| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr Quoted ₹2.6 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.8 Cr+₹18.9 L (7.21%)Rejected-Finance | ₹2.8 Cr+₹18.9 L (7.21%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹3.5 Cr+₹87.9 L (33.5%)Rejected-Finance S O SH GHANSARA SINGH R O BARI BADHORI TEHSIL AND DISTRICT SAMBA | ₹3.5 Cr+₹87.9 L (33.5%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹4.9 Cr+₹2.3 Cr (87.0%)Rejected-Finance | ₹4.9 Cr+₹2.3 Cr (87.0%) | L4 | Rejected-Finance Rejected |
Tender Value
₹5.4 Cr
EMD Value
₹10.8 L
Closing Date
9 Jun 2026, 5:00 pmClosed
SE PMGSY Circle Jammu
SUPERINTENDING ENGINEER PMGSY CIRCLE JAMMU NEAR TIGER DIVISION BURMA DWAR OPP MILITARY HOSPITAL SATWARI CANTT JAMMU
Construction and Maintenance of road from L024 (Link road ) Km 1st of Hiranagar OSK road to Rakh Sarkar Package No. JK07-4017, PMGSY-IV, Batch-I of 2026-27, Block Hiranagar, District Kathua (Using Waste Plastic) Length 2.60 Kms)
2026_JKRRD_147750_1
JK074017
Open Tender
Civil Works - Roads
Percentage
305 days
HIRANAGAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
₹10.8 L
Superintending Engineer PMGSY Circle Jammu
8 Jul 2026
19 May 2026
10 Jun 2026
19 May 2026
9 Jun 2026
22 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Hill Road
Excavation in Hilly Areas in Soil by mechanical means
Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 | 1 | Cum | 1 | ₹1 |
| 2 | Construction of Embankment with material obtained from roadway cutting: Construction of embankment with approved material from borrow pits 50% and and available material 50% excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per Technical Specification Clause 301.5. | 1 | Cum | 229.95 | ₹229.72 |
| 3 | Excavation for Structures:- Earthwork in excavation for structures in all kinds of soil, soft and hard rock as per drawings and Technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposing of surplus, un-serviceable Excavated earth as directed at site for safe disposal of same without damaging private/public property, dressing of sides and bottom and backfilling in trenches with excavated suitable material including de watering if required. | 0.6 | Cum | 0.6 | ₹0.36 |
| 4 | Providing and laying of plain cement concrete of Grade M-10 in open foundations complete as per drawings and Technical specifications. Clause 802, 803, 1202 & 1203. including all leads, lifts and carriages of materials by MT complete. | - | Cum | 0.6 | - |
| 5 | Providing and laying PCC grade M-15 in plain cement concrete in foundation complete as per drawing and technical specification clause 802,804,805,807,1202 and 1204 ( For Heights upto 5Mtr.) Including all carriages by Mechanical Transport, leads and lifts | 0.6 | Cum | 0.8 | ₹0.48 |
| 6 | Providing and laying of plain cement concrete of Grade M-15 in substructure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing and form work, all leads, lifts and carriages of materials by MT complete. | - | Cum | 0.8 | - |
| 7 | Providing and laying of plain Cement concrete of Grade M-20 in Sub-Structure/ foundations complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing, form work , all leads, lifts and carriages of materials by MT complete. For height upto 5.00 mtr | 1 | Cum | - | - |
| 8 | Providing and laying reinforced cement concrete of Grade M-25 in Substructures /super structures complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202, 1204, 1205.4 & 1205.5 . Including cost of curing ,and form work , all leads, lifts and carriages of materials by MT complete. | - | Cum | 0.2 | - |
| 9 | Supplying , fitting and placing of HYSD bar reinforcement (Fe415) for RCC work in Sub Structure including bending, binding complete as per drawings & Technical specification Clauses 1002, 1005, 1010 and 1202 including cost of binding wire and also including, all leads , lifts, handling & re-handling and carriage of materials by MT complete. | 1 | MT | - | - |
| 10 | Polygonal/Random Rubble Masonry laid dry un coursed brought to course in sub structure including cost of bond/through stones, all leads, lifts, carriages,of materials by MT handling and re-handling complete. | 0.4 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_230596.xls
BOQ • 0.29 MB
sbdjk074017.pdf
Tender Documents • 1.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .