Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical GREEN PARK NEW AREA MORABADI RANCHI | RANCHI | JHARKHAND | 829205 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical HOUSE NO 872 KUMAR BAGH ROAD ARSANDEY KANKE RANCHI JHARKHAND 834006 | RANCHI | RANCHI | JHARKHAND | 834006 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical H NO 49 KONKA KALAL TOLI MAIN ROAD LOWER BAZAR RANCHI JHARKHAND 834001 | RANCHI | RANCHI | JHARKHAND | 834001 | Admitted-Fee/PreQual/Technical |
Tender Value
₹7.7 L
EMD Value
₹15,500
Closing Date
19 May 2026, 5:00 pmClosed
EE RMC ENG
RMC
Construction of RCC Drain RCC culvert and PCC Road at Road No 18 from the house of arvind singh house to ajay singh house in jagatpuram colony under Ward No 01
2026_UDD_113983_1
275/Eng 2026
Open Tender
Civil Works
Works
60 days
As per NIT and RFP
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹15,500
20 May 2026
14 May 2026
20 May 2026
14 May 2026
19 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | 88.8 | m3 | 151.82 | ₹13,481.62 |
| 2 | Providing ,supplying & spreading of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials , labour, royality and taxes all complete as per specification and direction of E/I (Mode of measurement compacted volume) | 20.26 | m3 | 347.85 | ₹7,047.44 |
| 3 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 34.04 | m3 | 1,756.4 | ₹59,787.86 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:1.5:3 (1 Cement : 1.5 coarse sand zone(III): 3 graded stone aggregate 20mm nominal size) | 33.7 | m3 | 4,961.73 | ₹1,67,210.3 |
| 5 | Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) | 15.46 | m3 | 6,082.45 | ₹94,034.68 |
| 6 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | 7.09 | m3 | 6,308.87 | ₹44,729.89 |
| 7 | Providing Tor steel reinforcement of 8mm ,10 mm, 12 mm and 16 mm dia rods bars as per approved design and drawing with cutting , bending and binding with annealed wire with cost of wire ,removal of rust , placing the rods in postion ( excluding carriage of bars to work site) , all complete as per building specification and direction of E/I.TMT Fe 500 ( only valid for SAIL and TATA steel , JSPL, Electro steel Ltd Bokaro and Vizag (RINL) 8mm | 0.81 | MT | 83,314.02 | ₹67,484.36 |
| 8 | 10mm | 0.99 | MT | 82,096.54 | ₹81,275.57 |
| 9 | Centering and Shuttering including strutting, propping etc and removal of from for Foundation , footing , bases of columns etc for mass concrete. | 140.04 | m2 | 194.5 | ₹27,237.78 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_153986.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .