| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.7 LAccepted-Finance | ₹9.7 L | 1 | Accepted-Finance Accepted |
| 2 | 2₹9.8 LRejected-Finance | ₹9.8 L | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SUBRAMANIAN CONTRACTOR L2 | NANDHU CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 10 | m3 | 120 ₹1,200 | 110 ₹1,100 |
| 2.00 | Conveyance of excavated soil to a distance of 0 to 2 km away from the site cost including all costs etc as directed by the deparmental officers and standard specifications | 8 | m3 | 56 ₹448 | 56 ₹448 |
| 3.00 | Supplying and filling in foundation, basement, etc with Crushed Stone Sand (M- Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 4 | m3 | 293 ₹1,172 | 293 ₹1,172 |
| 4.00 | Supplying and filling with GRAVEL from approved quarry, filling by layers in foundation and basement of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 4 | m3 | 330 ₹1,320 | 330 ₹1,320 |
| 5.00 | Cement Concrete 1:4: 8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm ISS gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 6 | m3 | 5,503 ₹33,018 | 5,503 ₹33,018 |
| 6.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 4 3/8"X 2 3/4" for foundation and basement cost including finishing, curing, etc., complete complying with standard specification. | 7.3 | m3 | 7,577 ₹55,312.10 | 7,577 ₹55,312.10 |
| 7.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and as directed by the departmental officers. | 3 | m2 | 326 ₹978 | 326 ₹978 |
| 8.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 152 | Kgs | 100 ₹15,200 | 91.8 ₹13,953.60 |
| 9.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 3.8 | m3 | 8,605 ₹32,699 | 8,605 ₹32,699 |
| 10.00 | Supplying and laying in flooring with fully polished Jet Black colour Granite stone of 20mm thick (average) of Super Fine Polished with Machine Cut Edges) of sizes 4'x2' and above 18mm to 20mm thick laid over base layer of cementmortar 1:3 (one cement and three Plastering sand) - 20 mm thick and applying cement slurry &pointed with white cement and colour pigments to the colour of stones and polished neatly as directed by the deparmental officers | 61 | m2 | 2,800 ₹1.7 L | 2,735 ₹1.7 L |
Tender Value
₹9.8 L
EMD Value
₹9,800
Closing Date
4 Feb 2026, 3:00 pmClosed
THE COMMISSIONER UDUMALPET MUNIICPALITY
THE COMMISSIONER UDUMALPET MUNIICPALITY
Construction of platform and shed for Sri Mariyamman koil ancient car at Old Municipal office west front side SEMMOZHI PARK area in Udumalpet Municipality
2026_MAWS_649804_1
1736/2024/E1
Open Tender
Civil Works - Others
90 days
UDUMALPET
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,800
13 Apr 2026
2 Feb 2026
5 Feb 2026
2 Feb 2026
4 Feb 2026
2 Feb 2026
2 Feb 2026 - 4 Feb 2026
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Conveyance of excavated soil to a distance of 0 to 2 km away from the site cost including all costs etc as directed by the deparmental officers and standard specifications
Supplying and filling in foundation, basement, etc with Crushed Stone Sand (M- Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and filling with GRAVEL from approved quarry, filling by layers in foundation and basement of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Cement Concrete 1:4: 8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm ISS gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 4 3/8"X 2 3/4" for foundation and basement cost including finishing, curing, etc., complete complying with standard specification.
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and as directed by the departmental officers.
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Supplying and laying in flooring with fully polished Jet Black colour Granite stone of 20mm thick (average) of Super Fine Polished with Machine Cut Edges) of sizes 4'x2' and above 18mm to 20mm thick laid over base layer of cementmortar 1:3 (one cement and three Plastering sand) - 20 mm thick and applying cement slurry &pointed with white cement and colour pigments to the colour of stones and polished neatly as directed by the deparmental officers
Structural Glazing: Providing and fixing structural glazing fabricated from roll formed sections made of galvanized steel colour coated (Base steel as per IS 513 of ‘D’ quality, galvanized as per IS 277 with Zinc of 120 grams / sqm.) with total coated thickness of 0.72mm. The glass holding section made of 304 grade SS of 0.6mm thick.Galvanized steel sections are to be used as stiffeners inside the colour coated steel / powder coated sections as per the design equirement. Design calculations are made to suit wind pressures as given in IS 875. Paint specifications: Primer coat with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12- 16 microns thick and back coated with alkyd backer of 5-7 microns or powder coated with pure polyester powder upto 50-60 microns thick. Dimensions: The section should be of 37 x 53mm for frame vertical, 37 x 53mm for frame horizontal section and section for reinforcement should be of 31 x 55mm. glass holding section should be of 37 x 37mm for top and bottom grids in between should be of 37 x 18mm. Accessories: Brackets made of CRCA powder coated / electro plated should be used to fix vertical at top and bottom and vertical to slab as per site requirement. Polyurethane brackets should be used to connect horizontal section to vertical sections. Silicone: Natural cure, with good UV resistance to be used. The above frame should be fixed to brick / concrete masonry by using nylon self–expanding cap and driving MS electro plated 80mm long screws into the caps through frames. Glass: 5mm reflective Cost including all costs etc., complete as per standard specification and as directed by the departmental officers etc., complete.
Fabricating supplying and fixing of pre painted galvanium colour sheets with the following specification. The materials should be of PPGI tile profile with a red colour or any other approved design 0.47 mm thick 24 guage having width 1050 mm. The sheet should be G.I.base pre painted hot dipped galvanized iron sheet and to be fixed with shelf tapping screws,plastic washer.The washer and screws to be fixed by using minute power machine drilled with out damaging the sheets paint coating to be regular modified polyster coat with zinc coating of Z 120 GSM paint thickness the finish should be terra cotta finish like malabar mangalore tiles finish optional matt finish. The sheet to be fixed with making suitable corrugated,cutting the sheet in to the required ssize and making ornamental designs as per the site condition and as directed by the departmental officers.
Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification
Supplying and fixing of Chain Link 2 x 2 using 10 Gauge Galvanised Iron Wire fencing cost including all material, labour, cutting and welding charges etc., complete as per standard specifications.
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour of enamel paint cost including cost of all materials, labour charges etc., complete complying with standard specification
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.33 MB
BOQ_779062.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid