Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.2 LAccepted-AOC | L1 | Accepted-AOC LER | |
| 2 | L2₹28.3 L+₹3,517.80 (0.12%)Rejected-Finance | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Kannan Construction L1 | GAJENDIRA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from Mutharasampoondi to Shozhavaram Via Kilpotarai Road Km 0/0 - 0/540 R430 | |||||
| 1.10 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 648 | Sq.m | 5.75 ₹3,726 Lowest | 7 ₹4,536 |
| 1.20 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications. | 194.4 | cum | 131.25 ₹25,515 Lowest | 132 ₹25,660.8 |
| 1.30 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms | 64.8 | cum | 389 ₹25,207.2 Lowest | 389 ₹25,207.2 Lowest |
| 1.40 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 247.5 | cum | 2,290.1 ₹5,66,799.75 Lowest | 2,290.1 ₹5,66,799.75 Lowest |
| 1.50 | Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | 2,025 | Sq.m | 81.5 ₹1,65,037.5 Lowest | 82 ₹1,66,050 |
| 1.60 | Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat in | 2,025 | Sq.m | 19 ₹38,475 Lowest | 19.5 ₹39,487.5 |
| 1.70 | Providing and Laying Dense Bituminous Macadam (BM) overlay using paver after repairs to cracks and pot holes filing, mixed in hot mix plant of drum type using paving Bitumen 60/70 penetration grade as per IS 73 and percentage of bitumen shall be 4 - 3.5% by weight of total mix aggregates shall conform to grading 1 of table 500 - 4 of clause 507 of MORT&H specifications with all leads and lifts etc., complete and as directed by the Engineer. | 101.25 | Sq.m | 8,825 ₹8,93,531.25 Lowest | 8,825 ₹8,93,531.25 Lowest |
| 1.80 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
per clause 507 of MORTH Rev-5 | 50.63 | cum | 11,370 ₹5,75,663.1 Lowest | 11,370 ₹5,75,663.1 Lowest |
| 1.90 | Road Marking with Hot Applied
Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface | 108 | Sq.m | 890 ₹96,120 Lowest | 890 ₹96,120 Lowest |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
10 Feb 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Tiiruvannamalai
DRDA, Tiruvannamalai
Strengthening of the road from Mutharasampoondi to Shozhavaram Via Kilpotarai Road Km 0/0 - 0/540 R430 in Thurinjaupram Block Package No.TVM/2024-25/112 under Mines fund
2025_RDTN_521726_1
A13-1/7088/2024 Date.25.01.2025 112
Open Tender
Civil Works - Roads
Item Wise
90 days
Thurinjapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,000
8 Dec 2025
30 Jan 2025
10 Feb 2025
30 Jan 2025
10 Feb 2025
30 Jan 2025
Amount
Strengthening of the road from Mutharasampoondi to Shozhavaram Via Kilpotarai Road Km 0/0 - 0/540 R430
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat in
Providing and Laying Dense Bituminous Macadam (BM) overlay using paver after repairs to cracks and pot holes filing, mixed in hot mix plant of drum type using paving Bitumen 60/70 penetration grade as per IS 73 and percentage of bitumen shall be 4 - 3.5% by weight of total mix aggregates shall conform to grading 1 of table 500 - 4 of clause 507 of MORT&H specifications with all leads and lifts etc., complete and as directed by the Engineer.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface
Providing HM stones
Provision for Citizen Information Board cum Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
GAJENDIRA CONSTRUCTION (BID ID -1246518)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .