| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance NO 15 PULAVAR GOVINDAN STREET GANDHI NAGAR AVADI CHENNAI 600 054 | AVADI | CHENNAI | TAMIL NADU | 600054 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹2.7 L (2.47%)Admitted-Finance | ₹1.1 Cr+₹2.7 L (2.47%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹3.5 L (3.20%)Admitted-Finance NO 18 BHARATHI STREET WEST GANDHI NAGAR AVADI CHENNAI 600 054 | CHENNAI | THIRUVALLUR | TAMIL NADU | 600054 | ₹1.1 Cr+₹3.5 L (3.20%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Firm does not meets enlistment criteria to B class as per documents submitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Since not enlisted in appropriate category and two class below eligible class |
| Sl No | Description | Qty | Unit | S B BABU AND SONS L2 | BKR Enterprises L3 | D Subramani & Sons L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete (unreinforced) in manually / by mechanical means of nominal concrete 1:3:6 or richer mix (including equivalent design mix) including disposal of material within 50metres lead complete all as specified and directed. | 29 | CUBIC METRE | 950 ₹27,550 | 500 ₹14,500 Lowest | 1,400 ₹40,600 |
| 2.00 | M&L of 62mm thick cement concrete flooring with concrete hardener topping, under layer 50mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kgs of cement or as per manufacture’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc., complete all as specified and directed. | 158 | SQUARE METRE | 1,350 ₹2,13,300 | 2,000 ₹3,16,000 | 1,200 ₹1,89,600 Lowest |
| 3.00 | M&L for 3mm thick epoxy medium duty flooring of any shade consisting of following: -
Preparation of surface by scarifying the concrete surface to remove all oil, grease, paint or any other foreign particles and ensure complete adhesion of the coating to base floor using floor griding with vaccumiser. the concrete surface shall have a rough clean, dust free before application of high compressive strength epoxy flooring complete all as specified and directed. | 158 | SQUARE METRE | 1,550 ₹2,44,900 Lowest | 2,000 ₹3,16,000 | 2,200 ₹3,47,600 |
| 3.01Providing and applying two component primer CIPOXY 11 (100 microns) of CIPY or equivalent of FOSROC/BASF on the prepared surface by brush / roller covered and sealed evenly on entire surface and allow for 4-5 hours curing. Applying two components CIPOXY-90 (in combination with graded aggregates, offers the highest compressive strength, greater than 100 MPa among the epoxy screed) mortar in the ratio 2:1 and mixed with 2.5 parts of Silica Quartz in a powder mixture to achieve homogenous and applied & levelled by trowelling to form a monolithic layer to a thickness of 1900microns and allow curing for 4-5 hours complete all as specified and directed. | ||||||
| 3.02Self leveling EPU top coat with CIPOTHANE SL 1000 of CIPY or equivalent of FOSROC/BASF at a specified ratio and levelled by trowelling to a thickness of 1000 micron and spike roller is applied for de-aeration. The entire top coat has to be dried for 24 hours before loading complete all as specified and directed. | ||||||
| 4.00 | M&L for Yellow or White (Aisle) band 75mm marking with 2 component Polyurethane resin + hardener with fluorescent (FK-666) on applied EPU flooring complete all as specified and directed.
Note for Sl item No. 3 & 4: Equivalent construction chemical of other specified makes can also be used. | 63 | RUNNING METRE | 150 ₹9,450 Lowest | 500 ₹31,500 | 360 ₹22,680 |
| 5.00 | Earth work in excavation for all kind of soil by mechanical means (hydraulic excavator) / manual means over areas including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m complete all as specified and directed. | 11 | CUBIC METRE | 150 ₹1,650 Lowest | 500 ₹5,500 | 360 ₹3,960 |
| 6.00 | Moorum / red bajri filling in floors or pavings, laid in layers not exceeding 15cm thick, spread, levelled and rammed including watering complete all as specified and directed. | 9 | CUBIC METRE | 1,550 ₹13,950 | 1,500 ₹13,500 | 1,200 ₹10,800 Lowest |
| 7.00 | M&L for P.C.C with 1:4:8 type D2 (40mm graded stone aggregate) filing in as mass concrete complete all as specified and directed. | 2 | CUBIC METRE | 7,550 ₹15,100 | 7,500 ₹15,000 Lowest | 7,600 ₹15,200 |
| 8.00 | M&L for P.C.C with 1:2:4 of 40mm thick using 20mm graded stone aggregate laid as levelling course complete all as specified and directed. | 12 | CUBIC METRE | 7,550 ₹90,600 Lowest | 8,500 ₹1,02,000 | 8,600 ₹1,03,200 |
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
20 Aug 2026, 6:55 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD OPP JUBILEE BUS STATION PICKET SECUNDERABAD 500003
SPECIAL REPAIRS TO AUDITORIUM ANNEXE GROUND FLOOR DH ANNEXE BUILDING IN TECHNICAL AREA AT CVRDE AVADI CHENNAI
2026_MES_763878_2
83247
Open Tender
Civil Works
Item Rate
365 days
AVADI CHENNAI
Class B category a(i)
7 documents required · 7 mandatory
₹1,000
ASSISTANT GARRISON ENGINEER I RND AVADI CHENNAI
₹1.9 L
Yes
17 Sept 2026
16 Jul 2026
24 Aug 2026
16 Jul 2026
20 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete (unreinforced) in manually / by mechanical means of nominal concrete 1:3:6 or richer mix (including equivalent design mix) including disposal of material within 50metres lead complete all as specified and directed. | 29 | CUBIC METRE | - | - |
| - | M&L of 62mm thick cement concrete flooring with concrete hardener topping, under layer 50mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kgs of cement or as per manufacture’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc., complete all as specified and directed. | 158 | SQUARE METRE | - | - |
| - | M&L for 3mm thick epoxy medium duty flooring of any shade consisting of following: -
Preparation of surface by scarifying the concrete surface to remove all oil, grease, paint or any other foreign particles and ensure complete adhesion of the coating to base floor using floor griding with vaccumiser. the concrete surface shall have a rough clean, dust free before application of high compressive strength epoxy flooring complete all as specified and directed. | 158 | SQUARE METRE | - | - |
| 3.01 | Providing and applying two component primer CIPOXY 11 (100 microns) of CIPY or equivalent of FOSROC/BASF on the prepared surface by brush / roller covered and sealed evenly on entire surface and allow for 4-5 hours curing. Applying two components CIPOXY-90 (in combination with graded aggregates, offers the highest compressive strength, greater than 100 MPa among the epoxy screed) mortar in the ratio 2:1 and mixed with 2.5 parts of Silica Quartz in a powder mixture to achieve homogenous and applied & levelled by trowelling to form a monolithic layer to a thickness of 1900microns and allow curing for 4-5 hours complete all as specified and directed. | - | - | - | - |
| 3.02 | Self leveling EPU top coat with CIPOTHANE SL 1000 of CIPY or equivalent of FOSROC/BASF at a specified ratio and levelled by trowelling to a thickness of 1000 micron and spike roller is applied for de-aeration. The entire top coat has to be dried for 24 hours before loading complete all as specified and directed. | - | - | - | - |
| - | M&L for Yellow or White (Aisle) band 75mm marking with 2 component Polyurethane resin + hardener with fluorescent (FK-666) on applied EPU flooring complete all as specified and directed.
Note for Sl item No. 3 & 4: Equivalent construction chemical of other specified makes can also be used. | 63 | RUNNING METRE | - | - |
| - | Earth work in excavation for all kind of soil by mechanical means (hydraulic excavator) / manual means over areas including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m complete all as specified and directed. | 11 | CUBIC METRE | - | - |
| - | Moorum / red bajri filling in floors or pavings, laid in layers not exceeding 15cm thick, spread, levelled and rammed including watering complete all as specified and directed. | 9 | CUBIC METRE | - | - |
| - | M&L for P.C.C with 1:4:8 type D2 (40mm graded stone aggregate) filing in as mass concrete complete all as specified and directed. | 2 | CUBIC METRE | - | - |
| - | M&L for P.C.C with 1:2:4 of 40mm thick using 20mm graded stone aggregate laid as levelling course complete all as specified and directed. | 12 | CUBIC METRE | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tender83247.pdf
Tender Documents • 1.47 MB
BOQ_872530.xls
BOQ • 0.82 MB
Amendment.pdf
PDF • 0.09 MB
83247Postponement.pdf
PDF • 0.18 MB
83247Postponement.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .