Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹12.1 L+₹63,601.61 (5.55%)Accepted-Finance | L2 | Accepted-Finance Accept | |
| 3 | L3₹12.6 L+₹1.1 L (9.92%)Accepted-Finance | L3 | Accepted-Finance Accept | |
| 4 | L4₹12.7 L+₹1.2 L (10.7%)Accepted-Finance HIMACHAL PRADESH HP | SHIMLA | HIMACHAL PRADESH | 171226 | L4 | Accepted-Finance Accept | |
| 5 | L5₹12.7 L+₹1.2 L (10.9%)Accepted-Finance VILL RAKRIAL PO JHANIARA TEHSIL DISTT HAMIRPUR HP | L5 | Accepted-Finance Accept |
Tender Value
₹16.1 L
EMD Value
₹31,710
Closing Date
7 Jul 2023, 5:00 pmClosed
Executive Engineer
JSV Bhoranj
Site development and construction of Retaining wall
2023_HPIPH_75583_1
EE.BHJ.tender-2023-1486-1546 DT 28-06-2023
Open Tender
Civil Works
Item Rate
120 days
EE BHJ
Please refer Tender documents.
5 documents required · 5 mandatory
₹400
EE Bhoranj
₹31,710
8 Jul 2025
28 Jun 2023
10 Jul 2023
28 Jun 2023
7 Jul 2023
28 Jun 2023
Amount
Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs in Pick, jumper work as per direction and to the entire satisfaction of Engineer-in-Charge.
Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts.(pick jumper work)
Providing and laying cement concrete 1:3:6 ( 1 cement:3 sand :6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth.
Providing form work of steel shuttering with steel plat as 3.15mm thich welded with angle iron in frame 30x30x5mm so as to fair finish including centring, shuttering floor two seiling not exceeding 4 mtrs. And removal of the same for insiturein forced conerete and plain concrete work in:-
Foundations, footings basis of column etc. as per direction and to the entire satisfaction of the Engineer-in-Charge.
Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Providing and laying cement concrete work 1:2:4 (1 Cement: 2 sand :4 graded stone aggregate 20mm nominal size ) and curing complete excluding the cost of form work and reinfocement for reinforced concrete work in :
Foundation, footing, basis of columns and the like mass concrete.as per direction and to the entire satisfaction of Engineer-in-Charge.
Walls (any thickness but not less than 0.10 mtr thickness) including attached pillaster buttresses, plinth and string courses from top of foundation up to all floor level as per direction and to the entire satisfaction of Engineer-in-Charge.
Providing tor steel reinforcement for RCC work including bending binding and placing in position complete upto floor two level including carriage of material in all leads & lifts
Monika Chandel
Ram Krishan
Mr. Sanjeev Kumar
Pawas Soni
Vishal Rana
PRAVEEN CHANDEL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .