Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹92.2 LAccepted-AOC | L-1 | Accepted-AOC Work allotted after financial approval form committee | |
| 2 | L-2₹95.9 L+₹2.1 L (2.29%)Accepted-AOC | L-2 | Accepted-AOC Work not allotted | |
| 3 | L-3₹100.0 L+₹6.2 L (6.60%)Accepted-AOC | L-3 | Accepted-AOC Work not allotted | |
| 4 | L-4₹1.1 Cr+₹16.1 L (17.2%)Accepted-AOC 2 1433 D 6 KAMAL COLONY SAHARANPUR UP PIN 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | L-4 | Accepted-AOC Work not allotted | |
| 5 | L-5₹1.1 Cr+₹16.5 L (17.6%)Accepted-AOC | L-5 | Accepted-AOC Work not allotted |
| Sl No | Description | Qty | Unit | Navjeet Industries L4 | M/S Sushil Kumar L6 | M/S S.P. & CO L2 | M/S SURYA ELECTRICALS L3 | Gowri Associates L1 | Nutech Air Projects L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Part-A (Supply of Material)
Supply of Lugs (size 400 SQMM) suitable for 250 KVA distribution T/Fs | 1,176 | Nos. | 90.86 ₹1,06,851.36 Lowest | 377.6 ₹4,44,057.6 | 339.84 ₹3,99,651.84 | 271.4 ₹3,19,166.4 | 129.8 ₹1,52,644.8 | 332.76 ₹3,91,325.76 |
| 2.00 | Fuse wire 8 SWG as per requirement | 147 | Kg. | 182.9 ₹26,886.3 Lowest | 1,557.6 ₹2,28,967.2 | 736.32 ₹1,08,239.04 | 2,029.6 ₹2,98,351.2 | 1,427.8 ₹2,09,886.6 | 2,584.2 ₹3,79,877.4 |
| 3.00 | LT Protection pannel with 03 No. of ckt by stud type Tell less fuse unit 500 A | 147 | Nos. | 58,705 ₹86,29,635 | 48,970 ₹71,98,590 | 48,568.8 ₹71,39,613.6 | 48,144 ₹70,77,168 Lowest | 55,342 ₹81,35,274 | 60,180 ₹88,46,460 |
| 4.00 | Nut & Bolt as per requirement | 10 | Kg. | 123.9 ₹1,239 | 312.7 ₹3,127 | 141.6 ₹1,416 | 259.6 ₹2,596 | 94.4 ₹944 Lowest | 312.7 ₹3,127 |
| 5.00 | GI Earth Wire | 10 | Kg. | 241.9 ₹2,419 | 259.6 ₹2,596 | 141.6 ₹1,416 | 200.6 ₹2,006 | 76.7 ₹767 Lowest | 312.7 ₹3,127 |
| 6.00 | Clamp angle for Pannel mounting support | 294 | Nos. | 241.9 ₹71,118.6 | 531 ₹1,56,114 | 1,345.2 ₹3,95,488.8 | 1,534 ₹4,50,996 | 135.7 ₹39,895.8 Lowest | 885 ₹2,60,190 |
| 7.00 | Boot & Sleeves | 147 | Nos. | 2,242 ₹3,29,574 | 2,301 ₹3,38,247 | 2,124 ₹3,12,228 | 4,130 ₹6,07,110 | 324.5 ₹47,701.5 Lowest | 1,003 ₹1,47,441 |
| 8.00 | Heavy Duty Connector (Torque Controled shear bolted) | 2,352 | Nos. | 218.3 ₹5,13,441.6 | 885 ₹20,81,520 | 283.2 ₹6,66,086.4 | 318.6 ₹7,49,347.2 | 171.1 ₹4,02,427.2 | 41.3 ₹97,137.6 Lowest |
| 9.00 | Part-B (Erection work)
Cartiage of LT Cable for size 1x400 sqmm & LT Cable for size 1x150 sqmm Lead from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | 3,675 | Mtr. | - | - | - | - | - | - |
| 10.00 | Cartiage of Earthing Rod Complete from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | 147 | Nos. | - | - | - | - | - | - |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
18 Jul 2025, 1:00 pmClosed
SE
EDC, B 690, Kamla Nagar, Agra
Protection work of 250 KVA distribution Transformers in Business Plan 2024-25 on Semi-Turnkey basis under the area of EDD-Sikandra, Agra
2025_DVVNL_1054517_1
13/EDCA/2025-26
Open Tender
Electrical Works
Piece-work
90 days
EDC, B 690, Kamla Nagar
As per tender specification
2 documents required · 2 mandatory
₹5,900
www.dvvnl.org
₹1.3 L
13 Jan 2026
5 Jul 2025
18 Jul 2025
5 Jul 2025
18 Jul 2025
5 Jul 2025
Part-A (Supply of Material) Supply of Lugs (size 400 SQMM) suitable for 250 KVA distribution T/Fs
Fuse wire 8 SWG as per requirement
LT Protection pannel with 03 No. of ckt by stud type Tell less fuse unit 500 A
Nut & Bolt as per requirement
GI Earth Wire
Clamp angle for Pannel mounting support
Boot & Sleeves
Heavy Duty Connector (Torque Controled shear bolted)
Part-B (Erection work) Cartiage of LT Cable for size 1x400 sqmm & LT Cable for size 1x150 sqmm Lead from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
Cartiage of Earthing Rod Complete from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
Construction of Foundation (30 cm height) for LT Protection Pannel with Material as cement, sand, brick, grit stones etc. including plastering all over the foundation above the ground lavel with proper watering & curing. (required material and T&P shall be provided by the contractor at his own cost to complete the wok in totality)
Laying of LT Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer.
Laying of LT Cable 1x150 sqmm as per RESPO Norms and direction by superivising Engineer.
Fixing of Earth Rod Complete as per RESPO mannual norms and direction by superivising Engineer.
M/S S.P. & CO (BID ID -5349545)
M/S SURYA ELECTRICALS (BID ID -5353916)
Navjeet Industries (BID ID -5318063)
Nutech Air Projects (BID ID -5349112)
M/S Sushil Kumar (BID ID -5349542)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .