Tender Value
₹16.1 L
EMD Value
₹16,500
Closing Date
11 Sept 2024, 3:00 pmClosed
Panchayat Union Office Vellakovil
Block Development Officer Vp Panchayat Union Office Vellakovil
Strengthening to the Road From Moothampalayam Primary Agri co-oparative bank Karundevi gounden pudur road to Sellappam palayam road (via) Pillayar kovil Km 0/0-2/2 (R 311) H/O Velampalayam Working Reach Km 0/9-1/670
2024_RDTN_478496_1
Roc No 1141/2023/A3 Dt 24.11.2023
Open Tender
Civil Works - Roads
Item Rate
90 days
Panchayat Union Office Vellakovil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16,500
Yes
Panchayat Union Office Vellakovil
19 Sept 2024
29 Aug 2024
11 Sept 2024
29 Aug 2024
11 Sept 2024
29 Aug 2024
5 Sept 2024
Amount
Strengthening to the Road From Moothampalayam Primary Agri co-oparative bank Karundevi goundn pudur road to Sellappam palayam road (via) Pillayar kovil Km 0/0-2/2 (R 311) H/O Velampalayam (Working Reach Km 0/9-1/670)
Clearing the Light jungle including all labour charges for burying and burning etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS 20 A
Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders
Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Providing arid erecting Single sided Double Guard Metal Beam Crash Barrier System 1.7Om high, comprising of 3mm thick wall "W" beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/ 360 and dip galvanized having Zinc Mass of 550gms / sqm, minimum 95Omm above road/ ground level fixed on ISMC series channel vertical post l50x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800rnm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS: 1367 clause 4.60 all complete as per Technical Specification arid as directed by the Engineer-in-charge
Provision for Km stone
Provision for Hm stone
Provision for Scheme Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S.SIVASATHYAMOORTHY (BID ID -1133960)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .