Loading…
Loading…
Tender Value
₹1.1 L
EMD Value
₹3,240
Closing Date
30 Sept 2026, 3:00 pm3d left
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Const of Culvert NR Mohd Ramzan Wani W7 Diver A
2026_RDPR_325985_17
NIT NO 126 OF 2026-27 ADF GEN
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹3,240
25 Sept 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
25 Sept 2026 - 25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: For all kinds of soil | 2.7 | Cum | 479.3 | ₹1,294.11 |
| 2 | P/l of stone soling including all carriages.by MT10km Avg Lead | 1.8 | Cum | 1,000 | ₹1,800 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:4:8 using 40mm nominal size aggregate | 0.5 | Cum | 5,202.9 | ₹2,601.45 |
| 4 | Providing & laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level(1:3:6 coarse sand 20mm nominal size stone agg.). | 5.3 | Cum | 5,733.6 | ₹30,388.08 |
| 5 | Providing and laying in position (CAS- IN- SITU) specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.06 | Cum | 7,104.3 | ₹21,739.16 |
| 6 | Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 310 | Qntl | 115.35 | ₹35,758.5 |
| 7 | Centering and Shuttering etc and removal of formwork etc | 17.7 | Sm | 576 | ₹10,195.2 |
| 8 | Carriage of Materials by MT Graded Sand /Coarse Agg (Crusher ) for an avg lead 25 km | 9.06 | Cum | 465.14 | ₹4,214.17 |
| 9 | Add Provision for CIB<Photographs as directed by Engineer incharge. | 1 | No. | 500 | ₹500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_1102174.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .