| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹2.8 L (1.72%)Admitted-Finance | ₹1.7 Cr+₹2.8 L (1.72%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹20.6 L (12.7%)Admitted-Finance | ₹1.8 Cr+₹20.6 L (12.7%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹26.6 L (16.4%)Admitted-Finance | ₹1.9 Cr+₹26.6 L (16.4%) | L4 | Admitted-Finance |
| 5 | L5₹4.7 Cr+₹3.1 Cr (188.0%)Admitted-Finance 218 2ND FLOOR U S COMPLEX 120 MATHURA ROAD NEW DELHI 110076 | SOUTH | DELHI | 110076 | ₹4.7 Cr+₹3.1 Cr (188.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. P N Construction L4 | M/s.SAI SHREYASI CONSTRUCTION L1 | CIS GLOBAL INFRATECH PVT LTD L5 | Padmanav Lenka L2 | LAXMIDHAR ROUT L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing single under reamed bored compaction pile foundation of 300mm dia & 9m length long with reinforced cement concrete of CC (1:1.5:3) propertion using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream at appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes etc.complete by excluding GST as directed by the Engineer-in-charge.(Excluding cost of reinforcement steel and binding wire). | 112 | Each Nos | 9,500 ₹10,64,000 | 7,500 ₹8,40,000 | 55,000 ₹61,60,000 | 6,800 ₹7,61,600 Lowest | 9,000 ₹10,08,000 |
| 2.00 | Cutting pile head up to cut off level including disposing of the dismantled material out of work site with supply of all materials, labour, T&P, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | 112 | Each Nos | 100 ₹11,200 | 30 ₹3,360 Lowest | 8,500 ₹9,52,000 | 40 ₹4,480 | 450 ₹50,400 |
| 3.00 | Initial load test for pile including kenteledge of required load and supply of all testing equipments including construction of test pile cap and dismantling the same after completion of test and submitting the test report as per ISI 2911(PT-IV) with supply of all labour ,materials ,taxes ,tollage ,royalties, transportation ,T&P etc complete exlcuding GST and as per direction of Engineer-in-charge. | 3 | Each Nos | 15,000 ₹45,000 Lowest | 25,000 ₹75,000 | 40,000 ₹1,20,000 | 18,000 ₹54,000 | 45,000 ₹1,35,000 |
| 4.00 | Routine Laoad test for working pile including kenteledge of required load and supply of all testing equiments including construction of test pile cap and dismantling the same after completion of test and submitting the test report as per ISI 2911(PT-IV) with supply of all labour ,materials ,taxex ,tollage ,royalties, transportation ,T&P etc complete exlcuding GST and as per direction of Engineer-in-charge. | 3 | Each Nos | 20,000 ₹60,000 | 12,000 ₹36,000 | 40,000 ₹1,20,000 | 9,000 ₹27,000 Lowest | 45,999 ₹1,37,997 |
| 5.00 | Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed byEngineer-in-charge | 382 | Each Cum | 200 ₹76,400 | 100 ₹38,200 Lowest | 1,500 ₹5,73,000 | 150 ₹57,300 | 270 ₹1,03,140 |
| 6.00 | Filling in foundation and plinth with excavated all kind of soil including watering and ramming with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed by the Engineer-in-charge | 255 | Each Cum | 150 ₹38,250 | 60 ₹15,300 | 800 ₹2,04,000 | 100 ₹25,500 | 45 ₹11,475 Lowest |
| 7.00 | Fillingin foundation & plinth with saline sand/dredged spoil and conveying the same by private trucks with all lead and lifts, including spreading, leveling, watering, ramming, consolidating with supply of all material, labour, transportation , T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by the Engineer-in-charge. (NB 10% voids will be deducted from the measured quantity) | 1,222 | Each Cum | 150 ₹1,83,300 Lowest | 200 ₹2,44,400 | 2,200 ₹26,88,400 | 300 ₹3,66,600 | 333 ₹4,06,926 |
| 8.00 | P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope consolidating, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge | 162.5 | Each Cum | 5,000 ₹8,12,500 | 4,100 ₹6,66,250 | 8,000 ₹13,00,000 | 4,000 ₹6,50,000 Lowest | 6,300 ₹10,23,750 |
| 9.00Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with supply of all materials, labour, T&P, taxes, tollage transportations, staging, scaffolding, curing, etc. all complete but excluding GST as per direction of Engineer-in-charge. | ||||||||
| 9.01 | For Ground Floor | 253 | Each Cum | 7,000 ₹17,71,000 | 6,100 ₹15,43,300 Lowest | 10,000 ₹25,30,000 | 6,500 ₹16,44,500 | 7,200 ₹18,21,600 |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
3 Oct 2025, 6:00 pmClosed
EE,ECM,PPA
Office of E and CM Division, Engineering Department, Paradip Port Authority, Ground Floor, Administrative Building, Mob-9937675479
Construction of New DG Room (09 Nos.) at Port Township Substations, Paradip Port.
2025_MoS_876157_1
CE/E and CM/Accts-26/24/509
Open Tender
Civil Works
Works
330 days
paradip
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
Yes
As per eTCN and TD
₹3.6 L
Yes
24 Oct 2025
4 Sept 2025
6 Oct 2025
4 Sept 2025
3 Oct 2025
4 Sept 2025
Amount
Providing single under reamed bored compaction pile foundation of 300mm dia & 9m length long with reinforced cement concrete of CC (1:1.5:3) propertion using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream at appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes etc.complete by excluding GST as directed by the Engineer-in-charge.(Excluding cost of reinforcement steel and binding wire).
Cutting pile head up to cut off level including disposing of the dismantled material out of work site with supply of all materials, labour, T&P, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge.
Initial load test for pile including kenteledge of required load and supply of all testing equipments including construction of test pile cap and dismantling the same after completion of test and submitting the test report as per ISI 2911(PT-IV) with supply of all labour ,materials ,taxes ,tollage ,royalties, transportation ,T&P etc complete exlcuding GST and as per direction of Engineer-in-charge.
Routine Laoad test for working pile including kenteledge of required load and supply of all testing equiments including construction of test pile cap and dismantling the same after completion of test and submitting the test report as per ISI 2911(PT-IV) with supply of all labour ,materials ,taxex ,tollage ,royalties, transportation ,T&P etc complete exlcuding GST and as per direction of Engineer-in-charge.
Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed byEngineer-in-charge
Filling in foundation and plinth with excavated all kind of soil including watering and ramming with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed by the Engineer-in-charge
Fillingin foundation & plinth with saline sand/dredged spoil and conveying the same by private trucks with all lead and lifts, including spreading, leveling, watering, ramming, consolidating with supply of all material, labour, transportation , T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by the Engineer-in-charge. (NB 10% voids will be deducted from the measured quantity)
P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope consolidating, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge
Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with supply of all materials, labour, T&P, taxes, tollage transportations, staging, scaffolding, curing, etc. all complete but excluding GST as per direction of Engineer-in-charge.
For Ground Floor
For First Floor
Supply Tor/TMT rebar of minimum grade of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient).
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge.
R.C.C. foundation and footing bases of columns mass concrete & pre-cast slab etc.
Beam, column, girder (GF)
Roof slab, landing, projection Chajja upto 4.30 mtr. (GF)
Beam, column, girder (FF)
Lintel (FF)
Roof slab, landing, projection Chajja upto 4.30 mtr. (FF)
Brick work in Fly Ash Bricks of size 25cmx12cmx8cm having crushing strength not less than 75 Kg/Cm² to 99Kg/Cm² with C.M (1:6) including splay/cutting, racking out the joints curing, hoisting, staging at any height with cost and supply of all materials, labour, T&P, taxes, royalties, transportation charges, curing, testing charges etc. all complete but excluding GST as per direction of Engineer-in-charge
For F&P
For Ground Floor
For First Floor
12 MM thick Cement plaster with cement mortar (1:6) proportion, over brick work including racking out the joints, finished smooth to the exposed surface, rounding the corners wherever found necessary including supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, testing charges, tollage, royalties, etc. complete but excluding GST & as per direction of Engineer-in-charge
For Ground Floor
For First Floor
16 MM thick Cement plaster with cement mortar (1:6) proportion, over brick work including racking out the joints, finished smooth to the exposed surface, rounding the corners wherever found necessary including supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, testing charges, tollage, royalties, etc. complete but excluding GST & as per direction of Engineer-in-charge.
For Ground Floor
For First Floor
6 MM thick Cement plaster with cement mortar (1:4) proportion, over RCC work including racking out the joints, finished smooth to the exposed surface, rounding the corners wherever found necessary including supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, testing charges, tollage, royalties, etc. complete but excluding GST & as per direction of Engineer-in-charge
For Ground Floor
For First Floor
Neat cement punning over cement plaster using cement @2.20 kg/m2 & curing with supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, testing charges, tollage, royalties, etc. complete but excluding GST & as per direction of Engineer-in-charge.
C.C(1:2:4) of using 20 mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope consolidating, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge
25mm. (av) thick graded cement concrete in C.C.(1:2:4) using 12mm. to 6mm. size hard granite chips of approved quality including cleaning the roof top, washing, mixing, hoisting laying to proper level slope, gradient making rounding hunching at the corners, joints, finished smooth to exposed surface over 2 coats of sika topseal-107 or equivalent as water proofing course with supply of all materials, labour, T&P, taxes, tollage transportations, staging, scaffolding, curing, etc. all complete but excluding GST as per direction of Engineer-in-charge.
Supply,fitting,fixing of rain water PVC pipe 110mm dia of approved quality,hoisting in position where found necessary in CM(1:4) including cutting of grooves and supply of all labour, materials, accessories fittings for laying of pipe, T&P,all taxes,transportation,staging, scaffolding etc. excluding cost of GST complete as directed by Engineer-in-charge.
25mm. thick A.S. flooring in cement concrete (1:2:4) at all floors & levels using 12mm. and down grade hard black C.B granite chips of approved quality including mixing, hoisting, laying, compacting, curing, finished smooth to the exposed surface with a floating coat of cement punning, rounding the corners where found necessary including supply of all materials, labour, T&P, taxes, tollage, royalties, transportation charges, etc. complete but excluding GST asdirected by Engineer-in-charge.
Providing, supplying, fitting, fixing of M.S./GI grills for windows of approved quality & design including fabrication charges, with supply of labour and material,machinery, cost of fuel, electrode, gas, consumables hire and running charges of all kind of equipments,taxes,tollages etc all complete but excluding GST as per direction of Engineer-in-charge.
Supplying, fitting and fixing of M.S/GI. pipe gate with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete with supply of labour and material,machinery, cost of fuel, electrode, gas, consumables hire and running charges of all kind of equipments,taxes,tollages etc all complete but excluding GST as per direction of Engineer-in-charge.
Supplying, fitting & fixing of WPC door and window frames of 65mm x 100mm with density 900kg/cum as per requirment with required staging, scaffolding, including all leads & lifts, transportation charges with supply of all labour, T&P, all taxes etc. all complete by excluding GST as directed by the Engineer-in-charge.
Supplying fitting and fixing of 32mm thick WPC door/ window shutters of density 800kg/cum including cost of loading & un-loading charges, stacking at departmental stores with supply of all labour, materials like hinges, towe bolt, handle, aldrop etc. T&P, all taxes, transportation, etc. .all complete but excluding GST as per direction of Engineer-in-charge.
Supplying, fitting, fixing up AL window (sliding type) made up aluminum Section 9778 as window fram, section No. 4095, 4096 & 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber bending including locking arrangement including all fitting including supply of all labour, materials, scaffolding up to any height transportation charges T&P, all taxes etc. all complete by excluding GST as directed by the Engineer-in-charge.
Supplying,fitting fixing of GI Pipe Gate & shed of approved design with 50mm, 40mm and 25mm dia pipe of medium quality of approved design & necessary fittings,clamps,locking arrangement etc.with cost of loading & un-loading, stacking, all complete including cost and supply of all materials, T&P, all taxes, transportation etc. complete excluding GST as per direction of Engineer -in- charge.
40mm dia GI pipe (Medium Quality)
25mm dia GI pipe (Medium Quality)
One coat Priming with water bond cement primer to the newly plaster surface of the exterior Wall or over the exisitng putty surface of the interior wall of approved make & shade manufactured by reputed manufacturer or equivalent to make an even finished surface in all heights with all scaffolding and staging charges including supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc.all complete but excluding GST as per direction of Engineer-in-charge.
Distempering two coats of approved quality and shade to New work including supplying cleaning, brushing, the old paint, removing the flakes and finishing smooth the wall surface by applying plaster of paris or wall putty where required, sand papering including supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc.all complete but excluding GST as per direction of Engineer-in-charge.
Exterior painting two coats to wall surface with acrylic based weather coat paint of approved quality & shade having resistance to Fungus, Fading, including scraping, cleaning, brushing, washing the old paint, with bio wash, removing the flakes applying uniformly two coats including supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc.all complete but excluding GST as per direction of Engineer-in-charge.
Painting two coats with approved quality & shade enamel paint on new iron work / old wood work k over one coat of red oxide primer including scraping, cleaning, the old paint surface sand papering, filling the holes with wax putty etc. all complete including supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc.all complete but excluding GST as per direction of Engineer-in-charge.
Engagement of following machineries, including hire & running charges of machineries, fuel , lubricants , operator expenses , T & P , safety of operator, all taxes excluding GST etc.all complete as directed by the Engineer-in-charge.(N.B : No idle charges shall be paid )
Hydraulic Excavator of 1cum bucket
Tractor
Supply & Engagement of Unskilled labour for cutting the tree branches & Cleaning the area, providing all protective safety measures including T&P, safety of labours, all taxes if any excluding GST etc. all complete as per the direction of Engineer-in-charge.
Supply of 4 C x 06 sq.mm x 1.1KV grade G.I armoured XLPE insulated stranded aluminium conductor cable.etc excluding GST etc all complete as per direction of Engineer-in-charge.
Supply & fixing of 63 Amp. 4-pole MCCB with enclosure box .etc excluding GST etc all complete as per direction of Engineer-in-charge.
Supply & wiring to 4-way BDB having 20 Amp. SP MCB .etc excluding GST etc all complete as per direction of Engineer-in-charge.
Supply of 4' x 40 watt LED Tube Light .etc excluding GST etc all complete as per direction of Engineer-in-charge.
Supply of 1400mm sweep ceiling Fan .etc excluding GST etc all complete as per direction of Engineer-in-charge.
Supply of 450mm sweep Exhaust Fan .etc excluding GST etc all complete as per direction of Engineer-in-charge.
Supply of 150 watt LED Light Fitting .etc excluding GST etc all complete as per direction of Engineer-in-charge.
Wiring to light point with supply of 6 Amp Flush type switch etc excluding GST etc all complete as per direction of Engineer-in-charge.
Wiring to ceiling fan point with supply of 6 Amp Flush type switch & electronic regulator etc excluding GST etc all complete as per direction of Engineer-in-charge.
Wiring to exhaust fan point with supply of 6 Amp Flush type switch etc excluding GST etc all complete as per direction of Engineer-in-charge.
Wiring to 6 Amp. plug point with supply of switch & socket etc excluding GST etc all complete as per direction of Engineer-in-charge.
Wiring to 16 / 20 Amp. plug point with supply of switch & socket etc excluding GST etc all complete as per direction of Engineer-in-charge.
Wiring to 150 watt LED Streetlight with supply of 3C x 1.5 Sq.mm copper flexible cable etc excluding GST etc all complete as per direction of Engineer-in-charge.
Fixing of 4' x 40 watt LED Tube light fitting etc excluding GST etc all complete as per direction of Engineer-in-charge.
Fixing of 150 watt LED streetlight fitting with supply of suitable size of G.I bend pipe etc excluding GST etc all complete as per direction of Engineer-in-charge.
Fixing of Ceiling fan etc excluding GST etc all complete as per direction of Engineer-in-charge.
Fixing of Exhaust fan etc excluding GST etc all complete as per direction of Engineer-in-charge.
Execution of earthing as per I.E rule with supply of all required materials etc excluding GST etc all complete as per direction of Engineer-in-charge.
Laying of 4 x 06 sq.mm, 1.1 KV grade G.I armoured XLPE insulated stranded aluminium conductor cable etc excluding GST etc all complete as per direction of Engineer-in-charge.
Padmanav Lenka (BID ID -3292797)
LAXMIDHAR ROUT (BID ID -3290265)
M/s. P N Construction (BID ID -3287264)
CIS GLOBAL INFRATECH PVT LTD (BID ID -3290508)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .