Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 LAccepted-Finance | ₹1.4 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹1.4 L+₹1,430.89 (1.02%)Rejected-Finance 561 8 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | ₹1.4 L+₹1,430.89 (1.02%) | L-2 | Rejected-Finance L-2 |
Tender Value
₹1.4 L
EMD Value
₹14,309
Closing Date
20 May 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
Imp of C.T.U. POINT in kalyanpur panki road chungi police chauki transformer in ward 19 Under Zone 6.
2026_NNKAN_1150477_1
960/AA-6/2025-26
Open Tender
Civil Works
Percentage
30 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹14,309
26 May 2026
19 May 2026
20 May 2026
19 May 2026
20 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m, as per directed by engineer-in-charge:2.1.1 all kind soil | 18 | sqm | 170 | ₹3,060 |
| 2 | Earth work in excavation in by mechanical means (hydraulic excavator) trenches for foundation pipe cable etc in o ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. Ch-4.2.8.1 | 4.62 | cum | 215 | ₹993.3 |
| 3 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P, etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors.Schedule-Ch-5,1,pwd(273) | 1.05 | cum | 4,380 | ₹4,599 |
| 4 | Brick work with common burnt clay (non modular) bricks of brick 150 in foundation and plinth in 1:4 cement & coarse sand mortar in supply of all materials, labour and tools and plants etc. required for proper completion of the work. Etc all complete.Ch-6,6.1.1 | 2.84 | cum | 6,600 | ₹18,744 |
| 5 | 12 mm cement plaster of mix 1:4 (1 cement :4 fine sand) including material all complete. | 22 | sqm | 182 | ₹4,004 |
| 6 | construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete | 5.76 | cum | 3,671 | ₹21,144.96 |
| 7 | Providing & Laying of Rubber moulded interlocking Concrete Block with 80mm thick ICBP(75% Gray & 25% Red/Yellow coloured) having strength not less than 30KN/m2 complete as per Technical Specification Clause 1500. | 72 | sqm | 925 | ₹66,600 |
| 8 | cartage of earth upto 3km including loading and unloading incl mat all complete. | 18.1 | cum | 116.96 | ₹2,116.98 |
| 9 | TAX18% | 1 | TaX | 21,827.2 | ₹21,827.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.66 MB
BOQ_2154366.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .