Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
9 Dec 2020, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/MADURAI
EWE concreting RCC retaining wall bay extension in Sembatty 230 KV SS.
2020_EB_186645_1
SE-GCC-MDU SPEC.NO.037/2020-21
Open Tender
Civil Works
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹18,000
Yes
18 Jan 2021
2 Dec 2020
10 Dec 2020
2 Dec 2020
9 Dec 2020
2 Dec 2020
Amount
Earthwork excavation in hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth earth mixed with small size boulders and hard gravelly soil with initial lead of 10m and lift of 2m in hard stiff clay,black cotton hard red earth.shales.murram,gravelstoney earth and mixed with small size boulders for foundation
Earthwork excavation in hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth earth mixed with small size boulders and hard gravelly soil with initial lead of 10m and lift of 2m in SDR not requiring blasting
Supplying and filling of river sand in SS area for fire prvention materials as per standard specification including cost of all materials lead lift etc complete.
PCC 1:4:8 using 40 mm metal for foundation including cost of all labour materials lead lift curing etc complete.
RCC 1:1.5:3 using 20 mm metal for RAFT foundation without form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.
RCC 1:1.5:3 wall using 20 mm HBG metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete.-Upto Ground level
RCC 1:1.5:3 wall using 20 mm HBG metal withformwork including cost of all materials, cement, all labour, lead, lift, etc. complete.- Above Ground level
Refilling with excavated earth including cost of all, labour, lead, lift etc complete.,
Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete.
Plastering CM 1:3 12mm thick including cost of all materials,curing, all labour charges, lead, lift, etc. complete.
Supplying and filling of 20 mm metal in the yard including cost of all materials, labour charges, lead, lift, etc complete.
Colour Washing Two coats with exterior emulsion paint over one coat of emulsion primer.
Providing , RTS Reinforcement for RCC works including cost of binding wire including cost of all materials, labour charges, lead, lift, etc complete
Supplying and filling of Gravel in yard and SS area including transport, loading, unloading, stacking to departmental gauge for premearsurement , spreading ,watering, consolidation ,labour,lead,lift, etc., copmplete.
RCC 1:1.5:3 mix using 20 mm metal for cover slab and side walls for Road Crossing Duct
Supplying and fixing in position of GI angle 50x50x5 mm of required length for fixing in the cable duct as per the direction of Engineer in site including cost of all labour lead,lift,etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
K.SARAVANAKUMAR
V.KARUPPIAH CONTRACTOR
MAHARAJA CONSTRUCTION
S.PANDIYAN
J SETHURAMALINGAM
SADAIYANDI
GANAPATHY AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .