Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.8 Cr
EMD Value
₹27.6 L
Closing Date
2 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ACE WR Zone Bharatpur
Office of Additional Chief Engineer Water Resources Zone Bharatpur
Construction of Link canal betwecn Kukund river and Gambhir river and cross head regulator, district Bharatpur.
2026_WRDAS_603402_1
ACE NIT 10/2026-27_Kukund
Open Tender
Civil Works
Percentage
730 days
under jurisdiction of EE Bharatpur Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
as per nit
₹27.6 L
Yes
Bharatpur
8 Oct 2026
8 Oct 2026
3 Nov 2026
8 Oct 2026
2 Nov 2026
8 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Pucca bench mark muttam of size 30x30x75 cm in cement concrete (1:3:6) with maximum aggregate size of 40 mm with 75cm long MS angle , size 25x25x5 mm embedded including curing transportation and fixing at site etc. complete with all leads & lifts. | 4 | each | 1,125 | ₹4,500 |
| 2 | Transfer of bench mark either by DGPS or using auto level (doublelevelling) by recording levels at 30 meter interval and marking temporarybench mark at suiatble location. For DGPS survey raw data file and for autolevel survey, level book along with value of bench mark, location andplotting of the survey data is to be submitted to the department..(c) in plain area | 8 | per Km | 1,010 | ₹8,080 |
| 3 | Survey work in a grid at defined interval using Total Station / DGPSinstrument and preparation of Block level plan showing all permanentfeatures/ utilities including trees, for planning of dam/ canal / water course /pipe network alignment and superimposing it on digitalized sajra map anddeveloping contours at interval desired by Engineer Incharge. Block levelplan is to be submitted in hard copy three set and soft copy in Auto Cadformat, using layer system, showing all features.
Note:- Khasra map will be provided by Department (iii) In Plain area - Block level to be taken @ 30 meter grid | 6 | per Hact. | 350 | ₹2,100 |
| 4Transfer of Dam / Canal alignment from sajra map to the ground and takingLevels by Auto level or DGPS, developing L-section and X-section andsubmitting in hard copy three sets and soft copy in Auto Cad format, usinglayer system, showing all features. (Total length of L-section and X-section to be measured for payment) | |||||
| 4.01 | L-section of Dam/ Canal (c) In Plain area - Levels for L-section to be taken at interval 30 meter. | 1.2 | per Km | 1,150 | ₹1,380 |
| 4.02 | X-section of Dam/ Canal (Total length of X-section shall be measured) © In Plain area - Levels for X-section be taken at interval 5meter. | 1.2 | per Km | 1,310 | ₹1,572 |
| 5 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. (a) ordinary | 30,000 | Sqm | 1.45 | ₹43,500 |
| 6 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b)Hard / dense soil | 34,109.55 | Cum | 79 | ₹26,94,654.45 |
| 7 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of at least 95% of Standard Proctor's density | 31,200 | Cum | 33 | ₹10,29,600 |
| 8 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 31,200 | Cum | 11 | ₹3,43,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BidDocumentKukundlink.pdf
Tender Documents • 3.02 MB
BOQ_1069863.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .