| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.6 LAccepted-AOC KENDRA DALURBANDH KENDRA BURDHAN BARDHAMAN BARDHAMAN 713380 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713380 | ₹71.6 L | L1 | Accepted-AOC As recommended by TCR |
| 2 | L2₹73.0 LRejected-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹73.0 L | L2 | Rejected-Finance As recommended by TCR |
| 3 | L3₹74.7 LRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹74.7 L | L3 | Rejected-Finance As recommended by TCR |
| Sl No | Description | Qty | Unit | SINHA ENTERPRISES L1 | SWAPAN KUMAR AKHULI L2 | NANDI ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Installation and commissioning of 1000mm widex 130mtr conveyor Belt in Panel No. PB8,4D/-13L to 4D/-8L of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area | ||||||
| 2.00 | Transportation & installation of complete drive drum, driven
drum with gear motor base frame -10.5MT+discharge unit-
2.5MT+tail end -1MT+Load table-1MT+loop take up with tension
trolley drum-3.60MT+Fix unit-1MT+motor, winch starter &
switches cables etc -2.0MT+1000mm wide conveyor structure
with top, bottom roller & foot stool-130mtr @68Kg/mtr
=8.84MT+2 times Tail end shifting (extension)-2MT= total weight
=32.44MT | 32.44 | MT | 26,421 ₹8,57,097.24 | 26,949.42 ₹8,74,239.18 | 27,543.89 ₹8,93,523.87 |
| 3.00 | Fitting of tail end and discharge scraper. | 2 | NOS | 1,218 ₹2,436 | 1,242.36 ₹2,484.72 | 1,269.76 ₹2,539.53 |
| 4.00 | Belt laying including transporting of belt, jointing, tensioning, trail run etc | 270 | MTR | 558 ₹1,50,660 | 569.16 ₹1,53,673.2 | 581.72 ₹1,57,063.05 |
| 5.00 | Foundation, bolting for fitting of drive unit, discharge unit, loop take up and tail end etc =120nos | 120 | NOS | 448 ₹53,760 | 456.96 ₹54,835.2 | 467.04 ₹56,044.8 |
| 6.00 | Cleaning of coal and unused materials before installation job | 1 | LS | 20,711 ₹20,711 | 21,125.22 ₹21,125.22 | 21,591.22 ₹21,591.22 |
| 7.00 | Fencing of drive ,loop take up and tail end | 1 | LS | 18,274 ₹18,274 | 18,639.48 ₹18,639.48 | 19,050.65 ₹19,050.65 |
| 8.00 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. | 1 | LS | 54,461 ₹54,461 | 55,550.22 ₹55,550.22 | 56,775.59 ₹56,775.59 |
| 9.00 | Dismantling of complete drive drum driven drum with gear
motor base frame -10.5MT+discharge unit-2.5MT+tail end -
1MT+loop take up with tension trolley drum-3.60MT+Fix unit-
1MT+load table 01nos-1MT+ motor, winch starter & switch &
cables etc .- 2MT+1000mm wide conveyor structure with top,
bottom roller & foot stool-120mtr @68Kg/mtr =8.16MT= total
weight = 28.4MT | 29.76 | MT | 10,112 ₹3,00,933.12 | 10,314.24 ₹3,06,951.78 | 10,541.76 ₹3,13,722.78 |
| 10.00 | Taken out and coiling of belt | 240 | MTR | 152 ₹36,480 | 155.04 ₹37,209.6 | 158.46 ₹38,030.4 |
Tender Value
₹71.6 L
EMD Value
₹89,600
Closing Date
8 Sept 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of conveyor belts in RVIIB seam for LHCM1 package of CM project at Nakrakonda Kumardihi-B Colliery under Bankola Area.
2025_ECL_342105_1
ECL/GM/BA/E TENDER/25-26/ENM/77 Dt 22.08.2025
Open Tender
Electrical and Maintenance Works
30 days
Nakrakonda Kumardihi B Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹89,600
29 Jan 2026
22 Aug 2025
9 Sept 2025
22 Aug 2025
8 Sept 2025
22 Aug 2025
22 Aug 2025 - 1 Sept 2025
Amount
Installation and commissioning of 1000mm widex 130mtr conveyor Belt in Panel No. PB8,4D/-13L to 4D/-8L of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area
Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit- 2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-130mtr @68Kg/mtr =8.84MT+2 times Tail end shifting (extension)-2MT= total weight =32.44MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up and tail end etc =120nos
Cleaning of coal and unused materials before installation job
Fencing of drive ,loop take up and tail end
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end - 1MT+loop take up with tension trolley drum-3.60MT+Fix unit- 1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc .- 2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-120mtr @68Kg/mtr =8.16MT= total weight = 28.4MT
Taken out and coiling of belt
Cost of M.S. Nut bolts and washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base and discharge base cement concrete
Installation and commissioning of 1000mm widex 416mtr conveyor Belt in Panel No. PB2,9D/-17L to -25D/-17L of CM Project at Nakrakonda Kumardihi B Colliery
Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit- 2.5MT+tail end -1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-416mtr @68Kg/mtr =28.28MT+6 times Tail end shifting (extension)-6MT= total weight =55.88MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning,trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up and tail end etc =120nos
Cleaning of coal and unused materials before installation job
making of tail end
Fencing of drive ,loop take up & tail end.
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end - 1MT+loop take up with tension trolley drum-3.60MT+Fix unit- 1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc .- 2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-400mtr @68Kg/mtr = 27.2MT+Tail end Shortning 6 times-6MT, total weight = 54.8MT
Taken out and coiling of belt
Cost of M.S. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base and discharge base cement Concrete
Installation and commissioning of 1000mm widex 78mtr conveyor Belt in Panel No. PB2, -9D/-17L to -6D/-17L of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area
Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit- 2.5MT+tail end -1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool- 78mtr@68Kg/mtr=5.30MT=total weight =26.9 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning,trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up and tail end etc =120nos
Cleaning of coal and unused materials before installation job
Fencing of drive loop take up and tail end
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end - 1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc .- 2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-50mtr @68Kg/mtr =3.4MT= total weight = 25MT
Taken out and coiling of belt
Cost of M.S. Nut bolts and washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base and discharge base cement concrete
Total impact of GST for the purpose of CTC
SWAPAN KUMAR AKHULI (BID ID -1178607)
NANDI ENTERPRISE (BID ID -1178622)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid