Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | -37.60% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹21,845.45 (8.78%)Admitted-Finance NEW THEED HARWAN SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | -32.12% | ₹2.7 L+₹21,845.45 (8.78%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹49,790.08 (20.0%)Admitted-Finance | -25.11% | ₹3.0 L+₹49,790.08 (20.0%) | L3 | Admitted-Finance |
| 4 | L4₹3.4 L+₹94,078.93 (37.8%)Admitted-Finance | -14.00% | ₹3.4 L+₹94,078.93 (37.8%) | L4 | Admitted-Finance |
Tender Value
₹4.0 L
EMD Value
₹7,973
Closing Date
10 Sept 2026, 6:00 pmClosed
Divisional Forest Officer Urban Forestry Division
Office of the Divisional Forest Officer Urban Forestry Division Srinagar, Forest Complex, Sheikh Bagh, Srinagar, Kashmir, Jammu and Kashmir
Construction of retaining wall around the Dignibal Guard Hut
2026_FD_322427_1
e-NIT NO 06 OF 2026-27 (Urban Forestry Division)
Open Tender
Civil Works
Percentage
30 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Centralized Pooling Account No. 0110010200001102
₹7,973
19 Sept 2026
26 Aug 2026
11 Sept 2026
26 Aug 2026
10 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soils | 6.75 | cum | 256.85 | ₹1,733.74 |
| 2 | P/L dry Stone Soling duly hand packed & consolidated with hand rammers incl.all carriage leads and lifts complete Job. | 2.25 | cum | 1,000 | ₹2,250 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry | 39 | cum | 7,677.35 | ₹2,99,416.65 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, including curing but excluding the cost of centering, shuttering, finishing and reinforcement.- All work upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.25 | cum | 7,788 | ₹17,523 |
| 5 | Providing and fixing of plywood 6mm thick with all necessary fittings and fixtures complete job. | 46.46 | sqm | 600 | ₹27,876 |
| 6 | Engagement of unskilled labour for clearing site of work. | 7 | no | 650 | ₹4,550 |
| 7Carriage of materials | |||||
| 7.1 | Sand / agg. 10 km | 6 | cum | 279.04 | ₹1,674.24 |
| 7.2 | Stone 10 km | 39 | cum | 328.31 | ₹12,804.09 |
| 8Carriage of materials by manual means Head-load | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_1080682.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .