Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 LAdmitted-Finance | ₹1.5 L | L2 | Admitted-Finance |
| 3 | L3₹2.8 LAdmitted-Finance SALEM | SALEM | ₹2.8 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI MEENATCHI ENGINEERING L1 | Delta Roto Tech Private LimitedV L3 | VIGNESH ELECTRICAL L2 |
|---|---|---|---|---|---|---|
| 1.00Labour charges for Replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 8 MVA,33/11 KV Power Transformer at 33/11KV Vallipatty Substation | ||||||
| 1.01 | Labour Charges for (1)Oil Draining of 4730ltr,(2).Oil Filling of the Transformer - 4730 ltr,(3).Labour Charges for Hot Oil Circulation - 5203ltr ,(4).Labour charges for 8MVA Transformer main tank top cover ,Radiator, and conservator and all inspection manual worm out gasket replacement (include crane charges)(5).Labour charges for one finesh coating of alumuinum painting works with spray gun for transformer complete including cost of paint (6)OLTC Overhauling and replacement of gasket (includeing "o Ring") (7).Filter Machine Transportaion.All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by ContractorSupply and Erection of.(8) 12MM Gasket Sheet - 3 nos,(9).10MM Gasket Sheet - 3 Nos,(10)..8MM Gasket Sheet - 3 Nos,(11).6MM Gasket Sheet - 3 Nos,(12).3MM Gasket Sheet - 1 Nos,(13).1x1 Tuflon Sheet - 1 no ,(14). M42 Bun Washer- 7 Nos | 1 | LS | 1,26,000 ₹1,26,000 | 2,36,491.8 ₹2,36,491.8 | 1,30,000 ₹1,30,000 |
| 1.02 | GST | 1 | percentage | 0.18 ₹22,680 | 0.18 ₹42,568.52 | 0.18 ₹23,400 |
Tender Value
₹1.7 L
EMD Value
₹1,700
Closing Date
12 Feb 2026, 3:00 pmClosed
Superintending Engineer/DEDC/Dindigul
O/o The Superintending Engineer, Dindigul EDC, TNPDCL, Meenatchi Nayakan Patti, Dindigul 624 002 Mobile-9445852664
Dindigul EDC - Works Contract - Replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 8 MVA,33/11 KV Power Transformer at 33/11KV Vallipatty Substation
2026_EB_647868_1
108/DEDC/25-26
Open Tender
Electrical and Maintenance Works
365 days
DINDIGUL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,700
Yes
20 Feb 2026
28 Jan 2026
13 Feb 2026
28 Jan 2026
12 Feb 2026
28 Jan 2026
Labour charges for Replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 8 MVA,33/11 KV Power Transformer at 33/11KV Vallipatty Substation
Labour Charges for (1)Oil Draining of 4730ltr,(2).Oil Filling of the Transformer - 4730 ltr,(3).Labour Charges for Hot Oil Circulation - 5203ltr ,(4).Labour charges for 8MVA Transformer main tank top cover ,Radiator, and conservator and all inspection manual worm out gasket replacement (include crane charges)(5).Labour charges for one finesh coating of alumuinum painting works with spray gun for transformer complete including cost of paint (6)OLTC Overhauling and replacement of gasket (includeing "o Ring") (7).Filter Machine Transportaion.All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by ContractorSupply and Erection of.(8) 12MM Gasket Sheet - 3 nos,(9).10MM Gasket Sheet - 3 Nos,(10)..8MM Gasket Sheet - 3 Nos,(11).6MM Gasket Sheet - 3 Nos,(12).3MM Gasket Sheet - 1 Nos,(13).1x1 Tuflon Sheet - 1 no ,(14). M42 Bun Washer- 7 Nos
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_776709.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid