| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20,156Accepted-AOC 2 64 24 1 PONNANDI NAGAR 2ND STREET MUTHIAHPURAM TUTICORIN 628 005 | TUTICORIN | TAMIL NADU | 628005 | L1 | Accepted-AOC L1 | |
| 2 | L2₹22,995+₹1,132 (5.18%)Rejected-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | A. SUDALAIMUTHU CONTRACTOR | PANDIAN ENTERPRISES |
|---|---|---|---|---|---|
| 1.10 | PANELS: Annual Overhauling works of LT 415 V AC Switch gear and DC switchgear of 220V DC & +24V DC Panels Removal of top cover, hylam separators, cleaning and tightness checking of horizontal and vertical bus (front and rear) including in vertical bus in switch gear panels. | 14 | Nos. | 11,550 ₹13,629 Lowest | 12,040 ₹14,207.2 |
| 1.20 | Material Cost (Contractor Scope) Supply of Gada cloth for cleaning the LT Panels 14Nos. | 7 | Mtrs. | 189 ₹223.02 Lowest | 210 ₹247.8 |
| 2.10 | MODULES: Annual Maintenance of LT Modules Removal of modules, external cleaning and tightness checking of terminals, replacement of worn out parts, applying petroleum jelly to finger contacts, greasing of modules and meggering.
Size -1 / F Type Modules: | 2 | Nos | 234 ₹276.12 Lowest | 250 ₹295 |
| 2.20 | Size -2 / D Type Module: | 7 | No. | 1,260 ₹1,486.8 Lowest | 1,400 ₹1,652 |
| 2.30 | Size -3 / K Type Module: | 5 | Nos. | 1,200 ₹1,416 Lowest | 1,325 ₹1,563.5 |
| 2.40 | Material Cost (Contractor Scope) Supply of Gada cloth for cleaning the LT Modules 14Nos. | 1 | Mtr | 27 ₹31.86 Lowest | 30 ₹35.4 |
| 3.10 | Annual Overhauling works of LT 415V AC Switch gear and DC switchgear of 220V DC & +24V DC Panels Removal of the Hylam partition sheet available in front of the vertical bus of the panel both front and rear side and refixing after cleaning in all modules. | 14 | Nos | 1,470 ₹1,734.6 Lowest | 1,610 ₹1,899.8 |
| 3.20 | Material Cost (Contractor Scope) CRC 2.26 Spray 500ml | 1 | Lit | 675 ₹796.5 Lowest | 700 ₹826 |
| 4.10 | LT BREAKERS:Removal of LT Breakers from its chamber, cleaning the breaker, removing old grease, tightness checking grease lubricating, Applying acetone to power terminals, meggering checking the cleaning and tripping operation and put back the breaker again in the original position. | 2 | Nos. | 1,850 ₹2,183 Lowest | 1,900 ₹2,242 |
| 4.20 | Material Cost (Contractor Scope) Supply of Gada cloth for cleaning the LT Breaker 2 Nos. | 1 | Mtrs. | 27 ₹31.86 Lowest | 30 ₹35.4 |
Tender Value
Refer Docs
Closing Date
2 Jun 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle CAD Annual maintenance of Unit III LT 415V AC switch gear Bus modules, Incomer breaker, Tie breaker and 6.6KV/433V, 1600KVA, ACWPH Service Transformer III during the forth coming annual overhaul period 2025 to 2026 in ACWPH
2025_EB_557978_1
CE/SE/O/TTPS/Spec.No.111/25-26
Open Tender
Miscellaneous Works
Item Rate
5 days
TTPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Yes
8 Sept 2025
14 May 2025
3 Jun 2025
14 May 2025
2 Jun 2025
14 May 2025
PANELS: Annual Overhauling works of LT 415 V AC Switch gear and DC switchgear of 220V DC & +24V DC Panels Removal of top cover, hylam separators, cleaning and tightness checking of horizontal and vertical bus (front and rear) including in vertical bus in switch gear panels.
Material Cost (Contractor Scope) Supply of Gada cloth for cleaning the LT Panels 14Nos.
MODULES: Annual Maintenance of LT Modules Removal of modules, external cleaning and tightness checking of terminals, replacement of worn out parts, applying petroleum jelly to finger contacts, greasing of modules and meggering. Size -1 / F Type Modules:
Size -2 / D Type Module:
Size -3 / K Type Module:
Material Cost (Contractor Scope) Supply of Gada cloth for cleaning the LT Modules 14Nos.
Annual Overhauling works of LT 415V AC Switch gear and DC switchgear of 220V DC & +24V DC Panels Removal of the Hylam partition sheet available in front of the vertical bus of the panel both front and rear side and refixing after cleaning in all modules.
Material Cost (Contractor Scope) CRC 2.26 Spray 500ml
LT BREAKERS:Removal of LT Breakers from its chamber, cleaning the breaker, removing old grease, tightness checking grease lubricating, Applying acetone to power terminals, meggering checking the cleaning and tripping operation and put back the breaker again in the original position.
Material Cost (Contractor Scope) Supply of Gada cloth for cleaning the LT Breaker 2 Nos.
TRANSFORMER: Complete cleaning and water washing of 6.6KV/433V, 1600KVA, Service Transformer and cleaning of Neutral grounding resistor.
Material Cost (Contractor Scope) Supply of Gada cloth for cleaning the Transformer-1No
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .