| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.8 LAccepted-AOC | L-1 | Accepted-AOC AOC | |
| 2 | L-2₹5.9 L+₹14,413.40 (2.50%)Rejected-Finance RAHIMPUR VILLAGE BIJNOR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹6.4 L+₹67,099.34 (11.6%)Rejected-Finance H NO 1 SUNDARVAN COLONY MATHURA ROAD HATHRAS UTTAR PRADESH UP | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹6.5 L+₹73,538.43 (12.7%)Rejected-Finance | L-4 | Rejected-Finance L-4 |
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
25 Sept 2023, 11:00 amClosed
EE, BDGC, BSR
EE, BDGC, BSR
REPAIRING and WIDENING OF VRB AT KM. 9.269 and KM 9.855 OF JARCHA DY
2023_UPIDC_836101_35
05/EE/2023-24
Open Tender
Civil Works
Fixed-rate
90 days
Bulandshahr
FEE/EMD/TECH
2 documents required · 2 mandatory
₹266
₹13,000
26 Feb 2024
19 Sept 2023
25 Sept 2023
19 Sept 2023
25 Sept 2023
19 Sept 2023
Amount
Earth work in foundation in wet ordinary soil i/c lift up to 1.50m and lead up to 30.m and filling, watering and ramming etc excluding dewatering
Providing and laying Cement concrete (1:3:6) in with stone ballast 25mm to 10mm granite stone grit, cement , coarse sand including cost of all material, labour and T&P etc.complete.
Brick work in 1:4 cement mortar with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete.
Struck deep pointing in 1:2 on brick masonry ,cement , coarse sand including cost of all material, labour and T&P etc. complete.
Centering & shuttering for R.C.C. Slab abutment cap work etc. including cost of all material, labour and T&P etc. complete.
Steel Reinforcement including cutting, bending, binding, placing in position including cost of all material, labour and T&P etc.complete.
P/F of PVC Pipe 110mm dia including all cost of material, labour and T&P etc. complete.
Providing and laying R C C - M20(1:1.5:3) with cement , coarse sand , and 10mm to 25mm stone grit including cost of all material, labour and T&P etc.complete.
Providing and laying Cement concrete M15 (1:2:4) with cement , coarse sand , and 10mm to 25mm stone grit including cost of all material, labour and T&P etc.complete.
Finishing wall with Weather coat by Premium acrylic exterior Paint applied @ 3.28 ltr/ 10 Sqm (Asian or Berger Brand) of approved Make and quality on wall with two or more coat to give an even shade including a priming coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied@ 2.20 kg/10 sqm after throughly brushing the surface free from mortar dropping and other foreign marrers and sand papered smooth including supply of all material labour tools & Plant etc. required for proper complition of work.
Painting latters 2.5cm but up to 8.0 cm size including all cost of material, labour and T&P etc. complete
Earth work in Embankement by power transported earth with a lead beyond 200m and upto upto 1.00 km including excavation loading, ,unloading, manual compection dressing and all lifts complete excluding royalty
Dismentelling of old/ Damage brick work including disposal up to 60m or as per direction by E. I. C. as per IDSOR
Supply & Fixing of Wheel Gard size 750x200x200 mm with Front Side Fluorescent Paint
Cement plaster in 1:3 with cement , coarse sand mortar including cost of all material, labour and T&P etc. complete.
CHHATAR PAL SINGH CONTRACTOR
RAJ KUMAR AGRAWAL
M/s Prince Construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .