Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹200.5 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹231.6 Cr+₹31.1 Cr (15.5%)Admitted-Finance BLOCK NO 758 EAGLE NEST BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE | 421003 | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical A 7 2 SHIVAJI APARTMENT SECTOR 14 ROHINI DELHI 110085 | DELHI | DELHI | DELHI | 110085 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical PLOT NO 137 2ND FLOOR AVTAR ENCLAVE PASCHIM VIHAR NEW DELHI 110063 | WEST | DELHI | 110063 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Eagle Infra India Ltd L2 | MKS CONSTRO VENTURE PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00EPC AM-II ( 48B) | |||||
| 1.01 | EPC AM-II (48B) - Improvement to Nimgaon fata Narkhed Matargaon MDR 7 km 46/600 to 57/00 Km Total length 10.4 km MDR-49 SH-222 (Matargaon Budruk)- Machindrakhed Taroda Tarodi Yeulkhed Kalkhed Padsul to Adsul Fata to ODR 51 (km 0/000 to 19/000, Total length = 19.000 Km), MDR-71 SH-269 Manasgaon Golegaon Budruk Padsul Adsul Fata Palodi Zadegaon fata Manegaon SH 24 Charmori Railway under pass Shegaon road (km 5/700 to 20/550, Total Length=14.850 Km.) and MDR-7 Alasana Village to MSEB Chowk (Shegaon) (Km.65/00 to 68/00 Total Length -3.00 Km.) 45.00 Km. Taluka Shegaon District Buldhana on EPC Mode | 1 | Lumpsum | 2,31,61,06,936 ₹2,31,61,06,936 | 2,00,50,69,195 ₹2,00,50,69,195 Lowest |
Tender Value
₹214.7 Cr
EMD Value
₹1.9 Cr
Closing Date
3 May 2024, 5:00 pmClosed
Managing Director, MSIDCL
B/13, 13th floor, Bakhtawar building, 229, Nariman Point, Mumbai 400 021
EPC AM-II (48B) - Improvement to Nimgaon fata Narkhed Matargaon MDR 7 km 46/600 to 57/00 Km Total length 10.4 km MDR-49 SH-222 (Matargaon Budruk)-
2024_MSIDC_1031544_18
E-TENDER NOTICE NO.08 OF 2023-2024
Open Tender
Civil Works
Item Rate
912 days
Amravati
As Per Tender Documents
6 documents required · 6 mandatory
₹5,900
₹1.9 Cr
Yes
MSIDCL Office
24 Jun 2024
11 Mar 2024
6 May 2024
11 Mar 2024
3 May 2024
17 Apr 2024
11 Mar 2024 - 16 Apr 2024
16 Apr 2024
Amount
EPC AM-II ( 48B)
EPC AM-II (48B) - Improvement to Nimgaon fata Narkhed Matargaon MDR 7 km 46/600 to 57/00 Km Total length 10.4 km MDR-49 SH-222 (Matargaon Budruk)- Machindrakhed Taroda Tarodi Yeulkhed Kalkhed Padsul to Adsul Fata to ODR 51 (km 0/000 to 19/000, Total length = 19.000 Km), MDR-71 SH-269 Manasgaon Golegaon Budruk Padsul Adsul Fata Palodi Zadegaon fata Manegaon SH 24 Charmori Railway under pass Shegaon road (km 5/700 to 20/550, Total Length=14.850 Km.) and MDR-7 Alasana Village to MSEB Chowk (Shegaon) (Km.65/00 to 68/00 Total Length -3.00 Km.) 45.00 Km. Taluka Shegaon District Buldhana on EPC Mode
Eagle Infra India Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1804204.xls
BOQ • 0.26 MB
141723167.pdf
Tender Documents • 0.09 MB
141723172.html
Tender Documents • 0.03 MB
EPC_AM_II_48B_Schedules.rar
Tender Documents • 4.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .