Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-AOC B 2 16 SHREE BHAGWATI NAGAR SUTARWADI ROAD PASHAN PUNE 411 017 | PUNE | MAHARASHTRA | 411017 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹33.2 L+₹1.3 L (3.97%)Rejected-Finance | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹40.0 L+₹8.0 L (25.1%)Rejected-Finance 26 3 BOMBAY PUNE ROAD LAXMI APARTMENT OPP BU BHANDARI SHOWROOM PUNE 411003 | PUNE | MAHARASHTRA | 411003 | L3 | Rejected-Finance Not being Lowest bidder | |
| 4 | L4₹41.0 L+₹9.1 L (28.4%)Rejected-Finance B 134 GANESH MURTHI NAGAR PART III COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L4 | Rejected-Finance Not being lowest bidder | |
| 5 | L5₹41.6 L+₹9.6 L (30.1%)Rejected-Finance | L5 | Rejected-Finance Not being lowest bidder |
| Sl No | Description | Qty | Unit | M/s S.R lahoti L9 | sanjay m. suryawanshi L11 | M/S NILESH BUILDERS L3 | S.K.HARAL L10 | VENKATESHWARA ENTERPRISES L1 | Rays Breakers L6 | M/S.J.V.Datar L12 | AJAY ENTERPRISES L7 | Sunil Constructions L13 | OM GANESH CONSTRUCTION L8 | AMW Construction and developers L2 | DARSHAN ENTERPRISES L5 | SHRI SAI ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as specified and directed. | 345 | Square Metre | 90 ₹31,050 | 81 ₹27,945 | 27 ₹9,315 | 45 ₹15,525 | 90 ₹31,050 | 35 ₹12,075 | 19 ₹6,555 | 40 ₹13,800 | 5 ₹1,725 Lowest | 35 ₹12,075 | 10 ₹3,450 | 100 ₹34,500 | 45 ₹15,525 |
| 2.00 | Supply and fix Plain, galvanished, mild steel sheeting, 1 mm thick in ridges, hips, valley gutters, drip & straight flashings at any height including necessary scaffolding (length & grith as fixed) with grade of zinc coating 275 complete all as specified and directed. | 45 | Square Metre | 1,000 ₹45,000 | 810 ₹36,450 | 1,136 ₹51,120 | 810 ₹36,450 | 1,300 ₹58,500 | 1,220 ₹54,900 | 1,200 ₹54,000 | 650 ₹29,250 Lowest | 900 ₹40,500 | 1,200 ₹54,000 | 900 ₹40,500 | 700 ₹31,500 | 1,200 ₹54,000 |
| 3.00 | Supply and fix Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and directed. | 300 | Square Metre | 1,100 ₹3,30,000 | 990 ₹2,97,000 | 1,023 ₹3,06,900 | 900 ₹2,70,000 | 770 ₹2,31,000 | 1,100 ₹3,30,000 | 1,090 ₹3,27,000 | 800 ₹2,40,000 | 900 ₹2,70,000 | 1,100 ₹3,30,000 | 750 ₹2,25,000 Lowest | 800 ₹2,40,000 | 850 ₹2,55,000 |
| 4.00 | Material and labour for Excavation in post holes (Or similar holes) each not exc 0.5 cum in hard/dense soil getting out removing excavated material n exc 50m and depositing where directed at a level n exc 1.5m above the starting point complete all as specified and directed. | 30 | Each | 200 ₹6,000 | 306 ₹9,180 | 102 ₹3,060 | 99 ₹2,970 | 90 ₹2,700 | 112 ₹3,360 | 80 ₹2,400 Lowest | 300 ₹9,000 | 300 ₹9,000 | 150 ₹4,500 | 250 ₹7,500 | 300 ₹9,000 | 150 ₹4,500 |
| 5.00 | Material and Labour, for PCC (1 : 3: 6 ) type C2 using 40 mm graded stone aggregate as in fdn filling and mass concrete complete all as specified and directed. | 6.48 | Cubic Metre | 5,500 ₹35,640 | 4,680 ₹30,326.4 | 3,599 ₹23,321.52 | 4,500 ₹29,160 | 3,800 ₹24,624 | 3,850 ₹24,948 | 3,500 ₹22,680 Lowest | 5,800 ₹37,584 | 6,500 ₹42,120 | 4,200 ₹27,216 | 3,500 ₹22,680 Lowest | 6,000 ₹38,880 | 6,000 ₹38,880 |
| 6.00 | Supply and fix rolled mild steel work in tubular trusses, post, rafter, purlin etc including special shaped washer etc. complete using ERW or induction butt weleded tubes confirming to IS-4923-1997 YST 310 etc. complete all as specified and as directed. | 3,000 | Kilogram | 150 ₹4,50,000 | 144 ₹4,32,000 | 108 ₹3,24,000 | 153 ₹4,59,000 | 90 ₹2,70,000 Lowest | 115 ₹3,45,000 | 94 ₹2,82,000 | 130 ₹3,90,000 | 120 ₹3,60,000 | 100 ₹3,00,000 | 125 ₹3,75,000 | 130 ₹3,90,000 | 135 ₹4,05,000 |
| 7.00 | Demolition of reinforced concrete of any description and in any position not otherwise sepcifically provided complete all as specified and directed. | 3 | Cubic Metre | 900 ₹2,700 | 900 ₹2,700 | 426 ₹1,278 | 360 ₹1,080 Lowest | 480 ₹1,440 | 460 ₹1,380 | 430 ₹1,290 | 2,000 ₹6,000 | 700 ₹2,100 | 550 ₹1,650 | 500 ₹1,500 | 1,200 ₹3,600 | 850 ₹2,550 |
| 8.00 | Material and Labour for mild steel TMT bars 10mm dia and over cut to length bent to shape required including cranking bending spirally for hoopping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing clip, Complete all as specified and directed by Engineer-in-Charge. | 250 | Kilogram | 100 ₹25,000 | 135 ₹33,750 | 94 ₹23,500 | 153 ₹38,250 | 100 ₹25,000 | 110 ₹27,500 | 90 ₹22,500 Lowest | 105 ₹26,250 | 120 ₹30,000 | 100 ₹25,000 | 95 ₹23,750 | 120 ₹30,000 | 90 ₹22,500 Lowest |
| 9.00 | Material and labour for Precast RCC (1:2:4) type B1 (using 20mm graded stone aggregate), in cover slabs of manholes, open drains inclusive of form work set in CM (1:6) complete all as specified and directed.
(Reinforcement shall be measured and paid separately) | 3 | Cubic Metre | 8,000 ₹24,000 | 7,200 ₹21,600 | 5,493 ₹16,479 | 6,300 ₹18,900 | 5,500 ₹16,500 | 5,900 ₹17,700 | 5,000 ₹15,000 | 7,500 ₹22,500 | 8,000 ₹24,000 | 5,500 ₹16,500 | 4,500 ₹13,500 Lowest | 9,000 ₹27,000 | 9,000 ₹27,000 |
| 10.00 | Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth; for foundation, etc. and getting out soft/loose soil complete all as specified and directed by Engineer-in-Charge. | 150 | Cubic Metre | 900 ₹1,35,000 | 441 ₹66,150 | 379 ₹56,850 | 306 ₹45,900 | 380 ₹57,000 | 410 ₹61,500 | 410 ₹61,500 | 400 ₹60,000 | 450 ₹67,500 | 500 ₹75,000 | 300 ₹45,000 | 400 ₹60,000 | 250 ₹37,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
5 Jun 2026, 6:00 pmClosed
GE RnD Pashan
GE RnD Pashan
REPAIRS TO HARD STANDING, FOOTPATH/APPROACH ROAD, SEWAGE LINE, SEPTIC TANK AT TECHNICAL AREA OF ARDE, JCDA, DSC LINE, GOLE MARKET UNDER AGE B/R PASHAN
2026_MES_765647_1
GERD/PSN/TOKEN/14 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE RnD Pashan
As per tender documents
8 documents required · 8 mandatory
₹500
GE RnD Pashan
₹80,000
Yes
27 Jul 2026
15 May 2026
8 Jun 2026
15 May 2026
5 Jun 2026
29 May 2026
15 May 2026 - 22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as specified and directed. | 345 | Square Metre | - | - |
| - | Supply and fix Plain, galvanished, mild steel sheeting, 1 mm thick in ridges, hips, valley gutters, drip & straight flashings at any height including necessary scaffolding (length & grith as fixed) with grade of zinc coating 275 complete all as specified and directed. | 45 | Square Metre | - | - |
| - | Supply and fix Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and directed. | 300 | Square Metre | - | - |
| - | Material and labour for Excavation in post holes (Or similar holes) each not exc 0.5 cum in hard/dense soil getting out removing excavated material n exc 50m and depositing where directed at a level n exc 1.5m above the starting point complete all as specified and directed. | 30 | Each | - | - |
| - | Material and Labour, for PCC (1 : 3: 6 ) type C2 using 40 mm graded stone aggregate as in fdn filling and mass concrete complete all as specified and directed. | 6.48 | Cubic Metre | - | - |
| - | Supply and fix rolled mild steel work in tubular trusses, post, rafter, purlin etc including special shaped washer etc. complete using ERW or induction butt weleded tubes confirming to IS-4923-1997 YST 310 etc. complete all as specified and as directed. | 3,000 | Kilogram | - | - |
| - | Demolition of reinforced concrete of any description and in any position not otherwise sepcifically provided complete all as specified and directed. | 3 | Cubic Metre | - | - |
| - | Material and Labour for mild steel TMT bars 10mm dia and over cut to length bent to shape required including cranking bending spirally for hoopping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing clip, Complete all as specified and directed by Engineer-in-Charge. | 250 | Kilogram | - | - |
| - | Material and labour for Precast RCC (1:2:4) type B1 (using 20mm graded stone aggregate), in cover slabs of manholes, open drains inclusive of form work set in CM (1:6) complete all as specified and directed.
(Reinforcement shall be measured and paid separately) | 3 | Cubic Metre | - | - |
| - | Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth; for foundation, etc. and getting out soft/loose soil complete all as specified and directed by Engineer-in-Charge. | 150 | Cubic Metre | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_857509.xls
BOQ • 0.62 MB
8707.pdf
Tender Documents • 2.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .