Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
25 Aug 2026, 2:15 pm
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
90 days
Expenditure
General
P6
2 conditions · 1 needing a document upload
EC IS APPLICABLE TO EACH ITEM OF THE TENDER SEPARATELY For Regular Order: Bulk procurement will be made from the firms who have supplied the tendered item or similar item, individually or as components of kits/assemblies, to ICF/RCF/MCF: 1.to the extent of 20 Percent of the tendered quantity against a single regular purchase order during the last three previous financial years and the current financial year up to the date of opening of tender or minimum 50 coach sets in past, whichever is higher. (OR) 2.to the extent of 35 Percent of the tendered quantity against multiple purchase orders (all types of orders) during the last three previous financial years and the current financial year up to the date of opening of tender or minimum 50 coach sets in past, whichever is higher. Documents to be submitted for compliance of EC - Firm has to submit summary statement of past supply performance of same/ similar items duly indicating PO details, item description, quantity supplied and date of supply duly enclosing the proof of supply to ICF/RCF/MCF in the form of PO copies along with Inspection Certificate/R-Notes.The responsibility to upload proof of supply rests solely and entirely with the tenderer. However, purchaser reserves the right to utilize the record of supplies made to ICF, if readily available. 50 Coach sets = 100 Numbers (for both PL Nos 33619438 & 33619440) For Developmental order: Other sources {past suppliers of same/similar items who are not eligible for Bulk order and new / untried sources} can be considered for placement of developmental order for the quantity up to 20 Percent of the NPQ: 1.Past suppliers who are not eligible for regular order can be considered for placement of developmental order provided they should submit along with their offer, PO copies along with receipt notes/ inspection certificate/work completion certificate of same (or) similar item to ICF/RCF/MCF/Zonal Railways.The responsibility to upload proof of supply rests solely and entirely with the tenderer. However, purchaser reserves the right to utilize the record of supplies made to ICF, if readily available. 2.New /untried sources can be considered for Limited Quantity Developmental orders provided they should submit along with their offer details of available M&P along with statement of clause-wise compliance of STR MDTS 26001 REV 04. Such tenderers are to note that non submission of such documents shall be taken as they are not having capacity/capability of manufacturing tendered item, and their offer is liable to be rejected and no back reference in this regard will be made. (SIMILAR ITEM MEANS RETENTION TANK (minimum 300 L volume capacity) OF LHB , Vande Bharat and MEMU COACHES or Underslung WATER TANK (capacity 400 L and above) OF LHB , Vande Bharat and MEMU COACHES.)
As per Public procurement (Preference to Make in India) order 2017, as amended, tendered item is to be procured from Class-I Local Suppliers only and the vendors who do not qualify to be Class-I Local Suppliers should not quote in the tender as their offers shall not be considered for any ordering.
63 conditions · 5 needing a document upload
In case of indigenous bidders, whether you are Large scale Industry or consortia of MSEs formed by NSIC, if yes, have you indicated quantum of sub contracts given to Micro and Small Enterprises (in percent of order value)?
Have you gone through the Eligibility Criteria and submitted all the documents mentioned therein?
Have you submitted the EMD or claimed exemption duly uploading documentary evidence in support of your claim along with Bid securing declaration as per clause 6.1 of section-I of Instructions to Tenderers of ICF Bid Document.
Have you confirmed for compliance of Public Procurement orders of Department of Expenditure regarding countries sharing land border with India?
Have you furnished the statement of Equipment & Quality Control?
Have you furnished tender specific letter of authority (if manufacturer has not quoted directly) to bid on behalf of manufacturer as per Annexure-II of ICF bid document.
Have you kept your offer valid for the validity period as mentioned in NIT header?
Have you submitted the details of location(s) at which local value addition is made /proposed?
Have you submitted self-declaration with respect to non-debarment under any provisions of DPIIT rules?
Have you submitted translated copy into English, for all documents in language other than English and all such documents should be signed by the authorised translator and notarized in India?
Have you submitted declaration for passing on the input tax credit as per para 2.8 and 2.9 of section-II of ICF Bid Document.
Have you submitted authenticated copy of the document authorizing the signatory to submit offer and commit on behalf of tenderers?
New/Untried sources , Have you complied clause wise compliance of STR?
1)INSTALLATION & COMMISSIONING REQUIRED AS PER ASSEMBLY DRAWING & ANNEXURE - A TO BE FOLLOWED. 2)SUPPLY RATES & INSTALLATION RATES TO BE QUOTED SEPARATELY. 3)WHERE EVER CDE/RCF APPEARS IN THE SPECIFICATION IT SHOULD BE READ AS CDE/ICF. 4)ITEM SHALL BE OFFERED FOR PROTO TYPE INSPECTION BY DESIGN DEPARTMENT OF ICF BEFORE TAKING UP BULK MANUFACTURE.TO TAKE CARE OF CUSTOMER AND MAINTENANCE REQUIREMENTS, MINOR DESIGN CHANGES WHILE MANUFACTURING AND DURING FITMENT MAY BE THERE WHICH WILL HAVE TO BE ACCOMMODATED.SUPPLIER HAS TO INCORPORATE THESE CHANGES WITH OUT ADDITIONAL COST. THESE CHANGES SHALL BE IMPLEMENTED WITH THE APPROVAL OF DESIGN/ICF DURING BULK SUPPLY.. 5. PACKING CONDITION AS PER RCF PACKING CONDITION PI-100, VER.1.0 6)FIRM HAS TO FOLLOW ATTACHED SPECIAL CONDITION FOR S & I CONTRACT. 7.SPECIAL CONDITION IMPLEMENTATION PROCEDURE SHALL BE AS PER ANNEXURE-I AND STANDARD MONITORING FORMAT SHALL BE AS PER ANNEXURE-II. 8.FIRM SHALL SUBMIT THE UNDERTAKING FOR S & I CONTRACT AS PER ENCLOSED FORMAT. 9.PERMISSIBLE TIME FOR COMPLETION OF S & I OF BIO TANK & APPLICABLE PENALTIES SHALL BE AS PER ICF/F/IMS/FM/30/S & I 33623375.
Public Procurement (Preference to Make in India) policy is applicable as per Clause 16 of Section-I of ICF Bid Document.The procurement shall be done in accordance with the extant instruction of DPIIT (Department of Promotion of Industry and Internal Trade) for Make in India policy.
The bidders shall be required to provide a self- certificate for the local content at the time of tendering. However, at the time of execution of the contract, a certificate from the statutory auditor or cost auditor of the company (in the case of companies) or from a practising cost accountant or practising chartered accountant (in respect of suppliers other than companies) giving the percentage of local content shall be provided. Please refer clause 16.1.3 and 16.1.4 of section-I of Bid document for further details and Annexure VII of Bid document for the format of Certificate of local content.
The certificate for local content shall have valid UDIN and Purchaser reserves the right to verify the authenticity of CA certificate from the following links. a.For Chartered Accountants - https://udin.icai.org/search-udin b.For Cost Accountants - https://elcmal.in/udin/VerifyUDIN.aspx c.For Company Secretaries - https://stimulate.icsi.edu/udin/Home/UDINVerification
EARNEST MONEY DEPOSIT(EMD):- (i). Regarding EMD, please refer to clause 6.1 of section I Instructions to tenderer of ICF Bid Document attached to the tender. Tenderers seeking exemption from payment of EMD must upload the requisite documentary evidence in support of their claim for exemption from payment of EMD along with the offer. (ii). Traders/distributors/sole agent/works contract are not exempted from payment of EMD as they are excluded from the purview of the MSE policy. (iii)In reference to condition No.6.1(vi) of section I of ICF Bid Document, the exemption of EMD is applicable only to the vendors having current and valid registration with Zonal Railways/Production Units of the trade Group 3039, 3045, 3046,3047, 3329. Firm should submit valid registration certificate for proof.
(i) In case of MSE firm willing to claim the benefits under Public Procurement Policy (Preference to MSE) order 2012, the firm should upload with their offer, the proof of their being MSE registered with the agency mentioned in clause 13.1 of section-I of ICF Bid document, failing which such offers will not be liable for consideration of benefits detailed in para 13.3ofsection-IofICFBiddocument. (ii) As per Gazette notification no. S.O.4926(E) dated 18.10.2022 amending notification no. S.O.2119(E) dated 26.06.2020 circulated vide Railway Board letter no. 2020/RS(G)/363/1 dated 03.11.2022 regarding re-classification of enterprises and Udyam registration, In case of an upward change in terms of plant and machinery or equipment or turnover or both, and consequent reclassification, an enterprise shall continue to avail of all non-tax benefits of the category it was in before the re-classification, for a period of three years from the date of such upward change. In such cases, the tenderer claiming such benefits shall submit necessary documentary evidence along with offer. (iii) Tenderers shall upload Udyam Registration detail showing that the enterprise is owned by Scheduled Castes (SC)/ Scheduled Tribes (ST)/ women entrepreneurs to claim the benefit under this sub classification.
The bidders should quote the applicable HSN codes and it is the responsibility of the tenderer to quote the correct HSN code and upload the document.
Goods & Services Tax (GST): Will beapplicableas per Clause 2.0 and all sub clauses of Section-II of ICF Bid Document.
Passing the benefits of ITC: I here by confirm following: We hereby declare that in quoting the above price, we have taken into account the full effect of Input Tax Credit available under GST. We, further agree to pass on any financial gain/benefit as may become available in future in respect of all the input tax credit on the date of supply by way of reduction in price and advise the purchaser accordingly. We also undertake that we are aware of the provisions of section 171 of the CGST Act and consequences thereof if we fail to comply with the same.
This tender is for Supply & Installation. Firm should quote supply rates & installation rates separately.
It will be presumed that the firms who have submitted thee-bid have gone through and accepted all the terms and conditions of tender, until and unless firms specify the deviations from those conditions and so indicated specifically, under the headings Technical Deviation Statement and Commercial Deviation Statements. And if space available is not adequate, tenderers can upload a Statement of Deviations and a reference of uploaded deviation statement shall be given in Technical or Commercial Deviation Statement. If there is any contradiction between any techno commercial terms and conditions quoted in e-offer and documents attached along with the e-offer, the terms & conditions quoted in e-offer will prevail over that of quoted in attached documents. Tenderers in their own interest are advised not to quote any techno commercial terms & conditions in attached documents.
Please submit the details of the location at which the local value addition is being made.
IT IS CERTIFIED THAT THE ITEM OFFERED MEETS THE LOCAL CONTENT REQUIREMENT FOR CLASS-I LOCAL SUPPLIER.
The tenderers shall indicate the details of their Jurisdictional Assessing Officers (Designation, address & email id) for GST.
For the purpose of allotment being JIT Item, firm to inform their maximum monthly rate of supply while submitting offer, failing which firm has to supply quantity allotted by ICF.
For the purpose of allotment being JIT Item, firm to inform lead time required by them for supplying monthly rate of quantity, failing which firm has to supply as per lead time decided by the ICF.
PRICE VARIATION CLAUSE APPLICABLE AS PER ATTACHED DOCUMENT
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
2 conditions
Validity of Offer: No deviation from the offer validity period stipulated in the NIT header of this tender document is permitted. For additional conditions please refer Clause 12.0 of Section -I of ICF Bid Document.
Price Variation Clause: Applicable as per Tender document or annexure attached. Please refer Clause 1.3 of Section - II of ICF Bid Document. No deviation from the Price Variation Clause as stipulated in this Tender document or annexure to the tender document is permitted.
1 location across Tamil Nadu · 4,127 Numbers total
S&I OF BOLTED DESIGN BIO TANK LHB (LH & RH)
06261499~ICF
06261499
Open - Indigenous
Goods
Chennai, Tamil Nadu
₹0
₹50 L
4 Aug 2026
4 Aug 2026
2 items · 4,127 Numbers total
SUPPLY AND INSTALLATION OF RETENTION TANK WITH S-TRAP & WITHOUT PRESSURISED FLUSHING ( RH) TO DRG.No.329-6-3-352, ALT-NIL AND AS PER SPECN. MDTS-26001, REV04 (EXCEPT CLAUSE 3.5 - PRESSURISED FLUSHING SYSTEM) [ Warranty Period: 84 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| FURNISHING DEPOT/ICF,Chennai, ICF | Tamil Nadu | 2047.00 Numbers |
| Total | 2,047 Numbers | |
SUPPLY AND INSTALLATION OF RETENTION TANK WITH S-TRAP & WITHOUT PRESSURISED FLUSHING ( LH) TO DRG. No.329-6-3-346, ALT-NIL AND AS PER SPECN.MDTS-26001, REV04 (EXCEPT CLAUSE 3.5- PRESSURISED FLUSHING SYTSEM). [ Warranty Period: 84 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| FURNISHING DEPOT/ICF,Chennai, ICF | Tamil Nadu | 2080.00 Numbers |
| Total | 2,080 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5672703.pdf
ATTACHMENT
5672711.pdf
ATTACHMENT
5846793.pdf
ATTACHMENT
5863346.pdf
ATTACHMENT
5863373.pdf
ATTACHMENT
5863350.pdf
ATTACHMENT
5863356.pdf
ATTACHMENT
5863370.pdf
ATTACHMENT
5863348.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].