| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | L1 | Accepted-AOC Less | |
| 2 | L2₹15.5 L+₹25,621.58 (1.68%)Rejected-AOC | L2 | Rejected-AOC Above |
| Sl No | Description | Qty | Unit | RMDCONSTRUCTIONS L2 | HARI SATHISH KUMAR L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Construction of Anganwadi Building at Salabogam in Putheri Panchayat Under MLACDS /2024-25 Estimate Amount : 15.50 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 44.09 | Cum | 266 ₹11,727.94 | 246 ₹10,846.14 Lowest |
| 3.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 11.28 | Cum | 5,136 ₹57,934.08 | 5,116 ₹57,708.48 Lowest |
| 4.00 | Brick work in C.M.1:5 mix using Country bricks including cost and conveyance and all other labour charges etc complete. For 100 Cft or 2.832 Cum | 33.92 | Cum | 5,943.89 ₹2,01,616.75 | 5,923.89 ₹2,00,938.35 Lowest |
| 5.00 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 26.73 | Cum | 8,922 ₹2,38,485.06 | 8,902 ₹2,37,950.46 Lowest |
| 6.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 2.2 | MT | 89,918.22 ₹1,97,820.08 | 89,898.22 ₹1,97,776.08 Lowest |
| 7.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 115.18 | Sqm | 536.5 ₹61,794.07 | 516.5 ₹59,490.47 Lowest |
| 8.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 56.44 | Sqm | 1,053 ₹59,431.32 | 1,033 ₹58,302.52 Lowest |
| 9.00 | Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc | 3.43 | Cum | 3,868.7 ₹13,269.64 | 3,848.7 ₹13,201.04 Lowest |
| 10.00 | Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same | 53.49 | Sqm | 1,287 ₹68,841.63 | 1,267 ₹67,771.83 Lowest |
Tender Value
₹15.5 L
EMD Value
₹15,500
Closing Date
10 Sept 2024, 3:00 pmClosed
The Block Development Officer BP Kancheepuram
The Block Development Office Kancheepuram
Construction of Anganwadi Building at Salabogam in Putheri Panchayat Under MLACDS /2024-25 Estimate Amount.15.50 Lakhs
2024_RDTN_480321_1
RC.No.DRDAKPM/93/2024/A3 Dt.05.08.2024
Open Tender
Civil Works - Buildings
Lump-sum
180 days
Kancheepruram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,500
21 Aug 2025
3 Sept 2024
10 Sept 2024
3 Sept 2024
10 Sept 2024
3 Sept 2024
Amount
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Brick work in C.M.1:5 mix using Country bricks including cost and conveyance and all other labour charges etc complete. For 100 Cft or 2.832 Cum
Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Cupboard Cuddapah slab 40 mm tk inclding supply and fixing etc
Providing 25 mm granolithic floor finish with cc 1:2:4 mix using 10-12 mm chips including cost and conveyance etc,. Complete.
Supply and applying of two coats of Putty of 3mm thick over the exposed RCC of Ceiling including cost and conveyance etcc complete
Shahabad Stone Flooring laying with new Ceramic tiles flooring laying with new ceramic tiles of size 600x600x20 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete. Door 0.90 x 2.10 m
Door 0.90 x 2.40 m
Door 1.10 x 2.40 m
Toilet Door 0.75 x1.50 m
window 1.20 x 1.20 m
window 1.20 x 1.60 m
Ventilater 0.90 x 0.45m
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall ).
Plastic Emulsion painting two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall ).
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 17
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 36
Supply and fixing of single box type Compact flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of Tube Light [SD 88 ]
Supply and fixing of single box type Compact flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of CFL Light
Supply and fixing of European water closet with all fittings etc,. Complete.
Supply and fixing of Baby Friendly Basin
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RMDCONSTRUCTIONS (BID ID -1132883)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .