| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | ₹2.4 Cr | L1 | Accepted-Finance Accepeted Bidder |
| 2 | L1₹2.4 CrRejected-Finance AT KUMARI PO JARAKA DIST JAJPUR | JAJPUR | ODISHA | ₹2.4 Cr | L1 | Rejected-Finance Rejected Bidder |
| 3 | L1₹2.4 CrRejected-Finance AT BARABATI PO BAIDYARAJPUR PS JAJPUR TOWN DIST JAJPUR PIN 755007 | BHADRAK | ODISHA | 755007 | ₹2.4 Cr | L1 | Rejected-Finance Rejected Bidder |
| 4 | L1₹2.4 CrRejected-Finance | ₹2.4 Cr | L1 | Rejected-Finance Rejected Bidder |
| 5 | L1₹2.4 CrRejected-Finance AT KUMARI PO JARAKA PS JARAKA DIST JAJPUR PIN 755050 | JARAKA | JAJPUR | ODISHA | 755050 | ₹2.4 Cr | L1 | Rejected-Finance Rejected Bidder |
Tender Value
₹2.9 Cr
EMD Value
₹2.9 L
Closing Date
5 Dec 2025, 5:00 pmClosed
Chief Construction Engineer,R.W Circle KPD-JJP
O/o CCE,R.W Circle,Kendrapara-Jajpur
Construction of road works
2025_CERWI_121468_29
Tender Online RCK-17/25
National Competitive Bid
Civil Works - Roads
270 days
Jajpur
please refer tender documents
4 documents required · 4 mandatory
₹10,000
₹2.9 L
Yes
30 Apr 2026
24 Nov 2025
6 Dec 2025
24 Nov 2025
5 Dec 2025
24 Nov 2025
24 Nov 2025 - 5 Dec 2025
Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in –charge.
Dismantling of Cement Concrete Grade M-15 & M20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
Upto 600mm dia
Scarifying the existing bituminus road surface to a depth of 50m and disposal of scarified material within all lifts and lead upto 1000mt. and as per the direction of Engineer-in-charge.
Reworking the scarified bituminus surface suitably after supplementing the base materials with stone screened dust compacting finished surface as per Clause No 501.8.3.2 of Mort &H specification for raod & Bridge works (4th Revision) and as per the direction of Engineer-in-charge.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m complete and as per specification and as per the direction of Engineer -in –charge.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).
Construction of granular sub-base by providing close graded granular sub base Grading III material as per table 401-1, spreading in uniform layer with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC ,and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MoSRT&H Specification for Road & Bridge works (4 th Revision)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision).
Construction of Un-reinforced,plain cement concrete pavement M-30 grade over a prepared sub base with 43 grade using brande cement @ 350 kg per cum,coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, spread, compacted finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, finishing to lines and grages as per drawing and as per Clause 602 of MoSRT&H specifications for Road & Bridge Works and as per as per specification & direction of the Engineer-in-Charge.
Fine dressing and turfing to the slopes of the road embankment with compact dub gross transported by mechanical means as per the direction of the E.I.C.
Earth work in excavation of foundation & plinth in hard soil including levelling the bed etc complete as per the direction of Engineer in charge.
Supplying , Laying & Fixing NP3 RCC hume pipe in position for culvert including pointing ends , fixing collars with cement mortar (1:2) including cost conveyance and taxes of hume pipe etc complete and as per the direction of Engineer in charge.
HPC 1000 mm Dia
Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes pre-approved including arranging of reinforcement as per approved drawing including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.
Foundation
Above Bed Level
Cement concrete of M-300 having maximum compressive strength of 300 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes pre-approved including arranging of reinforcement as per approved drawing including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.
Foundation
RCC of design mix of M-25 grade having specified characteristics compressive strength/ target mean strength of 300kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 216/1987/IRC-78/1983 using crusher broken granite course aggregate of 20mm. .sizes & proportion as specified in clause-302.6.2 of IRC 21/1987 & IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering , shuttering & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works)
Cover slab (Drain)
Supply of HYSD bars confirming to grade S-415 cutting bending, binding, lapping, splicing, welding etc. (conforming to ISI specification) & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying position including cost & conveyance of tor steel & binding wires of 18 to 20 gauge(as to be approved by the Deptt.) etc. complete (weight of binding wire shall not be considered for payment at all which will be borne by the contractor (standard CO-efficient of different sizes of the steel shall be considered & welding & lapping should confirm to relevant clause of IRC-21/1987)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be we be welded to 2 nos. 75mmX75mm of12 SWG sheet tubes posts duly embeded in cement concrete M-15 grade block of 450mm X450mmmm X600mm ,600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmX 47mm of 12 SWG steel plate tube. All M.S will be stove embelded on both sides .Lettering and printing arrows border etc. will be painted with ready mixed synthetic enamelpaint of superior quality in required shade andcloure.All sections of framed posts and steel tube will be painted with primer and two coat of epoxy paint as per drawing clause 1701 and Annexure 1700.1
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2 of MoRD
600mm equilateral triangle
600mm Circular
Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 of MoRD
Providing and Fixing Reinforced cement concrete M15 grade Guard stone/local stone of standard design as per IRC:25 fixed position including finishing and lettering but excluding painting as per drawing and Technical specification Clause 1704 of MORD.
Providing and Fixing Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification.
Ordinary Kilometer stone
200 mm stone
Maintenance Work
Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment ,level and slopes as per technical specification Clause 1902
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
Maintenance of BT road including filling up pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B specificatio
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
n Clause 1904.2 ,1906
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912
2 st Year
3 st Year
4 st Year
5 st Year
Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914
2 st Year
3 st Year
4 st Year
5 st Year
Cutting of shrubs from the road way or with in R.O.W and disposal of shrubs to suitable locations as per technical specifications Clause 1914
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
1 st Year
2 st Year
3 st Year
4 st Year
5 st Year
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.06 MB
dtcn17-25.pdf
Tender Documents • 6.25 MB
BOQ_566648.xls
BOQ • 0.29 MB
Corrigendum.pdf
Additional Documents • 0.40 MB
Download all tender documents and submit your bid