Project Manager Unit 12
129 K K PURI AWAS VIKAS JHANSI
Construction of Community hall in the village of Sitaura in the Chirgaon Development Block
2026_UPPRC_1128918_12
07/PM12/UPPCL/2025-26
Open Tender
Civil Works
Percentage
30 days
Jhansi
AS PER NIT
2 documents required · 2 mandatory
₹5,900
₹28,000
Yes
20 Apr 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
23 Mar 2026 - 28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SAMUDAYIK BHAVAN Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge. All kinds of soil | |||||
| 2Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | |||||
| 3Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors. | |||||
| 4Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | |||||
| 5Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (Lintel) Up to plinth level | |||||
| 6Above plinth level | |||||
| 7As in item no. 6 above but for Beam (Using 1:1.5:3 Mix concrete) Above plinth level | |||||
| 8As in item no. 6 above but for Footing (Using 1:1.5:3 Mix concrete) | |||||
| 9As in item no. 6 above but for Column (Using 1:1.5:3 Mix concrete) Up to plinth level | |||||
| 10Above plinth level | |||||
stage.html
html • 0.04 MB
technical_2105854.pdf
techsummary_2105854.pdf
finance_2105854.pdf
BOQ Comparative Chart
xlsx
finsummary_2105854.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.87 MB
NIT13.pdf
Tender Documents • 5.86 MB
BOQ_2105854.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].