to fillets sunken floor etc.excluding the cost of centering Shuttering and finishing | 4.19 | Cum. | 7,148.68 | ₹29,952.97 |
| 4 | Providing & Laying cement concrete 1:1.5:3 with 20 mm nominal size aggregate in retaining walls,return walls,walls including attached pilasters,coloumns piers abutments pillars posts strust buttresses,string or lacing course parapets coping bed blocks anchor blocks plain window sills fillets sunken floor etc up to fillets sunken floor etc.excluding the cost of centering Shuttering and finishing. | 1.75 | Cum. | 8,576.87 | ₹15,009.52 |
| 5 | M-150 brick work in 1:4 one cement and 4 coarse sand mortar in foundation including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (PWD SI No. 6.1.1) | 6.39 | Cum. | 5,636.48 | ₹36,017.11 |
| 6 | M-150 brick work in 1:4 one cement and 4 coarse sand mortar in foundation including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (PWD SI No. 6.1.1) | 20.68 | Cum. | 5,636.48 | ₹1,16,562.41 |
| 7 | 12 mm thick 1:4 cement coarse sand plaster…. Complete item | 209.93 | sqm | 282.41 | ₹59,286.33 |
| 8 | M.s Steel…........ Complete item | 2,097 | kg | 102.31 | ₹2,14,544.07 |
| 9 | Providing and laying Putty…..... Complete item | 209.95 | sqm | 123.32 | ₹25,891.03 |
| 10 | Finishing of wall….. Complete item | 209.95 | sqm | 89.22 | ₹18,731.74 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
BOQ_2149751.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].