Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹92.4 LAdmitted-Finance | -45.86% | ₹92.4 L | L1 | Admitted-Finance |
| 2 | L2₹93.2 L+₹80,203 (0.87%)Admitted-Finance | -45.39% | ₹93.2 L+₹80,203 (0.87%) | L2 | Admitted-Finance |
| 3 | L3₹94.1 L+₹1.7 L (1.81%)Admitted-Finance | -44.88% | ₹94.1 L+₹1.7 L (1.81%) | L3 | Admitted-Finance |
| 4 | L4₹1.0 Cr+₹10.4 L (11.3%)Admitted-Finance | -39.75% | ₹1.0 Cr+₹10.4 L (11.3%) | L4 | Admitted-Finance |
| 5 | L5₹1.1 Cr+₹15.3 L (16.6%)Admitted-Finance | -36.88% | ₹1.1 Cr+₹15.3 L (16.6%) | L5 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
6 Aug 2026, 3:00 pmClosed
DD/HD-5/DDA
Horticulture Division-5, Rohini, Sector-10
Name of work Mo Completed Scheme under N. Ac II Hort. Zone. RSP 80 mtr wide road, Sector 21 to 23, Rohini RSP, Sector 21, Rohini. RSP 28 mtr wide road, Sector-22, Rohini. RSP 28 40 mtr wide road, Sector 23, Rohini. RSP 28 mtr wide road, Sector 24, R
2026_DDA_919811_1
23/DD/Hort.-V/DDA/2026-27
Open Tender
Agricultural or Forestry
Percentage
60 days
Horticulture Division-5, Rohini, Sector-10
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹3.4 L
17 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
6 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). | 74 | Cum | 803.75 | ₹59,477.5 |
| 2 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m. lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). | 431.5 | Cum | 667.1 | ₹2,87,853.65 |
| 3 | Digging of holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2: 1 by volume (2 part of stacked volume of earth after reduction by 20 %: 1 part of stacked volume of manure after reduction by 8% flooding with water dressing including removal of rubbish and surplus earth .if any with all leads and lift (cost of manure. sludge or extra good earth if needed to paid for separately).
Holes 45 cm dia and 45 cm deep | 19,190 | Each | 20.65 | ₹3,96,273.5 |
| 4 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately). | 720 | Cum | 339.85 | ₹2,44,692 |
| 5 | Pruning, trimming, shaping of trees /shrubs (ht 15 feet and above) i/c removal of cut materials upto 50 mt. lead and as per direction of officer in charge (necessary T&P shall be arranged by the contractor). | 5,677 | Per tree | 122.35 | ₹6,94,580.95 |
| 6 | Painting of mature trees with Geru and Samosam of approved brand and manufacture to give an even shade.
(Two or more coats on new work) | 3,036 | Per tree | 36.95 | ₹1,12,180.2 |
| 7 | Supplying and stacking of Polyalthia pendula (Ashok Pendula) height 180-195 cm. in gunny bag size 30 cm as per direction of the officer-in-charge. | 5,028 | Each | 108.35 | ₹5,44,783.8 |
| 8 | Supplying and stacking of Bauhinia purpurea (Kachnar) height 150-165 cm. in poly bag size 25 cm as per direction of the officer-in-charge. | 250 | Each | 54.15 | ₹13,537.5 |
| 9 | Supplying and stacking of Cassia fistula (Amaltash) height 120-135 cm. in poly bag size 25 cm as per direction of the officer-in-charge. | 350 | Each | 69.8 | ₹24,430 |
| 10 | Supply and stacking of Dendrocalamus strictus (Lathi Bamboo) of ht. 150-180 cm in HDPE bags at site. | 800 | Each | 120 | ₹96,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
17064332NIT.pdf
Tender Documents • 2.12 MB
BOQ_966621.xls
BOQ • 0.33 MB
TC23.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .