Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 CrAccepted-AOC 59 B RAJA RAM MOHON ROY SARANI KUMIRJALA ROAD SERAMPORE HOOGHLY 712203 | SERAMPORE | HOOGHLY | WEST BENGAL | 712203 | ₹15.7 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹16.4 CrRejected-AOC 7G CORNFIELD ROAD KOLKATA 700019 | PASCHIM BARDHAMAN | WEST BENGAL | 713305 | ₹16.4 Cr | L2 | Rejected-AOC L2 Bidder |
| 3 | L3₹16.4 CrRejected-Finance BIBIGRAM SOUTH NEAR JALALIA GIRLS HIGH SCHOOL MALDA ENGLISHBAZAR 732101 | ENGLISHBAZAR | MALDA | WEST BENGAL | 732101 | ₹16.4 Cr | L3 | Rejected-Finance REJECTED |
| 4 | L4₹16.9 CrRejected-Finance VILL RAMBAGH P O BHAGWANGOLA P S BHAGWANGOLA DIST MURSHIDABAD | BHAGWANGOLA | MURSHIDABAD | WEST BENGAL | ₹16.9 Cr | L4 | Rejected-Finance REJECTED |
Tender Value
Refer Docs
EMD Value
₹32.8 L
Closing Date
25 Apr 2022, 2:00 pmClosed
Engineer, Resources Division PHED
P-16, INDIA EXCHANGE PLACE EXTN. 1ST FLOOR KOLKATA 700 073
Rejuvenation of Amta Water Supply Scheme of Amta-I Block under Howrah Division, PHE Dte
2022_PHED_373443_1
WBPHED/EE/RS/e64/2021-2022
Open Tender
CIVIL WORKS
540 days
Howrah
Please refer Tender documents.
8 documents required · 8 mandatory
₹32.8 L
12 Aug 2022
25 Mar 2022
27 Apr 2022
28 Mar 2022
25 Apr 2022
6 Apr 2022
Sinking of Big dia Rig Bored Tube well 4 nos (300 x 250 mm x 250 mtr) for Zone-I, II & III, Land development of Head work site and 2nd Tube well site , Construction of boundary wall at 2nd Tube well Site (Zone-I), H W Site (Zone-I & III), Laying Distribution System Zone-I, Zone-II and Zone-III , FHTC Zone-I(3227), Zone-II(4732), Zone-III(2022), Construction of Two storied switch room ( 5.4 x 3.6) with water supply & sanitary arrangement cum godown at Head Work site of Zone-I, & Zone-III, Construction of switch room ( 3.60 m x 3.0 m) with water supply & sanitary arrangement at 2nd tube well Zone-I, Construction of 600 Cum OHR 20 mtr Staging Height (Zone-I) with pile foundation including soil test &design of piles, Construction of 400 Cum OHR 20 mtr Staging Height (Zone-III) with pile foundation including soil test & design of piles, Interconnection 2nd Tube Well and First Tube Well ( Zone-I and Zone-III) of Rejuvenation of Amta Water Supply Scheme of Amta-I Block under Howrah Division, PHE Dte
CONCORD ENGINEERING
HANNAN BUILDERS PRIVATE LIMITED
S P CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid